• 제목/요약/키워드: Scheduling System

검색결과 2,164건 처리시간 0.032초

n/m Flow Shop Scheduling에 있어서 최적 Scheduling에 관한 연구 - 평가척도를 중심으로 - (A Study on the Optimal Scheduling in n/m Flow Shop Scheduling : the Measure of Performance)

  • 이근희;김준홍
    • 산업경영시스템학회지
    • /
    • 제4권4호
    • /
    • pp.1-13
    • /
    • 1981
  • This paper analyses the efficiency of performance measures from the point of total cost on the accuracy of due date around various measures of performance be in mainly use in the flow shop scheduling theory. For this purpose, complete enumeration method for small problems seems to be the only possible means of evaluation and analysis. Using of the above technique, calculates the 800 Scheduling Problems, and represents it by the cumulative distributions.

  • PDF

Evaluation Of The Content-Based Packet Scheduling Policies On The Multithreaded Multiprocessor Network System

  • Yim Kangbin
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2004년도 ICEIC The International Conference on Electronics Informations and Communications
    • /
    • pp.39-41
    • /
    • 2004
  • In this paper, I propose a thread scheduling policy for faster packet processing on the network processors with multithreaded multiprocessor architecture. To implement the proposed policy, I derived several basic parameters related to the thread scheduling and included a new parameter representing the packet contents and the features of the multithreaded architecture. Through the empirical study using a network processor, I proved the proposed scheduling ploicy provides better throughput and load balancing compared to the generally used thread scheduling policy.

  • PDF

반도체 자동화 생산을 위한 실시간 일정계획 시스템 재 구축에 관한 연구 : 300mm 반도체 제조라인 적용 사례 (Real-Time Scheduling System Re-Construction for Automated Manufacturing in a Korean 300mm Wafer Fab)

  • 최성우;이정승
    • 지능정보연구
    • /
    • 제15권4호
    • /
    • pp.213-224
    • /
    • 2009
  • 본 연구는 국내 300mm 웨이퍼를 이용하여 반도체 제품의 제조라인을 대상으로 수행 되었던 자동화 생산을 위한 일정계획 시스템 재 구축 프로젝트에 관한 내용이다. 본 프로젝트의 주요 목적은 반도체 제조라인 내의 세정, 확산, 포토, 증착과 같은 주요공정들을 대상으로 효율적인 일정계획 수립 알고리듬을 개발하고 그것을 실시간 일정계획 시스템에 구현함으로써 반도체 제조라인의 자동화 생산률을 향상시키는 것이다. 본 논문에서는 여러가지 주요 공정들 중 제한된 대기시간 제약과 배치공정의 특성이 존재하는 세정과 확산으로 이루어진 연속공정 구간을 대상으로 개발된 일정계획 알고리듬과 실시간 일정계획 시스템의 개발에 대한 내용에 초점을 두었다. 일정계획 시스템 재 구축 프로젝트가 시작 될 시점에 세정과 확산 공정의 자동화 생산률은 각각 50%와 10% 정도 였으나, 프로젝트 수행 완료 후에는 각각 91%와 83% 까지 자동화 생산률이 향상 되었다. 자동화 생산률의 향상은 작업자의 인건비 절감, 생산성의 향상, 지속적이고 편차 없는 생산을 의미한다.

  • PDF

An On-line Algorithm to Search Minimum Total Error for Imprecise Real-time Tasks with 0/1 Constraint

  • Song Gi-Hyeon
    • 한국멀티미디어학회논문지
    • /
    • 제8권12호
    • /
    • pp.1589-1596
    • /
    • 2005
  • The imprecise real-time system provides flexibility in scheduling time-critical tasks. Most scheduling problems of satisfying both 0/1 constraint and timing constraints, while the total error is minimized, are NP complete when the optional tasks have arbitrary processing times. Liu suggested a reasonable strategy of scheduling tasks with the 0/1 constraint on uniprocessors for minimizing the total error. Song et al suggested a reasonable strategy of scheduling tasks with the 0/1 constraint on multiprocessors for minimizing the total error. But, these algorithms are all off-line algorithms. On the other hand, in the case of on line scheduling, Shih and Liu proposed the NORA algorithm which can find a schedule with the minimum total error for a task system consisting solely of on-line tasks that are ready upon arrival. But, for the task system with 0/1 constraint, it has not been known whether the NORA algorithm can be optimal or not in the sense that it guarantees all mandatory tasks are completed by their deadlines and the total error is minimized. So, this paper suggests an optimal algorithm to search minimum total error for the imprecise on-line real-time task system with 0/1 constraint. Furthermore, the proposed algorithm has the same complexity, O(N log N), as the NORA algorithm, where N is the number of tasks.

  • PDF

수주생산환경에서 생산일정계획 알고리듬 설계 및 정보 시스템 구현: 변압기 제조공정의 권선공정 적용사례 (An Algorithm Design and Information System Development for Production Scheduling under Make-to-Order Environments)

  • 박창권;장길상;이동현
    • 산업공학
    • /
    • 제16권2호
    • /
    • pp.185-194
    • /
    • 2003
  • This paper deals with a realistic production scheduling under a make-to-order production environment. The practical case is studied on the transformer winding process in the 'H' company. The transformer winding is a process that rolls a coil that is coated with an electric insulation material in order to generate the required voltage using the voltage fluctuation. This process occupies an important position among the production processes in the transformer manufacturing company. And this process is composed of parallel machines with different performances according to the voltage capacity and winding type. In this paper, we propose a practical heuristic algorithm for production scheduling to satisfy the customer’s due date under a make-to-order production environment. Also, we implement the production scheduling system based on the proposed heuristic algorithm. Consequently, the proposed heuristic algorithm and the implemented production scheduling system are currently working in the transformer production factory of the ‘H’ company.

