• Title/Summary/Keyword: Schedule Simulation

Search Result 409, Processing Time 0.025 seconds

The Design of Distributed Control Algorithm for Mobile Communication Network in the Battle Field (전투지역에서의 이동통신을 위한 분산제어 알고리즘 설계)

  • 이경현;송주석
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.16 no.11
    • /
    • pp.1167-1178
    • /
    • 1991
  • In this paper, we review the characteristics of battle field, consider required properties of mobile radio network, and design network control architecture proper to battle field network. Also we design distributed algorithm which constructs network control architecture and transmission schedule. For the information of network connectivity and the immediate reconfiguration caused by failure, loss, or movement of nodes, configuration and transmission schedule, algorithms are to be executed periodically and for entire network reliability, algorithms must to be executed fully distributedly. At the time of loss or failure of primary local control node, we suggest the method which diminishes transmission delay. We explain the operation of network with examples. Finally designed algorithms are verified and analized by computer simulation.

  • PDF

Development of ESS Scheduling Algorithm to Maximize the Potential Profitability of PV Generation Supplier in South Korea

  • Kong, Junhyuk;Jufri, Fauzan Hanif;Kang, Byung O;Jung, Jaesung
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.6
    • /
    • pp.2227-2235
    • /
    • 2018
  • Under the current policies and compensation rules in South Korea, Photovoltaic (PV) generation supplier can maximize the profit by combining PV generation with Energy Storage System (ESS). However, the existing operational strategy of ESS is not able to maximize the profit due to the limitation of ESS capacity. In this paper, new ESS scheduling algorithm is introduced by utilizing the System Marginal Price (SMP) and PV generation forecasting to maximize the profits of PV generation supplier. The proposed algorithm determines the charging time of ESS by ranking the charging schedule from low to high SMP when PV generation is more than enough to charge ESS. The discharging time of ESS is determined by ranking the discharging schedule from high to low SMP when ESS energy is not enough to maintain the discharging. To compensate forecasting error, the algorithm is updated every hour to apply the up-to-date information. The simulation is performed to verify the effectiveness of the proposed algorithm by using actual PV generation and ESS information.

A study of charge and discharge strategy analysis on HEV battery under urban dynamometer driving schedule (도시운전모드 하에서 HEV 배터리 충.방전 전략 분석에 대한 연구)

  • Kim, Seong-Gon;Jeong, Ki-Yun;Yang, In-Beom;Kim, Deok-Jin;Lee, Chun-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2007.10c
    • /
    • pp.247-249
    • /
    • 2007
  • Urban dynamometer driving schedule(FTP-75 mode) plays very significant role on automotive emission test, due to reference point. The overall system energy efficiency of a HEV(Hybrid Electric Vehicle) is highly dependent on the energy management strategy employed. An energy source is the heart of a HEV. In order to applicable to a vehicle component, it must be need to real world test result. But, the present state of things have numerous problems. In this paper, be studied performed based on HEV simulation software in virtual world and chassis dynamometer test in real world and the result make a comparative. Toyota Prius vehicle was adapted as a modeling and real testing to evaluate the hybrid components and energy balancing management. The point at issue is voltage and current analysis for HEV battery SOC(State of Charge), and verification for energy.

  • PDF

Scheduling of a Casting Sequence Under Just-In-Time (JIT) Production (적시 생산 방식에서의 주조공정 스케줄링)

  • Park, Yong-Kuk;Yang, Jung-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.3
    • /
    • pp.40-48
    • /
    • 2009
  • In this article, scheduling of a casting sequence is studied in a casting foundry which must deliver products according to the Just-in-time(JIT) production policy of a customer. When a foundry manufactures a variety of casts with an identical alloy simultaneously, it frequently faces the task of production scheduling. An optimal casting schedule should be emphasized in order to maximize the production rate and raw material efficiency under the constraints of limited resources; melting furnaces and operation time for a casting machine. To solve this practical problem-fulfilling the objectives of casting the assigned mixed orders for the highest raw material efficiency in a way specified by the customer's JIT schedule, we implement simple integer programming. A simulation to solve a real production problem in a typical casting plant proves that the proposed method provides a feasible solution with a high accuracy for a complex, multi-variable and multi-constraint optimization problem. Employing this simple methodology, a casting foundry having an automated casting machine can produce a mixed order of casts with a maximum furnace utilization within the due date, and provide them according to their customer's JIT inventory policy.

Control System Design of NREL 5MW Wind Turbine (NREL 5MW 풍력터빈의 제어시스템 설계)

  • Nam, Yoonsu;Im, Changhee
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.5
    • /
    • pp.31-40
    • /
    • 2012
  • This paper introduces a methodology for NREL 5MW wind turbine, which is the variable speed and variable pitch(VSVP) control system. This control strategy maximizes the power extraction capability from the wind in the low wind speed region and regulates the wind turbine power as the rated one for the high wind speed region. Also, pitch control efficiency is raised by using pitch scheduling.Torque schedule is made of torque table depending on the rotor speed. Torque control is used for vertical region in a torque-rotor speed chart. In addition to these, mechanical loads reduction using a drive train damper and exclusion zone on a torque schedule is tried. The NREL 5MW wind turbine control strategy is comprised by the generator torque and blade pitch control. Finally, proposed control system is verified through GH Bladed simulation.

