• Title/Summary/Keyword: School building site

Search Result 300, Processing Time 0.025 seconds

Evaluation on In-Site Compressive Strength of High-Strength Concrete Mass Elements under Cold Weather (혹한기 고강도 콘크리트 매스부재의 현장 압축강도 평가)

  • Mun, Jae-Sung;Yang, Keun-Hyeok;Kim, Do-Gyeu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.589-595
    • /
    • 2015
  • This study evaluated the in-site compressive strength development of high-strength concrete developed for the mass structures under cold weather condition. Two mock-up wall specimens with $2.0{\times}1.2{\times}1.0m$ in dimension were cured under an average temperature of $5^{\circ}C$. Core strengths measured at different locations of the mock-up walls were compared with the companion standard cylinder strengths. Test results revealed that the core strength of mock-up walls at an age of 3 days is higher by approximately 30% than the companion cylinder strength because of the high curing temperature effect generated from the heat of hydration of cementitious materials. Furthermore, comparisons with the prediction models based on maturity function confirmed that the effect of hydration heat on the curing temperature increase needs to be reflected to reasonably evaluate the on-site compressive strength development of concrete for mass elements.

Development of Accident Cases-based Fire Risk Assessment Checklist for Active Response on Construction Sites (사례분석을 통한 건설현장 화재위험도 평가 체크리스트 개발)

  • Shin, Jae-Kwon;Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.1
    • /
    • pp.79-86
    • /
    • 2021
  • On the construction site, there exists frequently a high likelihood that a fire accident can lead to a large-scale disaster. In the previous studies, the diverse outcomes have been focused on the improvement of relative statutes and tried to realize the suppression and confrontation of the fire accidents. In this study, the limitations on the site were identified through prior research reviews, and the fire risk assessment checklist was proposed through the analysis of the massive accident cases. The checklist was divided into the prevention and minimization steps and developed into 16 categories of total risk factors. According to the results from the cases applied in this study, if the installation status is checked, such as removing combustibles, and broadcasting facilities for evacuation are installed, it is expected that the casualties will be minimized or zeroed. By developing a fire risk assessment checklist, this study provides the implications of the theoretical and realistic fire accident prevention, and supports the ways to minimize the damage resulted from the fire accidents on construction sites. In the further, deriving universe and common items about repeated occurrences of a work type will be needed as a subsequent research.

Assessment of Quality Assurance in the Lifting and Assembly Phase of Modular Construction: An Importance-Performance Analysis Approach (중요도-성취도 분석을 이용한 모듈러 건축프로젝트 현장설치 및 양중 단계의 품질 관리방안에 관한 연구)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.595-605
    • /
    • 2023
  • With the escalating prevalence of modular construction projects, there is a concurrent surge in scholarly and industrial intrigue in this domain, leading to a broadened spectrum of its applications. Modular construction, inherently facilitated by controlled factory settings, boasts the capability to consistently deliver edifices of superior quality. To optimize this advantage, the judicious integration of quality assurance methodologies during the site-specific phases of lifting and assembly is non-negotiable. This research embarked on a survey directed at project stakeholders, aiming to gauge the perceived significance and efficaciousness of prevailing quality preservation and oversight protocols during the aforementioned site stages, subsequently employing the Importance-Performance Analysis(IPA) for data interpretation. The findings elucidated that, while a majority of quality assurance procedures were adeptly executed, perceptual disparities existed among stakeholders regarding certain aspects, prompting recommendations for enhancement. This investigative endeavor lays a foundation, aiding future studies in amplifying the quality assurance cognizance among professionals during modular construction's site-assembly phase.

A Study on Korean-chinese Elementary School Facility In China Yanji (중국 연길시 조선족 소학교시설 기초연구)

