Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2009.09a
- /
- Pages.1057-1064
- /
- 2009
The Points of Issue and Countermeasure for Sediment Control Dam Designs
사방댐 설계방법의 문제점과 그 대책
- Kim, Woon-Hyung (Development Center, Dasan Consultansts co., Ltd.) ;
- Song, Byung-Woong (Development Center, Dasan Consultansts co., Ltd.) ;
- Kim, Burm-Suck (Development Center, Dasan Consultansts co., Ltd.) ;
- Kim, Ju-Han (Development Center, Dasan Consultansts co., Ltd.) ;
- Lee, Kyung-Hee (Development Center, Dasan Consultansts co., Ltd.)
- 김운형 ((주)다산컨설턴트 기술연구소) ;
- 송병웅 ((주)다산컨설턴트 기술연구소) ;
- 김범석 ((주)다산컨설턴트 기술연구소) ;
- 김주한 ((주)다산컨설턴트 기술연구소) ;
- 이경희 ((주)다산컨설턴트 기술연구소)
- Published : 2009.09.25
Abstract
Since the global warming causes debris flow damage has increased in Kangwon Area, Sediment control dam have increasingly founded to protect the damage. In spite of the realities design methods are well not established to determine type of the dam, design parameters and maintenance. Through comparison for design methods to sediment control dam in Korea, it raised some points to improve to correspond with realities. In addition, it pointed that some issues for the sediment control dams in Kangwon Area. Those are shown that unclear positions of the dams, unremoval of sediment, occurrence of seepage under the dams and uninstallation of roads to remove sediment. In addition, the countermeasure for the issues are proposed.