• Title/Summary/Keyword: Schedule table

Search Result 54, Processing Time 0.024 seconds

Estimation of Software Development Efforts and Schedule Based on A Ballpark Schedule Estimation Table (개략적 일정추정표 기반 소프트웨어 개발노력과 일정 추정)

  • Park, Young-Mok
    • Journal of Internet Computing and Services
    • /
    • v.8 no.4
    • /
    • pp.105-117
    • /
    • 2007
  • In order to succeed in a bid or development, the project manager should estimate its cost and schedule more accurately in the early stage of the project. Usually, the nominal schedule of most projects can be derived from rule of thumb, first-order estimation practice, or ball-park schedule estimation table. But the rule-of-thumb models for the nominal schedule estimation are so various, and the first-order estimation practice does not provide sufficient information. So they do not help much to decide on the proper development effort and schedule for a particular size of project. This paper presents a statistical regression model for deciding the development effort and schedule of a project using the ball-park schedule estimation table. First, we have redefined such words suggested in the ballpark schedule estimation table as shortest possible schedule, efficient schedule and nominal schedule, Next, we have investigated the relationship between the development effort and the schedule. Finally, we have suggested a model for estimating the development effort and the more accurate schedule of such particular sizes of software as are not presented in the ball-park schedule estimation table. The experimental results show that our proposed regression analysis model decreases the mean magnitude of relative error by 2% at maximum. Also this model can estimated the development effort and schedule for a particular size of software.

  • PDF

A Study on Quality Improvement of Exporting Wood Products I. Kiln Drying Schedules for Oak, Ramin and Meranti (수출용(輸出用) 목재가공품(木材加工品)의 품질개선(品質改善)에 관(關)한 연구(硏究) I. 참나무, 라민 및 나왕의 인공건조(人工乾燥) 스케줄)

  • Chung, Byung-Jae
    • Journal of the Korean Wood Science and Technology
    • /
    • v.2 no.1
    • /
    • pp.3-18
    • /
    • 1974
  • The exports of plywood are increasing annually and it has ranked first in the world market because of the high quality product and manufactured using mordern techniques. However, it is known that the exports of the other wood products, except plywood, is inactive because of their low quality. Accordingly, to increase the exports of various wood products investigations were carried out on kiln drying techniques to improve the quality of the wood. Wet wood should be kiln dried before use to prevent various drying defects such as distortion, shrinkage etc., which would develop after processing,:and also wet wood is not suitable for cutting, gluing and finishing. Therefore, the kiln drying properties of lumber from such species as oak, ramin and meranti which are used in large quantity for manufacturing exporting wood products have been studied. The results of the research are summarized as follows. (1) The end checks and the time for drying from initial moisture content of about 40 percent to 5 percent moisture content in ovendry were investigated as follows: (2) The kiln dried results, for 30mm stock, which are presented by using kiln schedule table 3 are as follows: (3) The kiln schedules for ramin, meranti and oak are given respectively as follows: Ramin kiln schedule: Table 17 and Table 18. Meranti schedule : Table 12. Oak schedule : Table 15.

  • PDF

A study on Development of method for Train Schedule Simulation (철도 차량운행계획 시뮬레이션 방법론 개발에 대한 연구)

  • Shin, Dae-Sup;Park, Eun-Kyung;Lee, Jin-Sun;Lee, Seon-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.88-95
    • /
    • 2012
  • Presently, because making process of train service plan consist of various constraint condition, for example structure of track, structure of track in station, train maintenance time and others for considering to be necessary of train management, it has been had extremely complex structure problems. For these reasons, it has big problems to compare analysis for various train service time-table. A study suggest methodology to choice service the most effective schedule and plan of train put before comparative analysis on making train diamond picture's expected effect of established possible various train time-table in making process of train service schedule for improving effectiveness and organization of train service schedule establishment. A study uses Line-Blocking theory for analyzing train service time-table and analyze example for regional train Sadang to Ansan section in 4line.

New OTP Authentication Approach based on Table Pattern Schedule (테이블 패턴 스케줄 기반 OTP 인증)

  • Balilo, Benedicto B. Jr.;Gerardo, Bobby D.;Medina, Ruji P.;Byun, Yung-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.12
    • /
    • pp.1899-1904
    • /
    • 2017
  • This paper presents a new one-time password approach generated based on $4{\times}4$ pattern schedule. It demonstrates generation of passkey from initial seed of random codes and mapping out in table pattern schedule which will produce a new form of OTP scheme in protecting information or data. The OTP-2FA has been recognized by many organizations as a landmark to authentication techniques. OTP is the solution to the shortcomings of the traditional user name/password authentication. With the application of OTP, some have benefited already while others have had second thoughts because of some considerations like cryptographic issue. This paper presents a new method of algorithmic approach based on table schedule (grid authentication). The generation of OTP will be based on the random parameters that will be mapped out in rows and columns allowing the user to form the XY values to get the appropriate values. The algorithm will capture the values and extract the predefined characters that produce the OTP codes. This scheme can work in any information verification system to enhance the security, trust and confidence of the user.

