Journal of the Korea Institute of Building Construction
/
v.15
no.6
/
pp.589-595
/
2015
This study evaluated the in-site compressive strength development of high-strength concrete developed for the mass structures under cold weather condition. Two mock-up wall specimens with $2.0{\times}1.2{\times}1.0m$ in dimension were cured under an average temperature of $5^{\circ}C$. Core strengths measured at different locations of the mock-up walls were compared with the companion standard cylinder strengths. Test results revealed that the core strength of mock-up walls at an age of 3 days is higher by approximately 30% than the companion cylinder strength because of the high curing temperature effect generated from the heat of hydration of cementitious materials. Furthermore, comparisons with the prediction models based on maturity function confirmed that the effect of hydration heat on the curing temperature increase needs to be reflected to reasonably evaluate the on-site compressive strength development of concrete for mass elements.
Journal of the Korea Institute of Building Construction
/
v.21
no.1
/
pp.79-86
/
2021
On the construction site, there exists frequently a high likelihood that a fire accident can lead to a large-scale disaster. In the previous studies, the diverse outcomes have been focused on the improvement of relative statutes and tried to realize the suppression and confrontation of the fire accidents. In this study, the limitations on the site were identified through prior research reviews, and the fire risk assessment checklist was proposed through the analysis of the massive accident cases. The checklist was divided into the prevention and minimization steps and developed into 16 categories of total risk factors. According to the results from the cases applied in this study, if the installation status is checked, such as removing combustibles, and broadcasting facilities for evacuation are installed, it is expected that the casualties will be minimized or zeroed. By developing a fire risk assessment checklist, this study provides the implications of the theoretical and realistic fire accident prevention, and supports the ways to minimize the damage resulted from the fire accidents on construction sites. In the further, deriving universe and common items about repeated occurrences of a work type will be needed as a subsequent research.
Journal of the Korea Institute of Building Construction
/
v.23
no.5
/
pp.595-605
/
2023
With the escalating prevalence of modular construction projects, there is a concurrent surge in scholarly and industrial intrigue in this domain, leading to a broadened spectrum of its applications. Modular construction, inherently facilitated by controlled factory settings, boasts the capability to consistently deliver edifices of superior quality. To optimize this advantage, the judicious integration of quality assurance methodologies during the site-specific phases of lifting and assembly is non-negotiable. This research embarked on a survey directed at project stakeholders, aiming to gauge the perceived significance and efficaciousness of prevailing quality preservation and oversight protocols during the aforementioned site stages, subsequently employing the Importance-Performance Analysis(IPA) for data interpretation. The findings elucidated that, while a majority of quality assurance procedures were adeptly executed, perceptual disparities existed among stakeholders regarding certain aspects, prompting recommendations for enhancement. This investigative endeavor lays a foundation, aiding future studies in amplifying the quality assurance cognizance among professionals during modular construction's site-assembly phase.
Journal of the Korean Institute of Educational Facilities
/
v.18
no.3
/
pp.13-21
/
2011
Yanji city in China is a city most populated with Korean-chinese. This study is to examine architectural planning characteristics for Korean-chinese Elementary schools in Yanji city. Currently, this city includes nine Korean-chinese schools. This research has been processed with regards to three broad aspects. Firstly changing processes of school systems, secondly local distributions and networks of school facilities, and thirdly site plans, floor plans and elevations of school buildings were analyzed and examined for finding their characteristics. For this study, seven Han-chinese Elementary schools were also analyzed. The study result are as following: 1. Korean-chinese schools have followed national education policies and also maintained Korean-chinese native education methods. The schools have undergone merger and separation with Han-chinese Elementary schools. Three Korean-chinese Elementary schools in Japan Colonials, two schools in the period of the Republic of China foundation and its growing, and four schools in 1980s were founded. 2. Yanji city administers the networks of Korean-chinese school districts and Han-chinese districts separately. All school districts apply to lkm standard as attending distance. The networks are adjusted as per population change. 3. The characteristics of buildings' site plans, floor plans and elevations are simple. Layouts of the schools are - type or -type centered playground. Building plans show one side corridor type and 5 stories mostly. Elevations stress central parts. Various forms such as finger types do not appear in mass planning since the school curriculum and extracurricular activities are not seemingly active. Han-chinese Elementary schools have similar conditions.
Ha, Seung-Yong;Kim, Sun-Kuk;Son, Seung-Hyun;Ha, Sun-Geun;Son, Ki-Young
Journal of the Korea Institute of Building Construction
/
v.17
no.6
/
pp.567-576
/
2017
The purpose of this study is to analyze safety perception level of workers in construction site according to NOSACQ-50. To achieve the objective of this study, First, literature review is conducted to clearly define the concept of safety climate. Second, NOSACQ-50 is used to survey the level of safety climate of workers. Third, statistical analysis based on collected data is conducted to examine the level of safety climate. As a result, the level of safety climate in South Korea was found to be serious comparing with the standard value proposed in NOSACQ-50. Finally, the improvements were suggested after investigating the key factors on the level of safety climate. In the future, this study will be used as a baseline for developing safety awareness assessment tools such as NOSACQ-50 for domestic construction sites.
