• Title/Summary/Keyword: Schedule-based

Search Result 1,298, Processing Time 0.031 seconds

A Discount Price Schedule Based on Supplier's Profit Function

  • Kim, Kap-Hwan
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.1
    • /
    • pp.113-126
    • /
    • 1992
  • It is discussed how a supplier should design a quantity discount pricing schedule for multiple buyers. It is emphasized that nor only the supplier's surplus but also each buyer's surplus resultant from quantity discount should be considered in designing price schedule. It is shown that if the supplier's quantity pricing schedule is based on his/her profit function, each buyer's surplus may be maximized. And it is also shown that when the supplier's main benefit comes from the reduced number of setups, the incremental discount schedule satisfies the requirement. Formulas to determine values of parameters of the incremental discount schedule are provided.

  • PDF

A Case Study on Reason Analysis for Schedule Delay of Apartment House (공동주택의 공기지연 원인분석 사레 연구)

  • Park, Chang-Wook;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.89-94
    • /
    • 2009
  • A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site.

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

A Study constructing a Function-Based Records Classification System for Korean Individual Church (한국 개(個)교회기록물의 기능분류 방안)

  • Ma, Won-jun
    • The Korean Journal of Archival Studies
    • /
    • no.10
    • /
    • pp.145-194
    • /
    • 2004
  • Church archives are the evidential instruments to remember church activity and important information aggregate which has administrative, legal, financial, historical, faithful value as the collective memory of church community. So it must be managed necessarily and the management orders are based on the Bible. The western churches which have a correct understanding about the importance of church records and management order have taken multilateral endeavor to create, manage church archives systematically. On the other hand, korean churches don't have the records management systems. Therefore, Records created in individual church are mostly managed unsystematically and exist as 'backlogs', finally, they are destructed without reasonable formalities. In those problems, the purpose of this study is to offer the way of records classification and disposition instrument with recognition that records management should be done from the time of creation or previous to it. As a concrete device for them, I tried to embody the function-based classification method and disposal schedule. I prefer the function-based classification and disposal schedule to the organization and function-based classification to present stable classification and disposal schedule, as we can say the best feature of the modern organization is multilateral and also churches have same aspect. For this study, I applied DIRKS(Designing and Implementing Recordkeeping Systems) manual which National Archives of Australia provide and guidelines in ICA/IRMT series to construct the theory of the function-based classification in individual churches. Through them, it was possible to present a model for preliminary investigation, analysis of business activity, records survey, disposal schedule. And I took an example of 'Myong Sung Presbyterian Church' which belong to 'The Presbyterian church in Korea'. I explained in detail codifying process and results of preliminary investigation in 'Myong Sung Presbyterian Church', analysis of business activity based on it, process of presenting the function-based classification and disposal schedule got from all those steps. For establishing disposal schedule, I planned 'General Disposal Schedule' and 'Agency Disposal Schedule' which categorized 'general function' and 'agency function' of an agency, according to DIRKS in Australia and ICA/IRMT. And for estimation of disposal date I had a thorough grasp of important records category presented in 'Constitution of General Assembly', interview to know the importance of tasks, and added examples of disposal schedule in western church archives. This study has significance that it was intended to embody 'the function-based classification' and 'disposal schedule' suitable for individual church, applying DIRKS in Australia and ICA/IRMT on absence of the theory or example which tried to present the function-based classification and disposal schedule for individual church. Also it is meaningful to present a model that can classify and disposal real records according to the function in individual church which has no recognition or way about records management.

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

The Decoding Approaches of Genetic Algorithm for Job Shop Scheduling Problem (Job Shop 일정계획 문제 풀이를 위한 유전 알고리즘의 복호화 방법)

  • Kim, Jun Woo
    • The Journal of Information Systems
    • /
    • v.25 no.4
    • /
    • pp.105-119
    • /
    • 2016
  • Purpose The conventional solution methods for production scheduling problems typically focus on the active schedules, which result in short makespans. However, the active schedules are more difficult to generate than the semi active schedules. In other words, semi active schedule based search strategy may help to reduce the computational costs associated with production scheduling. In this context, this paper aims to compare the performances of active schedule based and semi active schedule based search methods for production scheduling problems. Design/methodology/approach Two decoding approaches, active schedule decoding and semi active schedule decoding, are introduced in this paper, and they are used to implement genetic algorithms for classical job shop scheduling problem. The permutation representation is adopted by the genetic algorithms, and the decoding approaches are used to obtain a feasible schedule from a sequence of given operations. Findings The semi active schedule based genetic algorithm requires slightly more iterations in order to find the optimal schedule, while its execution time is quite shorter than active schedule based genetic algorithm. Moreover, the operations of semi active schedule decoding is easy to understand and implement. Consequently, this paper concludes that semi active schedule based search methods also can be useful if effective search strategies are given.

Comparison of Relative Value on Physician Payment Schedule for reimbursement of health insurance between Korea and U.S.A. (한국과 미국의 기술료에 대한 상대가치 비교)

  • 김한중;조우현;손명세;박은철
    • Health Policy and Management
    • /
    • v.2 no.1
    • /
    • pp.1-16
    • /
    • 1992
  • This study compares the physician payment of national fee schedule for Korean Medical Insurance with that of the United States based on Resource Based Relative Value Scales (RBRVS) which Hsiao developed in 1988 for the Medicare reimbursement. Through the comparison of two fees schedules, this study is purposed to evaluate the appropriateness of relative values which assigned to each physician services of Korean fee schedule. A total of 264 physician services are selected for the comparison. The ratio of Korean schedule to RBRVS is selected as an index of appropriateness. It the score of index shows large variation among services, the relative value of Korean fee schedule is inappropriate with U.S. RBRVS which was developed recently. The Ratios of Korean schedule to RBRVS are widly variated ; the range of those is 8.1 to 379.3. In subgroups which are regrouped to controll systematic differences between two national fee schedules, these ratios are also variated. Services which are relatively less compensated are management/evaluation services, while services which are relatively more compensated are invasive and imaging services. By the way, the service classification of Korean fee schedule is unclear, specially in management/evalutaion services. Therefore, Korean Medical Insurance fee schedule should be modified to be more balanced and rational.

  • PDF

Development of a Two-Phase Heuristic Method for the Enhancement of a Production Schedule (생산일정계획 성능향상을 위한 2단계 휴리스틱 방법의 개발)

  • Hong, Yun-Ho;Kim, Sheung-Kown;Kim, Sun-Uk;Lee, Jun-Youl
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.3
    • /
    • pp.65-77
    • /
    • 1994
  • There are so many situations in which production schedules need to be rescheduled, due to the uncertainty or dynamic characteristics existing in manufacturing environment. Under the circumstances, it is necessary to build a system which helps a schedule manager understand the dynamic situations and reflect his insight into the system easily. We developed a system that can improve a production schedule. The system consists of a schedule editor and a schedule generator. The schedule editor, a rule-based system, always keeps a schedule feasible by keeping track of local changes in the revised one. The schedule generator consists of a two-phase heuristic method. In the lst phase it generates a schedule by a priority rule with Giffler and Thompson algorithm then it improves the performance in terms of the makespan in the 2nd phase. Experimental results show that, most of the times, the system generates a better schedule than the one with ordinary priority rules only.

  • PDF