Recent Change in the Fertility Pattern in Korea

  • Rhee, Hong-Joon
    • Journal of the Korean Statistical Society
    • /
    • v.5 no.2
    • /
    • pp.119-127
    • /
    • 1976
  • By examining Table 1, it is confirmed that the two model fertility scheduels for 1960 and 1975 are close agreement with the census data in Korea. The declines of age-specific fertility are more remarkable among older women than among younger, as exhibited in Table 3 and Fig. 2. A merit of this fitted model schedule as compared to fitted conventional frequency distributions such as the Pearson Type III curve, is that the model schedule incorporates combinations of intuitively understandable demographic factors. The value of m, a measure of fertility control, increased remarkably from 0.531 in 1960 to 2.429 in 1975. Considering the fact that the average value of m for forty-three schedules shown in the 1965 Demographic Yearbook was 1.0, and the value of m in England and Wales for 1965 was 1.91, the recent level of fertility control in Korea may be considered higher than generally believed.

  • PDF

A Study on Quality Improvement of Exporting Wood Products (수출용 목재 가공품의 품질개선에 관한 연구)

  • Chung, Byung-Jae;Lee, Eun-Chol;Oh, Kwang-In;Kim, Jong-Yeung
    • Journal of the Korean Wood Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.22-24
    • /
    • 1974
  • 1. Object and importance of the research. The exports of plywood are increasing annually and it has ranked first in the world market because of the high quality product developed and manufactured using modern techniques. However, it is known that the exports of the other wood products, except plywood, is inactive because of their low quality. Accordingly, to increase the exports of various wood products investigations were carried out on kiln drying techniques to improve the quality of the wood. 2. The details and scope of the research Wet wood should be kiln dried before use to prevent various drying defects such as distortion, shrinkage etc, which would develop after processing, and also wet wood is not suitable for cutting, gluing and finishing. Therefore, the kiln drying properties of lumber from such species as Persimmon, Oak, Ramin and Meranti which are used in large quantity for manufacturing exporting wood products have been studied. Also the real state of kiln drying industry in Korea was investigated. 3. Results and proposal for practical use of the research 3. 1 Results of the research 3.1.1 The end checks and the time for drying from intial moisture content of about 40 percent to 5 percent moisture content in ovendry were investigated as Table 1. 3.1.2 The kiln dried results, for 30mm stock, which are presented by using kiln schedule Table 2 are as Table 3. 3.1.3 The kiln schedule for Persimmon which has a normal drying properties is given in Table 4. However, the persimmon which has easy checking properties should be air dried under a relative humidity of above 85% until reaching about 25 percent moisture content. 3.1.4 The kiln schedules for ramin, meranti and oak are given respectively as follows. Ramin kiln schedule ............ Table 5 and Table 6 Meranti kiln schedule ............ Table 7 Oak kiln schedule ............ Table 8 3.2 Proposal for practical use of the research Firms using the above species should be informed the results of the research so they can be used to preventing drying defects and shortening drying time.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

Improved Pre-prepared Power Demand Table and Muller's Method to Solve the Profit Based Unit Commitment Problem

  • Chandram, K.;Subrahmanyam, N.;Sydulu, M.
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.2
    • /
    • pp.159-167
    • /
    • 2009
  • This paper presents the Improved Pre-prepared Power Demand (IPPD) table and Muller's method as a means of solving the Profit Based Unit Commitment (PBUC) problem. In a deregulated environment, generation companies (GENCOs) schedule their generators to maximize profits rather than to satisfy power demand. The PBUC problem is solved by the proposed approach in two stages. Initially, information concerning committed units is obtained by the IPPD table and then the subprob-lem of Economic Dispatch (ED) is solved using Muller's method. The proposed approach has been tested on a power system with 3 and 10 generating units. Simulation results of the proposed approach have been compared with existing methods and also with traditional unit commitment. It is observed from the simulation results that the proposed algorithm provides maximum profit with less computational time compared to existing methods.

SCHEDULING TECHNIQUE FOR CONTROL STEP (스케듈링 기법 연구)

  • JeongYoungSong;NamWooBack
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.3
    • /
    • pp.163-173
    • /
    • 2001
  • This paper deals with scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informaion trom the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth - order elliptic wave filter of a standard benchmark moedl, and then it is drawing up T.N matrix table by the number resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource th use this table. All of existing list scheduling techniques determine the priority function first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Scheduling Technique for Control Step (제어구간에 의한 스케듈링 기법)

  • Song, Jeong-Young;Back, Nam-Woo
    • The Journal of Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.35-45
    • /
    • 2002
  • This paper deals with the scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informations from the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth – order elliptic wave filter of a standard benchmark model, and then it is drawing up T.N matrix table by the number of resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource to use this table. All of existing list scheduling techniques determine the priority functions first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF