• Title/Summary/Keyword: Schedule Performance Index

Search Result 27, Processing Time 0.024 seconds

Appraising the Performance of Construction Projects during Implementation in Kenya, 1963-2018: A Literature Review Perspective

  • Ong'ondo, Cyrus Babu;Gwaya, Abednego Oswald;Masu, Sylvester
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.2
    • /
    • pp.1-24
    • /
    • 2019
  • Poor project performance has been noted as the bane in the construction industry globally. This paper sought to investigate, by way of literature, the performance patterns of construction projects in Kenya since independence (1963-2018). This was informed by reports of undesirable project performance in the industry. This descriptive study used available studies previously done in this subject area. In sum, literature is replete with evidence on a myriad of challenges facing the execution of projects. The study established that generally, the project performance is poor and has assumed a chronic trajectory spanning over five decades. On average, the findings reveal that 35-60% of projects initiated in Kenya face cost overruns while time overrun is most severe with 35-73% projects overrunning their schedule. In addition, the findings problematize the issue of plurality of performance measurement regimes in the construction industry. Here, it was observed that no singular construct exists to objectively measure the various facets that constitute the 'health' of a project. This paper has contributed to the body of knowledge by examining the performance patterns in Kenya for over fifty years while at the same time identifying the bottlenecks inherent in projects execution. Importantly, the conceptual performance efficiency framework derived in the current study presents a paradigm shift in the monitoring and evaluation of projects. To this end, an in-depth analysis is recommended on the interaction of efficiency enablers in the buildup of performance efficiency index (PEI). Similarly, a further inquiry is recommended on the integration and impact of the proposed framework in the management of projects.

The Effects of Telerehabilitation Based Occupational Therapy on Executive Function, Activities of Daily Living, and Occupation Performance of People With Stroke (원격재활 기반 작업치료가 뇌졸중 환자의 실행기능, 일상생활수행, 작업수행에 미치는 영향)

  • Park, Seong-Sun;Kim, Su-kyung;Yoo, Doo-Han;Kim, Hee
    • Therapeutic Science for Rehabilitation
    • /
    • v.10 no.1
    • /
    • pp.115-127
    • /
    • 2021
  • Objective : The purpose of this study was to investigate the effect of telerehabilitation on executive function, activities of daily living, instrumental activities of daily living, and occupational performance in stroke patients. Methods : The participants of this study were 30 outpatients with stroke residing in community. Both groups underwent the intervention 3 times a week for a total of 18 sessions. For the experimental group telerehabilitation was administered at home to only fifteen participants in the experimental group schedule, and it was supervised by the caregiver. Fifteen people in the control group underwent only the traditional occupational therapy. Executive function and instrumental activities of daily living were evaluated using the Korean version of the Executive Function Performance Test (EFPT-K). The basic daily activities of living were assessed using the Modified Barthel Index (MBI). The Canadian Occupational Performance Measure (COPM) was used to evaluate the client-centered occupational performance. Results : After the intervention, the experimental and control groups showed improvements in executive function, instrumental activities of daily living and occupational performance. Occupational performance improved more significantly in the experimental group than in the control group. Conclusion : Telerehabilitation and occupational therapy positively affect executive function, instrumental activities of daily living and occupational performance of patients with stroke. We suggest that telerehabilitation combined with occupational therapy is more effective in improving the occupational performance of stroke patients.

An Experimental Study on Hydration Heat Control in The Mass Concrete Using Oscillating Capillary Tube Heat Pipe (진동세관형 히트파이프(OCHP)를 이용한 매스콘크리트의 수화열 제어에 관한 실험적 연구)

  • Beak, Dong-Il;Kim, Myung-Sik;Lee, Moon-Sik;Kim, Kang-Min;Yum, Chi-Sun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05b
    • /
    • pp.409-412
    • /
    • 2006
  • In process of reinforced concrete(RC) box structure, the heat of hydration may cause serious thermal cracking problems. In order to eliminate hydration heat of mass concrete, this paper reports results of hydration heat control in mass concrete using the OCHP(Oscillating Capillary tube Heat Pipe). Recently OCHP is drawn special attention from these points of low cost as well as short construction schedule for the manufacturing of heat exchanger, flexibility, simplification and high performance. There were three RC box molds$(1.2{\times}1.2{\times}1.2m)$ which shows a difference as compared with each other. One was not equipped with OCHP. While others were equipped with OCHP and these were cooled with air natural convection and spraying water respectively. The OCHP was composed of copper pipe with 12 turns(O.D : 4mm, I.D : 2.8mm). The working fluid was R-22 and its charging ratio was 30(Vol. %). In order to analyze the distribution of temperature and index figure of thermal crack in sequential placement of mass concrete, we used HYCON of computer program. As a result of the experiment, the peak temperature decreased about $15.6\sim23.4^{\circ}C$ than the general specimen and the probability of thermal crack generated in mass concrete decreased up to 0%.

