• Title/Summary/Keyword: Schedule generator

Search Result 41, Processing Time 0.025 seconds

Knowledge-based System for Power Generator Annual Maintenance Scheduling (발전기 연간 정기보수계획을 위한 지식 베이스 시스템)

  • Ahn, Byong-Hun;Kim, Chul;Shin, Jae-Yeong;Lee, Kyung-Jae;Kwon, Tae-Won;Lee, Byung-Ha;Ham, Wan-Kyun
    • Proceedings of the KIEE Conference
    • /
    • 1991.11a
    • /
    • pp.47-50
    • /
    • 1991
  • This paper discusses a knowledge-based system being developed by KAIST and KEPCO to assist planning the annual maintenance schedule of power units. To meet users' requirements, we have designed the system with several features: man-machine interaction, catalog system, user-friendliness, the hybrid-system of math-model and knowledge-base. In this paper, we introduce the outline of our system.

  • PDF

Development of Time-Expanded Network using Hold-over Arcs (지체호를 사용하는 시간 전개형 네트워크의 개발)

  • Lee, Dal-Sang;Kim, Man-Sik;Lee, Young-Hae
    • IE interfaces
    • /
    • v.4 no.2
    • /
    • pp.25-34
    • /
    • 1991
  • The problem of scheduling the passage things with low transit priority to maximize the amonnt that can be sent during given time periods without interfering with the fixed schedule for passage things with high transit priority in a track, is treated in this paper. The problem is transformed into the Time Expanded Network without traverse time through the Ford and Fulkerson Model and the Enumeration Algorithm is developed for solutions using TENET GENerator(TENETGEN). Finally, the proposed algorithm is compared with Dinic's maximal-flow algorithm and examined for the availability of the procedures on the personal computer.

  • PDF

A New Algorithm for Unit Commitment (기동정지계획의 새로운 해법)

  • Lee, Sang-Do;Baek, Young-Sik
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.704-706
    • /
    • 1996
  • This paper presents a new algorithm of unit commitment for optimal operation in power system. The proposed method developed algorithm that determined generators considering load variations at each stages. It has established forecast unit commitment over time horizon at first and next calculated quality cost of generators and then committed generator that has minimum quality cost at unit commitment schedule over time horizon. It is used that Objet-Oriented Programming for effective realization, and simple handling of complex program. The proposed method has applied at example system and the results has shown superior economics and computational requirement than the conventional method.

  • PDF

The Development of Model to Calculate Maximum Power for Tidal Power Plant Operation (조력발전 운영을 위한 최대 발전량 산정 모델개발)

  • Oh, Min-Hwan;Kim, Hual-Soo;Kim, Jae-Hoon;Song, Gyu-Seok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.505-508
    • /
    • 2006
  • Recently, concern for tidal power is being increased by newly recycled energy. It is important to decide on the maximum power estimate operation and it's stop by applying the difference of water level between tide level and artificial reservoir for the administration of tidal development. For maximum output of power through turbine generator, administrative variables and process on efficiency of hydraulic turbine and inflow discharge of reservoir is quite complicated because it is run through the connection of discharge-gate and turbine On the development of this model, the administrative process is decided, Operation block is presented for it's maximum power estimate.

  • PDF

Optimal Sampling Period of the Digital Control System for the Nuclear Power Plant Steam Generator Water Level Control (증기발생기 수위 제어를 위한 디지탈 제어기의 적정 샘플링 주기)

  • Hur, Woo-Sung;Seong, Poong-Hyun
    • Nuclear Engineering and Technology
    • /
    • v.27 no.1
    • /
    • pp.8-17
    • /
    • 1995
  • A great effort has been made to improve the nuclear plant control system by use of digital technologies, and a long term schedule for the control system upgrade has been prepared with an aim to implementation in the next generation nuclear plane. In case of digital control system, it is important to decide the sampling period for analysis and design of the system, because the performance and the stability of a digital control system depend on the value of the sampling period of the digital control system. There is, however, currently no systematic method used universally for determining the sampling period of the digital control system. Generally, a traditional way to select the sampling frequency is to use 20 to 30 times the bandwidth of the analog control system which has the same system configuration and parameters as the digital one. In this paper, a new method to select the sampling period is suggested which takes into account of the performance as well as the stability of the digital control system. By use of the frying's model of steam generator, the optimal sampling period of an assumptive digital control system for steam generator level control is estimated and is actually verified in the digital control simulation system for KORI-2 nuclear power plant steam generator level control. Consequently, we conclude the optimal sampling period of the digital control system for KORI-2 nuclear power plant steam generator level control is 1 second for all power ranges.

  • PDF

A Study on Spatial Scheduling in the P.E. Stage (선행 탑재장에서의 공간일정계획에 관안 연구)

  • Koo Chung-kon;Yoon Duck-Young;Bae Tae-Kyu;Cho Min-Ch
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.61-66
    • /
    • 2004
  • In this paper an effort is made to develop an innovative spatial arrangement concept pertaining to ship building industry. The spatial scheduling is the problem that concentrates on effective planning of available space and arrangements of blocks and in a priority manner. In order to create an effective spatial scheduling. a database providing the priority has to be available to make the erection sequence. Such a system works hand in hand with erection sequence generator program The erection sequence program works on the conventional network analysis method which uses a typical parent-children idea for the calculation of the ENT(possible earliest network start time) and LNT(possible latest network start time). This program works in a cyclic manner taking turns by calculating the ENT in upward trace and LNT on the return trace thereby generating the entire erection sequence diagram for the requisite problem The generated database serves as an input data for spatial scheduling problem. When the system works it takes into consideration the entire system based on heuristic concepts as mentioned. There system uses the spatial aspects such as the available area of the P. E area and plan area of the corresponding blocks and its priority of erection from the erection sequence generator program develops the spatial scheduling arrangement. In this paper using all these concepts an innovative spatial schedule development system developed.