  • Kim, Jong-Young
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.18 no.3
    • /
    • pp.13-21
    • /
    • 2011
  • Yanji city in China is a city most populated with Korean-chinese. This study is to examine architectural planning characteristics for Korean-chinese Elementary schools in Yanji city. Currently, this city includes nine Korean-chinese schools. This research has been processed with regards to three broad aspects. Firstly changing processes of school systems, secondly local distributions and networks of school facilities, and thirdly site plans, floor plans and elevations of school buildings were analyzed and examined for finding their characteristics. For this study, seven Han-chinese Elementary schools were also analyzed. The study result are as following: 1. Korean-chinese schools have followed national education policies and also maintained Korean-chinese native education methods. The schools have undergone merger and separation with Han-chinese Elementary schools. Three Korean-chinese Elementary schools in Japan Colonials, two schools in the period of the Republic of China foundation and its growing, and four schools in 1980s were founded. 2. Yanji city administers the networks of Korean-chinese school districts and Han-chinese districts separately. All school districts apply to lkm standard as attending distance. The networks are adjusted as per population change. 3. The characteristics of buildings' site plans, floor plans and elevations are simple. Layouts of the schools are - type or -type centered playground. Building plans show one side corridor type and 5 stories mostly. Elevations stress central parts. Various forms such as finger types do not appear in mass planning since the school curriculum and extracurricular activities are not seemingly active. Han-chinese Elementary schools have similar conditions.

  • PDF

Safety Perception Level of Workers in Construction Site According to NOSACQ-50 (NOSACQ-50을 활용한 건설현장 작업자들의 안전 인식 수준에 관한 연구)

  • Ha, Seung-Yong;Kim, Sun-Kuk;Son, Seung-Hyun;Ha, Sun-Geun;Son, Ki-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The purpose of this study is to analyze safety perception level of workers in construction site according to NOSACQ-50. To achieve the objective of this study, First, literature review is conducted to clearly define the concept of safety climate. Second, NOSACQ-50 is used to survey the level of safety climate of workers. Third, statistical analysis based on collected data is conducted to examine the level of safety climate. As a result, the level of safety climate in South Korea was found to be serious comparing with the standard value proposed in NOSACQ-50. Finally, the improvements were suggested after investigating the key factors on the level of safety climate. In the future, this study will be used as a baseline for developing safety awareness assessment tools such as NOSACQ-50 for domestic construction sites.

An Empirical Study on the Relay Pumping Method for the High Pressure of Fire Engine Pump (소방펌프차의 고압방수를 위한 중계방수방식에 관한 실증적 연구)

  • Min, Se-Hong;Kwon, Yong-Joon;Park, Jong-Deok
    • Fire Science and Engineering
    • /
    • v.27 no.1
    • /
    • pp.52-59
    • /
    • 2013
  • In this study, tests were conducted to establish a fire engine of relay waterproof and utilization in order to maintain the pressure in a situation that require high-pressure water-resistant such as a high-rise building fire, etc. As a result of test on the change of a relay waterproof pressure, the measurement result with the hydrant intake of a fire engine opened has reduced approximately 20 % compared to the measurement result with the hydrant intake closed. Similar efficiency showed in the test result that change the pressure of 2 fire engines respectively to use them more efficiently at a fire fighting activity site. A fire engine operation and utilization is proposed based on this study result in order to cope effectively with a fire site requiring high-pressure stream in a high-rise building fire, etc. by using a fire engine held at present because there is no fire pump with high-pressure stream ability arranged at the fire station and there is no regulation on high-pressure fire-fighting pumps in a type approval and verification technology criterion for a fire engine.

AUTOMATIC DATA COLLECTION TO IMPROVE READY-MIXED CONCRETE DELIVERY PERFORMANCE

  • Pan Hao;Sangwon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.187-194
    • /
    • 2011
  • Optimizing truck dispatching-intervals is imperative in ready mixed concrete (RMC) delivery process. Intervals shorter than optimal may induce queuing of idle trucks at a construction site, resulting in a long delivery cycle time. On the other hand, intervals longer than optimal can trigger work discontinuity due to a lack of available trucks where required. Therefore, the RMC delivery process should be systematically scheduled in order to minimize the occurrence of waiting trucks as well as guarantee work continuity. However, it is challenging to find optimal intervals, particularly in urban areas, due to variations in both traffic conditions and concrete placement rates at the site. Truck dispatching intervals are usually determined based on the concrete plant managers' intuitive judgments, without sufficient and reliable information regarding traffic and site conditions. Accordingly, the RMC delivery process often experiences inefficiency and/or work discontinuity. Automatic data collection (ADC) techniques (e.g., RFID or GPS) can be effective tools to assist plant managers in finding optimal dispatching intervals, thereby enhancing delivery performance. However, quantitative evidence of the extent of performance improvement has rarely been reported to data, and this is a central reason for a general reluctance within the industry to embrace these techniques, despite their potential benefits. To address this issue, this research reports on the development of a discrete event simulation model and its application to a large-scale building project in Abu Dhabi. The simulation results indicate that ADC techniques can reduce the truck idle time at site by 57% and also enhance the pouring continuity in the RMC delivery process.