트랜스포터의 공주행(空走行) 최소화를 고려한 블록 운반 계획 최적화 (Optimal Block Transportation Scheduling Considering the Minimization of the Travel Distance without Overload of a Transporter)

  • 임선빈;노명일;차주환;이규열
    • 대한조선학회논문집
    • /
    • 제45권6호
    • /
    • pp.646-655
    • /
    • 2008
  • A main issue about production management of shipyards is to efficiently manage the work in process and logistics. However, so far the management of a transporter for moving building blocks has not been efficiently performed. To solve the issues, optimal block transporting scheduling system is developed for minimizing of the travel distance without overload of a transporter. To implement the developed system, a hybrid optimization algorithm for an optimal block transportation scheduling is proposed by combining the genetic algorithm and the ant algorithm. Finally, to evaluate the applicability of the developed system, it is applied to a block transportation scheduling problem of shipyards. The result shows that the developed system can generate the optimal block transportation scheduling of a transporter which minimizes the travel distance without overload of the transporter.

Long-Term Container Allocation via Optimized Task Scheduling Through Deep Learning (OTS-DL) And High-Level Security

  • Muthakshi S;Mahesh K
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제17권4호
    • /
    • pp.1258-1275
    • /
    • 2023
  • Cloud computing is a new technology that has adapted to the traditional way of service providing. Service providers are responsible for managing the allocation of resources. Selecting suitable containers and bandwidth for job scheduling has been a challenging task for the service providers. There are several existing systems that have introduced many algorithms for resource allocation. To overcome these challenges, the proposed system introduces an Optimized Task Scheduling Algorithm with Deep Learning (OTS-DL). When a job is assigned to a Cloud Service Provider (CSP), the containers are allocated automatically. The article segregates the containers as' Long-Term Container (LTC)' and 'Short-Term Container (STC)' for resource allocation. The system leverages an 'Optimized Task Scheduling Algorithm' to maximize the resource utilisation that initially inquires for micro-task and macro-task dependencies. The bottleneck task is chosen and acted upon accordingly. Further, the system initializes a 'Deep Learning' (DL) for implementing all the progressive steps of job scheduling in the cloud. Further, to overcome container attacks and errors, the system formulates a Container Convergence (Fault Tolerance) theory with high-level security. The results demonstrate that the used optimization algorithm is more effective for implementing a complete resource allocation and solving the large-scale optimization problem of resource allocation and security issues.

간호인력 배치 시스템 (A Nurse Scheduling Support System)

  • 최용선;박정호;박현애;조현;한혜라
    • 간호행정학회지
    • /
    • 제2권2호
    • /
    • pp.73-83
    • /
    • 1996
  • Scheduling for nursing personnel involves many factors and requirements. Therefore, manual scheduling requires much time and effort to produce an adequate schedule. This paper introduces a PC based nurse scheduling support system which was developed in Microsoft Access 2.0, an easy to use data base management tool. First step of this system is to determine necessary number of nursing personnel by medical law or by patient classification. Current Korean medical law stipulates that number of patients attended by a nurse is 2.5 for hospitalization. In addition, necessary nursing personnel by patient classification was determined four nurses for seven patients in this system based on the authors' preliminary study. And the second step is to assign daily duty type for each nurse at every nursing unit automatically. The introduced system fully utilizes the GUI environment of Microsoft Windows and even makes the computer-novice nurses feel comfortable in using the system. This system can help nursing administrators improve nurse scheduling in a way of quick and easy schedule generation for the future, and allow nurses more time for patient care.

  • PDF

노드 기반 스케줄링 방법을 이용한 FlexRay 네트워크 시스템의 구현 (Implementation of FlexRay Network System using Node-based Scheduling Method)

  • 김만호;하경남;이석;이경창
    • 한국자동차공학회논문집
    • /
    • 제18권2호
    • /
    • pp.39-47
    • /
    • 2010
  • As vehicles become intelligent for convenience and safety of drivers, in-vehicle networking (IVN) systems are essential components of intelligent vehicles. Recently, the chassis networking system which require increased network capacity and real-time capability is being developed to expand the application area of IVN systems. Also, FlexRay has been developed for the chassis networking system. However, FlexRay needs a complex scheduling method of static segment, which is a barrier for implementing the chassis networking system. Especially, if we want to migrate from CAN network to FlexRay network using CAN message database that was well constructed for the chassis networking system by automotive vendors, a novel scheduling method is necessary to be able to reduce design complexity. This paper presents a node-based scheduling method for FlexRay network system. And, in order to demonstrate the method's feasibility, its performance is evaluated through an experimental testbed.

전문가 스케쥴링 프로그램의 개발에 관한 연구 (A Study on the Development of Expert Scheduling Program)

  • 신용진;박노국;송문익
    • 산업경영시스템학회지
    • /
    • 제15권26호
    • /
    • pp.21-31
    • /
    • 1992
  • Today, manpower is used as a major factor in the production of service industry that is on the increasing trend. So the research on manpower structure have been regarded as a important field. The research on personnel scheduling, however, have got de-emphasizeed as compared wi th the field of manufacturing scheduling. As the increasing trend of service industry, an appropriate personnel scheduling for each type of service industry is needed urgently. This paper deals with nurse scheduling problem in the field of personnel scheduling. We aim at developing prototype of the expert nurse scheduling program which is easy to use when scheduling without help of expert, and satisfies the various request of hospital scheduling policy and nurse scheduling.

  • PDF