• Title/Summary/Keyword: Schedule Planning

Search Result 364, Processing Time 0.027 seconds

A Study on Scheduling of Scrap Disposal for Deap-sea Fishing Industry Using a Mixed Integer Programming Model (혼합정수계획 모형을 활용한 원양산업의 최적 감척 일정계획 수립에 관한 연구)

  • Kim, Jae-Hee
    • Korean Management Science Review
    • /
    • v.27 no.2
    • /
    • pp.55-66
    • /
    • 2010
  • In Korea, deap-sea fishing industry plays an important role in a food industry. However, it is in a difficult situation because of the more competitive business environment. Therefore, there is a need to restructure the deap-sea fishing industry by scraping superannuated ships. This paper is designed to present scrap programs for deap-sea fishing industry of Korea. We performed ratio analysis to evaluate financial performance of fishing companies and then applied a mixed integer programming (MIP) model to identify optimal schedule for scraping. The results of the financial ratio analysis indicates that it is legible to provide governmental aid to Atlantic trawl, Northern Pacific trawl, and Indian ocean trawl with minimum required rate of return (MRR) of 3%, and the Atlantic strip fishing industry is qualified to receive the governmental aid with MRR value of 5%. Furthermore, by applying the MIP model to develop scrap planning, we demonstrate how our model can be used to restructure the deap-sea fishing industry of Korea.

Strategic Approach to Enhance the Research and Development Productivity (연구개발에서의 생산성 향상을 위한 전략적 접근)

  • 윤석환
    • Journal of the Korean Professional Engineers Association
    • /
    • v.32 no.6
    • /
    • pp.40-43
    • /
    • 1999
  • The R&D productivity has the same meaning as that of general meaning. Its input includes budget, facility, schedule, idea and target, and its output includes patent, paper, technological innovation and revenue increase and technology accumulation influenced by these factors. The choice of R&D item which will have the large effectiveness after customization, resource input of proper level, application of efficient development schema, effective usage of development output, objective appraisal for the R&D output and extension for the future project are the main factors for which is suggested to enhance the R&D productivity. The management's expectation for R&D can be represented as the innovativeness of output and potential influence to outsiders. The speedy output, even if incremental investment more than planning happens, will eventually result in the productivity enhancement of the enterprise, and managers must not encounter the opportunity loss in return for the excessive investment control.

  • PDF

En-route Trajectory Prediction via Weighted Linear Regression (가중선형회귀를 통한 순항항공기의 궤적예측)

  • Kim, Soyeun;Lee, Keumjin
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.4
    • /
    • pp.44-52
    • /
    • 2016
  • The departure flow management is the planning tool to optimize the schedule of the departure aircraft and allows them to join smoothly into the overhead traffic flow. To that end, the arrival time prediction to the merge point for the cruising aircraft is necessary to determined. This paper proposes a trajectory prediction model for the cruising aircraft based on the machine learning approach. The proposed method includes the trajectory vectored from the procedural route and is applied to the historical data to evaluate the prediction performances.

Essence Applicability Matrices for the Reduction of Project Cycle Time

  • Hong, Tae Hoon;Son, Jae Ho
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.57-68
    • /
    • 2006
  • Global competition and reduced project life cycle ultimately puts greater performance requirements on the capital project delivery systems used to maintain competitiveness. Despite continuing improvements in delivery cycle time, business owners of facilities continue to demand greater improvements in project delivery cycle time. Therefore, it is very important to investigate the various techniques and methods leading to reduction in project cycle time and also identify the applicability of identified techniques and methods. This paper introduces reduction techniques identified through literature review (i.e, Schedule Reduction Techniques (SRTs), Management Techniques (MTs), and Construction Institute Industry (CII) Best Practices (BPs). In order to collect applicability of these techniques under different project phases (Pre-project planning (PPP), Design (D), Material Management (MM), Construction (C), and Start-up (SU)), the Essence Applicability Matrices (EAM) is used.

Development of Generator Maintenance Scheduling Program (발전기 예방정비계획 전산모형 개발)

  • Park, Jong-Bae;Jeong, Yun-Won;Joo, Haeng-Ro;Yi, Myoung-Hee;Shin, Jum-Gu
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.216-217
    • /
    • 2006
  • This paper presents development of program for generator maintenance scheduling. The maintenance scheduling of generating units is a dynamic discrete combinatorial optimization problem with constraints to determine the optimal maintenance periods of each generating units for a given planning periods. The developed program is designed so as to provide the maintenance schedule satisfying the operating reserve margin levelization and the procurement of proper reliability. In order to verify the effectiveness of the developed program, the numerical study has been performed with the practical data in 2005.

  • PDF

ESTIMATION OF DAM DISCHARGE FOR THE DOWN STREAM WATER QUALITY

  • Ha, Jin-Kyu;Hong, Il-Pyo
    • Water for future
    • /
    • v.35 no.5
    • /
    • pp.51-59
    • /
    • 2002
  • In recent years the human impact on the environment becomes increasing lift threatening, calls for the better management of resources. In field of water quality of river flow, the best way to conserve water quality is specific efforts to control the pollutant loadings and treat the loadings in the basin to reduce the discharge of pollutant loadings to river. But in general the water quality influenced by the dam discharge. Especially in dry season, it is more dominant way to improve the water quality which contaminated with the pollutant loadings from the basin. The dam discharge amounts of the 2 dams in the Keum River that maintain the down stream water quality were estimated for the year of 1999, 2001, 2006, 2011, in case of irrigation and non-irrigation seasons. The pollutant loadings for the basin are estimated with the planning of treatment plants construction schedule for every sub-basins. The river flow rates were considered low flow as 2.33 year low flow and 10 year low flow. The QUAL2E model was used as a tool of simulation.

  • PDF

A Survey on the BIM Education Status for Activating BIM Tool Instruction on School Building Construction (학교건축물 BIM 도입활성화를 위한 BIM 교육실태 조사연구)

  • Seo, Deok-Seok;Won, Ho-Sik
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.12 no.2
    • /
    • pp.53-60
    • /
    • 2013
  • BIM(Building Information Modeling) is an indispensable tool to secure global competitiveness in construction sector, as already adapted significantly in European countries and U.S. In particular, as considering School Buildings constructed by BTL Method, using BIM tools are required for the accurate estimation of construction cost in planning stage, exact design and construction, well-judged settlement and performance of maintenance schedule. Therefore, this study investigates the BIM education status and the problems on using BIM tools through a survey of 100 BIM trainees and suggests improvement method of BIM education.

Productivity Measurement and Analysis on Factors in Steel Erection (철골세우기의 현장생산성 측정 및 영향요인 분석)

  • Lee, Ji-Yong;Huh, Young Ki;Ahn, Bang Ryul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.123-127
    • /
    • 2008
  • As buildings becoming higher and more enormous the portion of steel works has been increased, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

  • PDF

The Plan to Improve Highly Integrated Total Energy System (전력수급 종합시스템 운용현황 및 개선방안)

  • Park, S.W.;Yoon, Y.B.
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.326-329
    • /
    • 2001
  • The main purpose of HITES(Highly Integrated Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The HITES can be utilized to supply a stable electric power and operate KEPCO's power system facilities economically. This system was put into operation in 1999. This paper describes the present condition for operation of HITES and proposes the plan to improve this system after installation.

  • PDF

중소기업을 위한 생산정보시스템의 개발

  • 정병호;소영섭;허은영;이해영;조영호;김정수
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.190-193
    • /
    • 1996
  • In recent, most of automobile industries adopt the concept of Just In Time production. The paternal manufacturers require their suppliers to supply parts just in time. It is very important for a subcontractor to produce the parts in the appointed time of delivery. This study develops a production information system for Woosin Industry, which is one of such subcontractor of Hundai Motors Company(HNC). The system is developed on Client/Server system. Firstly, three modules are developed, i.e., scheduling module to make a schedule, the subsystem of sales management to deal with the information about order of HMC, delivery of parts, and bill collecting, and the module for supporting material requirement planning and purchace of material.

  • PDF