The fate and transport mechanism of pollutants which have affinities to particles, such as trace metals and some petroleum product based compounds, can be effectively explained by the movement of sediment. The sediment release from lands to adjacent water bodies due to rainfall events was investigated in an effort to predict the total suspended solids (TSS) concentrations in runoff. The contribution of sediment from land origin to the river TSS can be better understood by the relationship between TSS concentration and particle size in runoff. The sieve analysis was used to determine the particle size distribution and these results were incorporated into statistical models. The critical size of particles was set to $74{\mu}m$ which contributes to the river TSS concentration since fine particles (wash load) of the sediment in the runoff play the key role in constituting TSS in a water column of the river. Empirical relationships were developed to predict TSS in runoff from the percentage of the critical particle size and were proven statistically to be valid.
This study was performed to investigate the riverbed structure and the pollution type in Nakdong River, Western Nakdong River. and Suyoung Stream. Sediment and water samples were collected at is in Nakdong River. in Western Nakdong River, and 8 states In Suyoung Stream from February 20, 1997 to June 15, 1997. The depth distributions of sampling sites in the three streams were measured and heavy metals(Cd, Pb, Cr, Cu) and pesticides in sediments and COD, BOD, and total nitrogen(T-N) in water samples were analysed. The deepest and the shallowest sites were strate 11(11.58m) and 9(3.35m) in Nakdong River, site 7(6.25m) and 4(2.06m) in Western Nakdong River, and site 8(2.89m) and 1(0. 61m) in Suyoung Stream , respectively. The mean concentration of Cd(45.79ppm) was higher In the sediment of Western Nakdong River than In other two streams and those of Pb(76.25ppm), Cr(48.13ppm), and Cu(77.50ppm) were higher in file sediment of Suyoung Stream than in other two streams. Pesticides(1 kind of organophosphorus and 3 kinds of organochlorine pesticide) were detected only in the sediment of Western Nakdong River. The mean concentrations of COD(20.26ppm), BOD(25.36ppm), and T-N(18.05ppm) were higher in the water sample of Suyoung Stream than In other two streams.
Park, Sang-Kil;Han, Chong-Soo;Roh, Tae-Young;Park, O-Young;Ahn, Ik-Seong;Lee, Ji-Hun
International Journal of Ocean System Engineering
/
v.1
no.4
/
pp.185-191
/
2011
This research was described the prevention of coastal topographical change and sediment diffusive concentration incoming from small estuary after construction jetties. This structure is constructed to decrease sediment deposition incoming from the upstream river due to the urbanization and industrial development and to minimize effects on the coastal ecosystem. The physical modeling and numerical modeling for waves were conducted to analyze the configuration of Imrang sand beach deformation without and with construction of jetty. The specification of the installed jetty, which is able to control sedimentation concentration was decided based on the prediction of the Imrang beach area changes by space and time. As a result, the jetties constructed in the estuary retarded the rate of sand sediment, so that the effect area of sand sedimentation was obviously decreased. In addition, the measured field data indicated that the sediment deposition inside of dikes could be controlled and the right side area of jetties could be preserved without sediment deposition.
Figueroa, Steven M.;Lee, Guan-hong;Chang, Jongwi;Schieder, Nathalie W.;Kim, Kyeongman;Kim, Seok-Yun;Son, Minwoo
Proceedings of the Korea Water Resources Association Conference
/
2022.05a
/
pp.86-86
/
2022
While estuarine dams can develop freshwater resources and block the salt intrusion, they can result in increased sediment deposition in the estuary. The mechanism of increased sediment deposition in an estuary with an estuary dam is not well understood. To fill this knowledge gap, 7 ADCP measurements of flow and suspended sediment concentration (SSC) were collected along-channel in an estuary with an estuarine dam over a neap-spring cycle. Flow and SSC were used to calculate the sediment flux and sediment flux gradients. The results indicated that the cumulative sediment fluxes at all stations were directed landward. The along-channel sediment flux gradient was negative, which indicated deposition along the channel. The landward mean-flow fluxes were dominant in the deep portion of the channel near the estuary mouth, whereas landward correlation fluxes were dominant in the shallow portion of the channel near the estuarine dam. The tides were the dominant forcing driving the sediment fluxes throughout the estuary.
This Analysis was conducted for 13 toxic-PCBs having TEF value among 209 PCBs isomers in sediment by isotope dilution HRGC/HRMS method. From the result, the recovery of surrogate standard was in the range of 71~99%. The concentration range for 13 toxic-PCBs in sediment was found to be 0.84~2.49 ng/g, among them the concentration levels of 2,2',3,3',4,4',5-HpCB(IUPAC No. 170) and 2,2',3,4,4',5,5'-HpCB(IUPAC No. 180) represented almost 50% of total concentrarion and that of 2,3,4,4,5-PeCB(IUPAC No. 114) showed over 10%. The TEQ concentration levelwas in the range of 0.38~2.63 pg-TEQ/g and 3,3',4,4',5-PeCB(IUPAC No. 126) concentration represented over 50% of total TEQ concentration.