  • PDF

A Development on Deep Learning-based Detecting Technology of Rebar Placement for Improving Building Supervision Efficiency (감리업무 효율성 향상을 위한 딥러닝 기반 철근배근 디텍팅 기술 개발)

  • Park, Jin-Hui;Kim, Tae-Hoon;Choo, Seung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.5
    • /
    • pp.93-103
    • /
    • 2020
  • The purpose of this study is to suggest a supervisory way to improve the efficiency of Building Supervision using Deep Learning, especially object detecting technology. Since the establishment of the Building Supervision system in Korea, it has been changed and improved many times systematically, but it is hard to find any improvement in terms of implementing methods. Therefore, the Supervision is until now the area where a lot of money, time and manpower are needed. This might give a room for superficial, formal and documentary supervision that could lead to faulty construction. This study suggests a way of Building Supervision which is more automatic and effective so that it can lead to save the time, effort and money. And the way is to detect the hoop-bars of a column and count the number of it automatically. For this study, we made a hoop-bar detecting network by transfor learnning of YOLOv2 network through MATLAB. Among many training experiments, relatively most accurate network was selected, and this network was able to detect rebar placement in building site pictures with the accuracy of 92.85% for similar images to those used in trainings, and 90% or more for new images at specific distance. It was also able to count the number of hoop-bars. The result showed the possibility of automatic Building Supervision and its efficiency improvement.

The survey on the patterns of school facilities usages for studying a space improvement plan of elementary school on narrow sites - Focused on elementary schools in Seoul - (부지 협소 초등학교의 공간 조성 방안 연구를 위한 학교 시설 이용 실태 조사 - 서울특별시 소재 초등학교를 중심으로 -)

  • Kim, Sae-Rom;Lee, Jae-Rim
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.18 no.1
    • /
    • pp.49-61
    • /
    • 2019
  • In this study, interviews are held with the faculties of two elementary schools on narrow sites located in Seoul to examine the existing problems of the elementary school on narrow site and the need for the new facilities of the elementary school on narrow site in order to derive the implications for the planning guidelines of such school construction. As a result of the survey, it was found that the substitutes of the playground installed in the elementary school on narrow site were not suitable for physical play activities, physical education class activities, and other curriculum operations. In order to secure an adequate physical activity an space for elementary schools, faculty members were demanding that the entire floor or rooftop of the school building be spatialized for physical activities. Additionally, problems such as noise generation and the lack of special rooms and public space were occurring in the elementary schools on narrow sites and are being deteriorated by accommodating an over number of students, and therefore policies are required to ensure that the appropriate number of students are maintained in the case of the schools on narrow sites.

A Study on the Restoration Plan of Beomeosa Temple in the Late Period of Chosun (구한말(舊韓末) 범어사(梵魚寺)의 복원도(復元圖) 작성(作成)에 관한 연구(硏究))

  • Youn, Suk-Hwan;Han, Sam-Geon
    • Journal of architectural history
    • /
    • v.14 no.4 s.44
    • /
    • pp.137-155
    • /
    • 2005
  • This study was started with its consideration as materials showing original shapes of temple buildings in the late period of Chosun the photographs and drawings which contained in $\ulcorner$A Survey Report of Korean Architecture$\lrcorner$ made by Sekino Tadashi through his survey for 62 days(July 5${sim}$Sep. 4, 1902). Results of the study can be summarized as follows. During the period of Japanese occupation, Beomesa temple experienced frequent changes in building layout including the transfer and removal of buildings. Such frequent change began in spring, 1936 when a Buddhist monk of Beomeosa temple, Cha Woon Ho moved Gwaneumjeon, originally located to the light of the main building, to the left of the building and, on its original site, built up a 7-storied sarira tower. Though it is difficult to say that the study provides everything about Beomeosa temple, the researcher expects that the study would be the very basis on which changes in the building layout of the temple since the late period of Chosun can be researched. In conclusion, the researcher hopes that the above mentioned restoration plan would help originally restore or enlarge temples, further transmitting such restored or enlarged establishments as valuable cultural remains from generation to generation. In this respect, the researcher expects such restoration plan to be made in continuous and more detailed ways.

  • PDF