• Title/Summary/Keyword: Schedule delay

Search Result 222, Processing Time 0.022 seconds

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

Interrelationship Analysis between Causal Factors of Construction Defect Using Association Rule Mining

  • Lee, Sang-Deok;Han, Sang-Won;Hyun, Chang-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.627-628
    • /
    • 2015
  • Construction defect which can causes economic damage such as schedule delay, cost overrun is a considerably important factor in construction industry. In general, a construction defect features a difficulty to find out causes precisely because it occurs when several interrelated causes combine. Yet, studies have tried to understand the interrelationships between factors are limited. In addition, despite of a tremendous amount of construction data, it's not still enough to analyze them, but tends to depend on experience or know-how of practitioners. Thus, it is necessary to identify underlying causes in influential factors by utilizing related data. This paper analyses Interrelationships between causal factors using Association Rule Mining to discover root causes of construction defects. Confidence and Lift that can be used for presenting the interrelationships of the causes were extracted from 1241 cases in 30 projects in Korea. It is expected that this paper allows the construction managers to discover key factors and make right decisions to reduce occurrence of construction defects. Furthermore, analysis of interrelationships can improve understanding of structural patterns of construction defects.

  • PDF

An Efficient Algorithm to Reduce the Broadcast Storm in VANETS

  • Aziz Hanifi;Robab Hamlbarani Haghi
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.9
    • /
    • pp.162-168
    • /
    • 2024
  • VANET (vehicular ad hoc network) refers to the case networks designed for vehicles. Such networks are established among the vehicles which are equipped with communication tools. Within these networks, vehicles are regarded as the network nodes. On time and on schedule transmission of data is of high significance for these networks. In order to accomplish the objective of on-time data transmission, specific electronic equipment is embedded in each vehicle which maintains ad hoc communications among the passengers. Information about traffic, road signs and on-line observation of traffic status can be transmitted via these networks; such data makes it possible for the driver to select the best route to reach his destination. If there are not any infrastructures, two broadcasting approaches can be considered: overflowing and rebroadcasting. The overflowing approach leads to heavy traffic. Hence, the challenge we face is to avoid the broadcasting flood. In this paper, an approach for the management of the broadcasting flood is proposed based on fuzzy theory. The proposed method is assumed to have better performance and efficiency than any other approaches in terms of crash rate, the rate of message success and delay

COVID-19's Impact on the Space Industry and Countermeasures in Korea (코로나19가 한국 우주산업에 미친 영향과 대응방안)

  • Kim, Jong-Bum
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.4
    • /
    • pp.195-201
    • /
    • 2020
  • COVID-19 is hitting the world. In order to bring about new ways of innovation in the space sector, we need to analyze changes in the space sector and design new challenge strategies. COVID-19 exposes inherent vulnerabilities in the space sector. In particular, COVID-19 is causing supply chain shocks in the space industry, resulting in delays in the supply of systems, subsystems and parts due to a complete or partial interruption of a manufacturing unit. As the overall impact of New Normal on the industry is overall, we continue to look at it in the space sector. COVID is causing supply chain shock in the space industry. It causes a delay in the supply of systems, subsystems and parts due to a complete or partial interruption of a manufacturing unit. In the supply of launch services, the launch schedule is being delayed, but the main launch is still taking place. Demand for major applications such as environmental monitoring is soaring in the earth observation utilization sector. Analyzing the impact on manufacturing, the vendor-based contraction is bringing delays in the supply of systems, subsystems and components, and launch service providers are trying to minimize delays in the launch schedule.

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Influencing Factors on the Duration of Offset Agreement (절충교역 계약 소요기간 영향요인)

  • Hong, Seok-Soo;Joung, Tae-Yun;Seo, Jae-Hyun;Hong, Moon-Hee
    • Journal of Technology Innovation
    • /
    • v.20 no.1
    • /
    • pp.1-15
    • /
    • 2012
  • Republic of Korea has been applying offset to defense acquisition program for some benefits such as modernization of defense industry and enhancement of R&D capabilities since 1983. But in point of implementation, there is the possibility of delay of offset agreements based on the value of proposed technologies. As it often happens that the delay of offset agreement negatively affects the time schedule of main defense deal, it is necessary to prepare for this issue. The purpose of this study is to extract some factors affecting the duration of offset agreement by statistical analysis. Reviewing existing papers and contract process, nationality of enterprise, the number of project participants, properties of project, the number of technologies in the first proposal, level of domestic defense technology in each weapons system, the amount of main contract were used as independent variable and duration of agreement as dependent variable. To hypothesis testing, correlation and multiple regression analysis were conducted using the previous 25 contract cases. As a result of correlation analysis, the amount of main contract, the number of technologies in the first proposal and properties of project have positive relationships with dependent variable. In multiple regression, the amount of main contract and the number of project participants have significant effect on the duration of offset agreement.

  • PDF

Performance Evaluation of Traffic Adaptive Sleep based MAC in Clustered Wireless Sensor Networks (클러스터 기반 무선 센서 망에서 트래픽 적응적 수면시간 기반 MAC 프로토콜 성능 분석)

  • Xiong, Hongyu;So, Won-Ho
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.48 no.5
    • /
    • pp.107-116
    • /
    • 2011
  • In this paper, a traffic adaptive sleep based medium access control (TAS-MAC) protocol for wireless sensor networks (WSNs) is proposed. The protocol aims for WSNs which consist of clustered sensor nodes and is based on TDMA-like schema. It is a typical schedule based mechanism which is adopted in previous protocols such as LEACH and Bit-Map Assisted MAC. The proposed MAC, however, considers unexpected long silent period in which sensor nodes have no data input and events do not happen in monitoring environment. With the simple traffic measurement, the TAS-MAC eliminates scheduling phases consuming energy in previous centralized approaches. A frame structure of the protocol includes three periods, investigation (I), transmission (T), and sleep-period (S). Through the I-period, TAS-MAC aggregates current traffic information from each end node and dynamically decide the length of sleep period to avoid energy waste in long silent period. In spite of the energy efficiency of this approach, the delay of data might increase. Thus, we propose an advanced version of TAS-MAC as well, each node in cluster sends one or more data packets to cluster head during the T-period of a frame. Through simulation, the performance in terms of energy consumption and transmission delay is evaluated. By comparing to BMA-MAC, the results indicate the proposed protocol is more energy efficient with tolerable expense in latency, especially in variable traffic situation.

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF

Cancerous Transfer Evaluation which Presumes as Prosecuting Attorney Nuclear Medicine (핵의학적 검사로 추정한 암 전이 평가)

  • Kim, Seung-Chul
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.12
    • /
    • pp.236-245
    • /
    • 2008
  • The cancer patient who leads Bone scan and the PET study from in the nuclear medical study what is enforced with the link of early detection and the time which spreads, it will be able to accomplish a positive treatment with the data which presumes that time it researches a degree as cancer discovery initially and only difference of final period the bay it knows. The patient who receives a cancer decision it will be able to accomplish the necessary defense it will be able to delay the time in order, the maximum control the possibility of doing will be becomes the judgement. Cancer decision to initially the nuclear study and treatment it will be in parallel with effort and the investment which are constant and the schedule hour will elapse and to after difficulty some the case which comes to be negligent will be frequent and it will appear with him there to be a possibility of knowing, it will be caused by and the transfer of the cancer sell will be activity. It has a treatment objective and are to each medical treatment agency against and the medical treatment agency worker it will be able to overlook is not the portion is the private plan which needs a more positive disposal, it does.