  • PDF

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

Performance Analysis of Electricity Demand Forecasting by Detail Level of Building Energy Models Based on the Measured Submetering Electricity Data (서브미터링 전력데이터 기반 건물에너지모델의 입력수준별 전력수요 예측 성능분석)

  • Shin, Sang-Yong;Seo, Dong-Hyun
    • Journal of Korean Institute of Architectural Sustainable Environment and Building Systems
    • /
    • v.12 no.6
    • /
    • pp.627-640
    • /
    • 2018
  • Submetering electricity consumption data enables more detail input of end use components, such as lighting, plug, HVAC, and occupancy in building energy modeling. However, such an modeling efforts and results are rarely tried and published in terms of the estimation accuracy of electricity demand. In this research, actual submetering data obtained from a university building is analyzed and provided for building energy modeling practice. As alternative modeling cases, conventional modeling method (Case-1), using reference schedule per building usage, and main metering data based modeling method (Case-2) are established. Detail efforts are added to derive prototypical schedules from the metered data by introducing variability index. The simulation results revealed that Case-1 showed the largest error as we can expect. And Case-2 showed comparative error relative to Case-3 in terms of total electricity estimation. But Case-2 showed about two times larger error in CV (RMSE) in lighting energy demand due to lack of End Use consumption information.

Effects of Relative Frequency of Knowledge of Performance on Balance Retraining in Patients With Hemiplegia (수행에 대한 지식의 상대적 빈도가 편마비 환자의 균형 재훈련에 미치는 영향)

  • Oh, Dong-Sik;Choi, Houng-Sik;Kim, Tack-Hoon;Roh, Jung-Suk
    • Physical Therapy Korea
    • /
    • v.8 no.1
    • /
    • pp.9-19
    • /
    • 2001
  • During therapy sessions, feedback is often provided concurrently by the physical therapist as the patient attempts to perform a movement and after the movement attempt. This feedback is provided to enhance the patient's balance abilities. However, recent studies in nondisabled populations have suggested that frequent feedback may be detrimental to retention or learning of motor skills. This study compared the effects of 100% relative frequency of knowledge of performance (KP) with 66% relative frequency of KP for motor learning on balance retraining in patients with hemiplegia. Twenty patients with hemiplegic were randomly assigned to one of two experimental groups. The acquisition phase consisted of 16 blocks of 5 trials for 2 days (80 total practice trials). The retention phase consisted of 2 blocks of a short-term retention test, one day after the end of the acquisition phase and a long-term retention test, one week after the end of the short-term retention test. In the 100% feedback condition, participants received feedback after every practice trial. A faded KP schedule was used in the 66% condition. No significant differences were found between the two groups during all experimental phases (acquisition and retention phases), (p>.05). However, there were significant decreases in balance index for both groups of acquisition phase (p<.05). These results suggest that 66% relative frequency of KP is not more effective than 100% relative frequency of KP with respect to retention over time when hemiparetic patients attempt to learn balance.

  • PDF

An Study about The Priority Risk Factors for Enhancing the success Rate of The Public Sector Information Projects (공공분야 정보화 프로젝트 성공률을 높이기 위한 위험요인 우선순위에 관한 연구)

  • Lee, Hyun-Soo;Lee, Moon-Goo;Lee, Nam-Yong
    • 전자공학회논문지 IE
    • /
    • v.48 no.4
    • /
    • pp.69-77
    • /
    • 2011
  • Recently, the public sector information projects have bebn larger in size, sophisticated, and diversified, which make the performance management model be studied continuously. According to the research and understanding on this, there are discontents resulted from poor requirements managements, schedule delays, budget overruns, failure to achieve expected goals, although there are increase the scale of projects and the number of information systems than ever before. it makes the requirement for the plan to manage significant risk factors systematically. So in this study, we will understand the risks which have been recognized by professionals and managers in public sector projects for enhancing the success rate. And the surveys will be conducted for the risk factors in each fields by gathering the opinions of the hands on workers in public sector project support team such as S company, L company. Finally, the correlation index between the risks and the other project fields would be clear by this survey.