  • PDF

A Two-stage Stochastic Programming Model for Optimal Reactive Power Dispatch with High Penetration Level of Wind Generation

  • Cui, Wei;Yan, Wei;Lee, Wei-Jen;Zhao, Xia;Ren, Zhouyang;Wang, Cong
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.53-63
    • /
    • 2017
  • The increasing of wind power penetration level presents challenges in classical optimal reactive power dispatch (ORPD) which is usually formulated as a deterministic optimization problem. This paper proposes a two-stage stochastic programming model for ORPD by considering the uncertainties of wind speed and load in a specified time interval. To avoid the excessive operation, the schedule of compensators will be determined in the first-stage while accounting for the costs of adjusting the compensators (CACs). Under uncertainty effects, on-load tap changer (OLTC) and generator in the second-stage will compensate the mismatch caused by the first-stage decision. The objective of the proposed model is to minimize the sum of CACs and the expected energy loss. The stochastic behavior is formulated by three-point estimate method (TPEM) to convert the stochastic programming into equivalent deterministic problem. A hybrid Genetic Algorithm-Interior Point Method is utilized to solve this large-scale mixed-integer nonlinear stochastic problem. Two case studies on IEEE 14-bus and IEEE 118-bus system are provided to illustrate the effectiveness of the proposed method.

Dual Capacity Price Mechanism to Provide Stable Remuneration for Generation Capacity (전력도매시장에서의 안정적 발전용량 보상을 위한 이원적 용량가격 제도 도입 방안)

  • Kim, Yung San
    • Environmental and Resource Economics Review
    • /
    • v.25 no.1
    • /
    • pp.113-140
    • /
    • 2016
  • Achieving the two goals of providing stable remuneration and promoting market based incentive for generation capacity with only one kind of capacity price is a difficult proposition. This paper suggests a market design in which two different kinds of capacity prices are used to achieve these goals. It maintains the current capacity price that is determined administratively based on the fixed cost of the gas-turbine generator. A second capacity price is added that covers generators with higher fixed costs and lower fuel costs such as combined-cycle gas turbine, coal-powered, and nuclear generators. This second capacity price is conditional on a lower energy price ceiling and determined by the interaction of the market supply and a demand schedule derived from the optimal fuel mixed principle.

Performance of a Commercial Scale Radio-frequency/vacuum Dryer Combined with a Mechanical Compressive Load (산업용 규모의 압체고주파진공건조시스템 성능 평가)

  • LEE, Nam-Ho;ZHAO, Xue-Feng;HWANG, Ui-Do;CHANG, Sae-Hwan;SHIN, Ik-Hyun
    • Journal of the Korean Wood Science and Technology
    • /
    • v.37 no.3
    • /
    • pp.192-199
    • /
    • 2009
  • This study was carried out to investigate the performance of a radio-frequency/vacuum dryer combined with a mechanical compressive load (RF/VC) with a scale of about $3m^3$ during drying board of Azobe (Lophira alata) and Korean red pine (Pinus densiflora). The degree of vacuum of the RF/VC system was maintained at 80~105 torr, and wood temperature was increased from $40^{\circ}C$ at the beginning of drying to $60^{\circ}C$ at the end of drying and the radiofrequency generator was operated with schedule of 7 minute-ON and 3 minute-OFF. The wood temperatures near charge plate always remained higher than those of the control during all of the drying stage, whereas the wood temperature near ground plate always remained lower than those of the controlled. As drying time proceeding, the temperature of the wood near ground plate presented lower than those of the control. Whereas the temperature of the wood near charge plate presented higher than those of the controlled. The final average moisture contents of the Azobe boards stacked near the input side of the RF generator showed slightly lower than those near the opposite side. Those of the wood stacked in the layers near the charge plate were lower than those of near the ground plate. The average length of surface checks of the Azobe boards stacked near the charge plate was very slight, whereas that toward the ground plate represented high values. The efficiency of input energy was simliar with the commercial systems.

A Study on the Feasibility of IGCC under the Korean Electricity Market (국내 전력거래제도하에서 IGCC 사업성 확보를 위한 정책 제언)

  • Ko, Kyung-Ho
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.22 no.1
    • /
    • pp.118-127
    • /
    • 2011
  • An IGCC was evaluated as one of the next generation technologies that would be able to substitute for coal-fired power plants. According to "The 4th Basic Plan of Long-term Electricity Supply & Demand" which is developed by the Electricity Business Acts, the first IGCC will be operated at 2015. Like other new and renewable energy such as solar PV, Fuel cell, The IGCC is considered as non-competitive generation technology because it is not maturity technology. Before the commercial operation of an IGCC in our electricity market, its economic feasibility under the Korean electricity market, which is cost-based trading system, is studied to find out institutional support system. The results of feasibility summarized that under the current electricity trading system, if the IGCC is considered like a conventional plant such as nuclear or coal-fired power plants, it will not be expected that its investment will be recouped within life-time. The reason is that the availability of an IGCC will plummet since 2016 when several nuclear and coal-fired power plants will be constructed additionally. To ensure the reasonable return on investment (NPV>0 IRR>Discount rate), the availability of IGCC should be higher than 77%. To do so, the current electricity trading system is amended that the IGCC generator must be considered as renewable generators to set up Price Setting Schedule and it should be considered as pick load generators, not Genco's coal fired-generators, in the Settlement Payment.