A windows-based software package, named DREDGE, is developed for estimating sediment resuspension and contaminant release during dredging operations. DREDGE allows user to enter the necessary dredge information, site characteristics, operational data, and contaminant characteristics, then calculates an array of concentration using the given values. The program mainly consists of the near-field models, which are obtained empirically, for estimating sediment resuspension and the far-field models, which are obtained analytically, for suspended sediment transport. A linear equilibrium partitioning approach is applied to estimate particulate and dissolved contaminant concentrations. This software package which requires only a minimal amount of data consists of three components; user input, tabular output, and graphical output. Combining the near-field and far-field models into a user-friendly windows-based computer program can greatly save dredge operator's, planners', and regulators' efforts for estimating sediment transports and contaminant distribution.
This study was performed : 1) to establish the experimental analysis conditions for the sorption and desorption of toxic organic contaminants to/from the activated sludge, sediment, and clay, and 2) to determine the sorption and desorption equilibrium coefficients of some representative halogenated aliphatic compounds. Through the preliminary sorption test using Azo dye, a setting of quantitative experimental conditions to determine the sorption and desorption characteristics was decided as follows; equilibration time of 180 minutes, centrifuge for 15 minutes at 5000$\times$g, and 500mg/$\ell$ of TOC concentration. The sorption and desorption characteristics of halogenated aliphatic compounds onto activated sludge, sediment and clay could be described very well using the Freundlich isotherm. The preference of the average sorption capacity of the overall compounds showed in the sequence sediment 0.26mg/g, clay 0.23mg/g, and activated sludge 0.11 mg/g. The desorption rate of the sorbed compounds onto activated sludge, sediment and clay was approximately 89.8%, 35.3%, and 66.4%, respectively.
The higher bacterial numbers on clay than on sand were caused by different environmental factors. Such factors affecting the adsorption of E. coli ATCC 11775 in the sediment as follows; optimal pH range for the adsorption of E. coli ATCC 11775 was pH 7.5-pH 9.5. E. coli ATCC 11775 were shown maxima in the salinity of 18.$75%_{o}$ on sand type sediment and $12.5%_{o}$ on clay type sediment. Bacteria attached better to clay typed sediment than to sand typed sediment when organic substance was eliminated. Beef extract of 0.5%-1% concentration was found to promote the attachment of E. coli ATCC 11775 effectively. Peptone of 0.5% was enganced the attachment on the clay, and peptone of 1.3%-5%, on the sand. E. coli ATCC 11775 was found to adsorb onto benthonite with the highest efficiency and on celite with the lowest efficiency. Efficiency of adsorption by inorganic ions was shown due to higher values of ion. Adsorption was achieved in the order of $Al^{3+}, Ca^{2+}, Na^{+}$.
PCBs have been measured using GC-ECD, GC-MS, GC-ELCD, HPLC, TLC, NMR and Immunoassay. The analysis of PCBs using GC-ECD include the peak pattern method as none derivatization and the Perchlorination method as derivatization. This study was conducted to establish the perchlorination method with Sbcls from PCBs to decachlorinated biphenyl(DCB). The aroclor 1242 of PCBs was chlorinated and then, converted into the DCB which showed a single peak in GC-ECD chromatogram. The detection limit of DCB was 2pg. The quantification detection concentration of PCBs extracted with soxhlet was 0.5ng/g in the soil. PCBs were not detected in the suburban soil, but 174ng/g in the soil of industrial complex. Mean PCBs concentration of Shinchun stream at Kumho river and Jinchun stream at Nakdong river was calculated average 낙ngjg in 각e sediment. PCBs concentration in the sediment of Kumho river near 2-7km from conjunction with Nakdong river was average 154ng/g. PCBs concentration in the sediment of Nakdong river near conjunction with Kumho river was average 159ng/g.
Moon, Moon, Chul-Ho;Choi, Choi, Sang-Ki;Kim, Kim, Jung-Ho
Journal of Environmental Science International
/
v.4
no.3
/
pp.249-258
/
1995
PCBs have been measured using GC-ECD, GC-MS, GC-ELCD, HPLC, TLC, NMR and Immunoassay. The analysis of PCBs using GC-ECD include the peak pattern method as none derivatization and the Perchlorination method as derivatization. This study was conducted to establish the perchlorination method with Sbcls from PCBs to decachlorinated biphenyl(DCB). The aroclor 1242 of PCBs was chlorinated and then, converted into the DCB which showed a single peak in GC-ECD chromatogram. The detection limit of DCB was 2pg. The quantification detection concentration of PCBs extracted with soxhlet was 0.5ng/g in the soil. PCBs were not detected in the suburban soil, but 174ng/g in the soil of industrial complex. Mean PCBs concentration of Shinchun stream at Kumho river and Jinchun stream at Nakdong river was calculated average 낙ngjg in 각e sediment. PCBs concentration in the sediment of Kumho river near 2-7km from conjunction with Nakdong river was average 154ng/g. PCBs concentration in the sediment of Nakdong river near conjunction with Kumho river was average 159ng/g.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.