In this study, tests were conducted to establish a fire engine of relay waterproof and utilization in order to maintain the pressure in a situation that require high-pressure water-resistant such as a high-rise building fire, etc. As a result of test on the change of a relay waterproof pressure, the measurement result with the hydrant intake of a fire engine opened has reduced approximately 20 % compared to the measurement result with the hydrant intake closed. Similar efficiency showed in the test result that change the pressure of 2 fire engines respectively to use them more efficiently at a fire fighting activity site. A fire engine operation and utilization is proposed based on this study result in order to cope effectively with a fire site requiring high-pressure stream in a high-rise building fire, etc. by using a fire engine held at present because there is no fire pump with high-pressure stream ability arranged at the fire station and there is no regulation on high-pressure fire-fighting pumps in a type approval and verification technology criterion for a fire engine.
International conference on construction engineering and project management
/
2011.02a
/
pp.187-194
/
2011
Optimizing truck dispatching-intervals is imperative in ready mixed concrete (RMC) delivery process. Intervals shorter than optimal may induce queuing of idle trucks at a construction site, resulting in a long delivery cycle time. On the other hand, intervals longer than optimal can trigger work discontinuity due to a lack of available trucks where required. Therefore, the RMC delivery process should be systematically scheduled in order to minimize the occurrence of waiting trucks as well as guarantee work continuity. However, it is challenging to find optimal intervals, particularly in urban areas, due to variations in both traffic conditions and concrete placement rates at the site. Truck dispatching intervals are usually determined based on the concrete plant managers' intuitive judgments, without sufficient and reliable information regarding traffic and site conditions. Accordingly, the RMC delivery process often experiences inefficiency and/or work discontinuity. Automatic data collection (ADC) techniques (e.g., RFID or GPS) can be effective tools to assist plant managers in finding optimal dispatching intervals, thereby enhancing delivery performance. However, quantitative evidence of the extent of performance improvement has rarely been reported to data, and this is a central reason for a general reluctance within the industry to embrace these techniques, despite their potential benefits. To address this issue, this research reports on the development of a discrete event simulation model and its application to a large-scale building project in Abu Dhabi. The simulation results indicate that ADC techniques can reduce the truck idle time at site by 57% and also enhance the pouring continuity in the RMC delivery process.
Journal of the Architectural Institute of Korea Planning & Design
/
v.36
no.5
/
pp.93-103
/
2020
The purpose of this study is to suggest a supervisory way to improve the efficiency of Building Supervision using Deep Learning, especially object detecting technology. Since the establishment of the Building Supervision system in Korea, it has been changed and improved many times systematically, but it is hard to find any improvement in terms of implementing methods. Therefore, the Supervision is until now the area where a lot of money, time and manpower are needed. This might give a room for superficial, formal and documentary supervision that could lead to faulty construction. This study suggests a way of Building Supervision which is more automatic and effective so that it can lead to save the time, effort and money. And the way is to detect the hoop-bars of a column and count the number of it automatically. For this study, we made a hoop-bar detecting network by transfor learnning of YOLOv2 network through MATLAB. Among many training experiments, relatively most accurate network was selected, and this network was able to detect rebar placement in building site pictures with the accuracy of 92.85% for similar images to those used in trainings, and 90% or more for new images at specific distance. It was also able to count the number of hoop-bars. The result showed the possibility of automatic Building Supervision and its efficiency improvement.
The Journal of Sustainable Design and Educational Environment Research
/
v.18
no.1
/
pp.49-61
/
2019
In this study, interviews are held with the faculties of two elementary schools on narrow sites located in Seoul to examine the existing problems of the elementary school on narrow site and the need for the new facilities of the elementary school on narrow site in order to derive the implications for the planning guidelines of such school construction. As a result of the survey, it was found that the substitutes of the playground installed in the elementary school on narrow site were not suitable for physical play activities, physical education class activities, and other curriculum operations. In order to secure an adequate physical activity an space for elementary schools, faculty members were demanding that the entire floor or rooftop of the school building be spatialized for physical activities. Additionally, problems such as noise generation and the lack of special rooms and public space were occurring in the elementary schools on narrow sites and are being deteriorated by accommodating an over number of students, and therefore policies are required to ensure that the appropriate number of students are maintained in the case of the schools on narrow sites.
This study was started with its consideration as materials showing original shapes of temple buildings in the late period of Chosun the photographs and drawings which contained in $\ulcorner$A Survey Report of Korean Architecture$\lrcorner$ made by Sekino Tadashi through his survey for 62 days(July 5${sim}$Sep. 4, 1902). Results of the study can be summarized as follows. During the period of Japanese occupation, Beomesa temple experienced frequent changes in building layout including the transfer and removal of buildings. Such frequent change began in spring, 1936 when a Buddhist monk of Beomeosa temple, Cha Woon Ho moved Gwaneumjeon, originally located to the light of the main building, to the left of the building and, on its original site, built up a 7-storied sarira tower. Though it is difficult to say that the study provides everything about Beomeosa temple, the researcher expects that the study would be the very basis on which changes in the building layout of the temple since the late period of Chosun can be researched. In conclusion, the researcher hopes that the above mentioned restoration plan would help originally restore or enlarge temples, further transmitting such restored or enlarged establishments as valuable cultural remains from generation to generation. In this respect, the researcher expects such restoration plan to be made in continuous and more detailed ways.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.