Decision of Optimum Grinding Condition by Pass Schedule Change (열간압연 스케줄변경에 따른 최적연삭조건 결정)

  • Bae, Yong-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.6
    • /
    • pp.7-13
    • /
    • 2008
  • It is important to prevent roll failure in hot rolling process for reducing maintenance cost and production loss. The relationship between rolling pass schedule and the work roll wear profile will be presented. The roll wear pattern is related with roll catastrophic failure. The irregular and deep roll wear pattern should be removed by On-line Roll Grinder(ORG) for roll failure prevention. In this study, a computer roll wear prediction model under real process working condition is developed and evaluated with hot rolling pass schedule. The method of building wear calculation functions for center portion abrasion and marginal abrasion respectively was used to develop a work roll wear prediction mathematical model. The three type rolling schedule are evaluated by wear prediction model. The optimum roll grinding methods is suggested for schedule tree rolling technique.

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

On Establishing a New Fee Schedule for General Surgical Procedure Using Fuzzy MCDM

  • Hung, Chih-Young;Huang, Yuan-Huei;Chang, Pei-Yeh;Wang, Kuei-Ing;Chang, King-Jen;Liu, Yi-Hsin
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.2
    • /
    • pp.218-227
    • /
    • 2005
  • In this research a model for establishing a new, rational fee schedule for general surgical procedures in a national health insurance program is developed. A fuzzy multiple criteria decision-making (FMCDM) model is proposed. The relative values of eleven surgical procedures were obtained through an empirical study based on the FMCDM model. Consequently, a new fee schedule obtained from the FMCDM model. This new fee schedule is more convincing than previous schedule and more persuasive to the references for the policy setting.

Estimation of Software Development Efforts and Schedule Based on A Ballpark Schedule Estimation Table (개략적 일정추정표 기반 소프트웨어 개발노력과 일정 추정)

  • Park, Young-Mok
    • Journal of Internet Computing and Services
    • /
    • v.8 no.4
    • /
    • pp.105-117
    • /
    • 2007
  • In order to succeed in a bid or development, the project manager should estimate its cost and schedule more accurately in the early stage of the project. Usually, the nominal schedule of most projects can be derived from rule of thumb, first-order estimation practice, or ball-park schedule estimation table. But the rule-of-thumb models for the nominal schedule estimation are so various, and the first-order estimation practice does not provide sufficient information. So they do not help much to decide on the proper development effort and schedule for a particular size of project. This paper presents a statistical regression model for deciding the development effort and schedule of a project using the ball-park schedule estimation table. First, we have redefined such words suggested in the ballpark schedule estimation table as shortest possible schedule, efficient schedule and nominal schedule, Next, we have investigated the relationship between the development effort and the schedule. Finally, we have suggested a model for estimating the development effort and the more accurate schedule of such particular sizes of software as are not presented in the ball-park schedule estimation table. The experimental results show that our proposed regression analysis model decreases the mean magnitude of relative error by 2% at maximum. Also this model can estimated the development effort and schedule for a particular size of software.

  • PDF

Application of Work Relationships for Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Rye, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.131-133
    • /
    • 2010
  • As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

  • PDF

Cost-Schedule Tradeoff in Software Project (소프트웨어 프로젝트의 비용-일정 타협)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.13 no.4
    • /
    • pp.99-106
    • /
    • 2013
  • Generally, software development schedule compression is decided within 75% of nominal schedule. However, there are some difficulties when we judge the possibility of development schedule compression because a nominal schedule has not been definitely. Therefore, this paper investigates various nominal schedule estimation models and decides the optimum range. Basing on the performance of ISBSG Release 8,614 projects are extracted from the actual 1,595 projects. We presented development effort estimation model from those data. Also, we derived the development schedule model from the development effort. When you apply the proposed model, you will be able to estimate development effort and schedule required for the development more actually.

A Study on the Adjustment of Railway Schedule (수요를 고려한 열차 스케쥴 조정방안 연구)

  • Park Beom Hwan;Hong Sun Heum;Kim Dong Hui;Kim Gyeong Tae
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1546-1552
    • /
    • 2004
  • Railway schedule is periodically modified so that it could yield more profit by means of adjusting the schedule to demand. Most of related works are applicable under the given demand, but did not deal with dynamic relation between demand and schedule. To our knowledge, the methodology considering the relation is only the profitability evaluation model developed by SNCF. Our study suggests how to adjust the schedule to demand and therefore obtain more benefits using the profitability evaluation model.

  • PDF

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

A Development of Nurse Scheduling Model Based on Q-Learning Algorithm

  • JUNG, In-Chul;KIM, Yeun-Su;IM, Sae-Ran;IHM, Chun-Hwa
    • Korean Journal of Artificial Intelligence
    • /
    • v.9 no.1
    • /
    • pp.1-7
    • /
    • 2021
  • In this paper, We focused the issue of creating a socially problematic nurse schedule. The nurse schedule should be prepared in consideration of three shifts, appropriate placement of experienced workers, the fairness of work assignment, and legal work standards. Because of the complex structure of the nurse schedule, which must reflect various requirements, in most hospitals, the nurse in charge writes it by hand with a lot of time and effort. This study attempted to automatically create an optimized nurse schedule based on legal labor standards and fairness. We developed an I/O Q-Learning algorithm-based model based on Python and Web Application for automatic nurse schedule. The model was trained to converge to 100 by creating an Fairness Indicator Score(FIS) that considers Labor Standards Act, Work equity, Work preference. Manual nurse schedules and this model are compared with FIS. This model showed a higher work equity index of 13.31 points, work preference index of 1.52 points, and FIS of 16.38 points. This study was able to automatically generate nurse schedule based on reinforcement Learning. In addition, as a result of creating the nurse schedule of E hospital using this model, it was possible to reduce the time required from 88 hours to 3 hours. If additional supplementation of FIS and reinforcement Learning techniques such as DQN, CNN, Monte Carlo Simulation and AlphaZero additionally utilize a more an optimized model can be developed.

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.