A Study on the Multi-level Optimization Method for Heat Source System Design (다단계 최적화 수법을 이용한 열원 설비 설계법에 관한 연구)

  • Yu, Min-Gyung;Nam, Yujin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.7
    • /
    • pp.299-304
    • /
    • 2016
  • In recent years, heat source systems which have a principal effect on the performance of buildings are difficult to design optimally as a great number of design factors and constraints in large and complicated buildings need to be considered. On the other hand, it is necessary to design an optimum system combination and operation planning for energy efficiency considering Life Cycle Cost (LCC). This study suggests a multi-level and multi-objective optimization method to minimize both LCC and investment cost using a genetic algorithm targeting an office building which requires a large cooling load. The optimum method uses a two stage process to derive the system combination and the operation schedule by utilizing the input data of cooling and heating load profile and system performance characteristics calculated by dynamic energy simulation. The results were assessed by Pareto analysis and a number of Pareto optimal solutions were determined. Moreover, it was confirmed that the derived operation schedule was useful for operating the heat source systems efficiently against the building energy requirements. Consequently, the proposed optimization method is determined by a valid way if the design process is difficult to optimize.

An Analysis of Heating and Cooling Loads by Insulated Shades and Control Method in an Energy Saving Apartment (에너지절약형 주택에서의 단열차양 적용과 제어방법에 따른 냉난방부하 분석)

  • Kwon, Kyung-Woo;Won, Jong-Seo
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.33-38
    • /
    • 2009
  • Energy loss from windows accounts for large scores of heating and cooling loads also in energy saving apartments that is reduced over 30% of total energy consumption. Movable reflective insulations, insulation shutters, blinds, insulated shades are used to reduce energy loads from windows. In this study, energy saving performance of insulated shades was simulated by control methods. According to installation of insulated shades, heating loads were decreased about $10.5{\sim}11.3%$, and cooling loads are decreased about $11.0{\sim}15.5%$ on an energy saving apartment. The heating peak load was reduced about 9.5% by insulated shades, but the cooling peak load is hardly ever decreased. Because in the condition of cooling peak load, latent cooling loads accounts for large score of cooling loads. Difference of the energy loads by a schedule control method and an outdoor detection control was no more than 5% for a base model. In the case of insulated shades with automatic control system, simple time schedule control system would be more efficient than outdoor detection control system that should use several sensors.

  • PDF

Design of Rolling Pass Schedule in Copper Thin Foil Cold Rolling According to Roll Crown of 6 High Mill (6단 압연롤 크라운을 고려한 동극박 냉간 압연 패스스케줄 설계)

  • Lee, Sang-Ho;Ok, Soon-Young;Hwang, In-Youb;Hwang, Won-Jea;Kim, Byung-Min
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.25 no.11
    • /
    • pp.66-72
    • /
    • 2008
  • During the plate and foil cold rolling process, considerable values of the force of material pressure on the tool occur. These pressures cause the elastic deformation of the roll, thus changing the shape of the deformation legion. Rolled copper foils should be characterized by a good quality and light dimensional tolerances. Because of automation that is commonly implemented in flat product rolling mills, these products should meet the requirements of tightened tolerances, particularly strip thickness, and feature the greatest possible flatness. The shape of the roll gap is influenced by the elastic deformation of rolls parts of the rolling process affecter of the pressure force. However, to control roll deformation should be difficult. Because the foil thickness is very thin and the permissible deviations in the thickness of foil are small. In this paper, FE-simulation of roll deformation in thin foil cold roiling process is presented.

A Dynamic Scheduling Method for Mobile Broadcasting Using User Profiles (사용자 프로파일을 활용한 모바일 방송에서의 동적 스케줄링)

  • Park, Mee-Hwa;Lee, Yong-Kyu
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.2 s.46
    • /
    • pp.111-121
    • /
    • 2007
  • In mobile computing environments, data broadcasting is widely used to resolve the problem of limited power and bandwidth of mobile equipments. However, the previous broadcast scheduling methods can be inefficient in the environment where the user requests change dynamically since they are based on static data requests. Moreover, a high-priority user can wait long for infrequently requested data because they never consider the priority of listeners. In this paper, we propose a new broadcast scheduling method that reflects dynamic changes of user requests using user profiles. It also reflects user priorities to reduce the access time of high-priority users. We evaluate the performance of the proposed method through simulation.

  • PDF

A Study on Schedule Management in Construction Projects by CCPM (CCPM을 이용한 건설사업 일정관리에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.84-92
    • /
    • 2004
  • Construction work varies with the project types. However, the success of all project types depends upon three conditions i.e. schedule, quality and cost. If these three conditions are fulfilled, then project said to be successful. In this paper, scheduling of a construction Project has been dealt with the application of CCPM method. CCPM has been introduced as a new theory in construction industry in 1997 at the United States, but its application is still insufficient in domestic field due to the absence of systematic study, A simulation has been conducted in a Bridge construction project to validate the possibility of CCPM in order to complement PERT/CPM in construction field. The result of study shows that the CCPM could be effective to reduce the project time duration than existing PERT/CPM technique.