• Title/Summary/Keyword: Schedule Deviation

Search Result 40, Processing Time 0.022 seconds

Evaluation on the Relationship between Software Engineering Level and Schedule Deviation in Software Development (SW 공학수준과 SW 프로젝트 납기성과와의 관계)

  • Kim, Seung-Gweon;Ko, Byung-Sun
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.191-204
    • /
    • 2011
  • Recently, many software companies are trying to improve the software quality and project outcome with more costs and efforts in development time. In the software convergence and integration environments, it is required efforts to gain high quality of software. In other words, it is required to utilize software engineering knowledge and technology for higher software quality and better software project productivity. The Software development productivity can be varied by software process capability according to building a framework for software development, selection and use of appropriate technology, human resource management. Software process capability will influence software project outcome which is the general opinion. This study provides empirical evidence about software engineering efforts and investment approach to lead software project performance. We measured the software engineering efforts by SW engineering level and analyzed the corelation between software engineering level and schedule deviation. And, we verified that this performance is affected by the size of software company. As a result, software process capability is important to build a infrastructure and develop systematically software project. The higher software engineering level can lead to improved software project performance.

The effect of short and long duration sintering method on microstructure and flexural strength of zirconia (단시간과 장시간의 소결방법에 따른 지르코니아의 굴곡 강도와 미세구조의 변화)

  • Lee, Ha-Bin;Lee, Tae-Hee;Kim, Ji-Hwan
    • Journal of Technologic Dentistry
    • /
    • v.42 no.2
    • /
    • pp.73-79
    • /
    • 2020
  • Purpose: The aim of this study was to investigate the influence of short and long duration sintering on microstructure and flexural strength of zirconia. Methods: To conduct three-point bending test, Zirconia specimens are milled according to ISO 6872 guidelines(N=18, n=9 per group). Two specimens group(n=8) is sintered for 10 hours(Standard schedule) and 3 hours(Speed schedule) at the peak temperature of 1550℃ with silicon carbide sintering furnace. Flexural strength of specimens are measured by instron. After coating each specimen(n=1), microstructure of specimens is observed using Scanning Electron Microscope(SEM). T-test was utilized to statistically assess the data. Results: The mean and standard deviation value of the flexural strength for standard schedule group are 578.15±57.48Mpa, that of speed schedule are 465.9±62.34Mpa. T-test showed significant differences in flexural strength between two zirconia specimen group which applied standard schedule and speed schedule respectively(p<0.05). Conclusion: The result of this study showed that the increase in sintering time led to increased grain size, and also to a positive effect on the flexural strength.

Design of Rolling Path Schedule for Refinement of Austenite Grain (오스테나이트 결정립 미세화를 위한 후판 압연 패스 스케줄의 설계)

  • Hong, Chang-Pyo;Park, Jong-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.25 no.11
    • /
    • pp.1844-1853
    • /
    • 2001
  • In the present investigation, it was attempted to design the rolling pass schedule fur a clean steel of 0.1C-1.5Mn-0.25Si with the objective of the austenite grain refinement. As the method of approach, a coupled mathematical modeling technique was proposed which consists of a recrystallization model and a flow stress modes. The validity of the coupled model was examined through comparison with results of continuous and discontinuous compression tests at various temperatures, strains and strain rates. The coupled model was incorporated with the finite element method to set up a systematic design methodology far the rolling path schedule for austenite grain refinement. Two path schedules were obtained and discussed in the paper with regard to rolling path time, average grain size, grain size deviation in thickness, etc.

A CSP-based Load Leveling Algorithm for Ship Block Erection Network

  • Ryu, Ji-Sung;Park, Jin-Hyoung;Kim, Hong-Tae;Lee, Byung-No;Shin, Jong-Gye
    • Journal of Ship and Ocean Technology
    • /
    • v.10 no.2
    • /
    • pp.37-44
    • /
    • 2006
  • The erection in shipbuilding is the process to assemble all the blocks one by one in certain order and requires more leveled and efficient schedule than other processes do. However, erection schedule includes too many constraints to be systemized with simple programs and constraints are changed frequently. These difficulties make it rare to find automatic erection schedule generation system with load leveling ability. In this paper, a CSP (Constraint Satisfaction Problem)-based load leveling algorithm using a maximum load diminution technique is proposed and applied to the block erection scheduling of a dock in a shipyard. The result shows that it performs better than currently used scheduling method based on empirical logics. The maximum load of welding length and crane usage are reduced by 31.63% and 30.00% respectively. The deviation of resource usage amount also decreases by 8.93% and 7.51%.

Study on the Optimum Route Travel Time for Bus to Improve Bus Schedule Reliability (정시성 확보를 위한 버스노선 당 적정 운행시간 산정 연구)

  • Kim, Min ju;Lee, Young ihn
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.6
    • /
    • pp.112-123
    • /
    • 2017
  • The accurate forecasting of the public transportation's transit and arrival time has become increasingly important as more people use buses and subways instead of personal vehicles under the government's public transportation promotion policy. Using bus management system (BMS) data, which provide information on the real-time bus location, operation interval, and operation history, it is now possible to analyze the bus schedule reliability. However, the punctuality should always be considered together with the operation safety. Therefore, this study suggests a new methodology to secure both reliability and safety using the BMS data. Unlike other studies, we calculated the bus travel time between two bus stops by dividing the total travel length into 6 sections using 5 different measuring points. In addition, the optimal travel time for each bus route was proposed by analyzing the mean, standard deviation and coefficient of variation of the each section's measurement. This will ensure the reliability, safety and mobility of the bus operation.

Development of a Smart Application for Protecting Dementia Patients (치매환자의 보호를 위한 스마트 앱 개발)

  • Hwang, Hyun Suk;Ko, Yun Seong;Ban, Ga Un;Kim, Chang Soo
    • Journal of Korea Multimedia Society
    • /
    • v.16 no.9
    • /
    • pp.1089-1097
    • /
    • 2013
  • The applications for considering their position and daily patterns of dementia patients have been developed in an early stage even if the older patients who have weaker or serious symptoms has increased in various forms. In this paper, we develop an android-based application which displays positions and pathways of patients on maps and provide messages in the cases of dangerous situations. Guardians need to register schedules including safe areas and personal information of their patients. This system registers behavior status categorized as normal or abnormal each position which is sent to a database. In particular, the deviation status is assigned in case the patients are not within the safe areas that their guardians registered on their schedule. The wandering status is assigned in case the patients are repeatedly passed by their pathways. This smart application contains the modules such as patient position sending, guardian and patient information, patient schedule and safe zone registration, position and behavior status registration, pathway display and message sending, and rescue request. This system sends the notification and alarm service providing normal and abnormal behavior with deviation and wandering status of patients respectively.

A Development of the Optimization Model for Reactive Scheduling Considering Equipment Failure (장치이상을 고려한 동적 생산계획 최적화 모델 개발)

  • Ha, Jin-Kuk;Lee, Euy Soo
    • Korean Chemical Engineering Research
    • /
    • v.43 no.5
    • /
    • pp.571-578
    • /
    • 2005
  • We propose a new optimization framework for the reactive scheduling. The proposed rescheduling scheme is specially focused on how to generate rescheduling results when equipment failure occurs. The approach is based on a continuous-time problem representation that takes into account the schedule in progress, the updated information on the batches still to be processed, the present plant state, the deviations in plant parameters and the time data. To update the predictive scheduling, we used right shift rescheduling and total regeneration when equipment failure occurs. And, a practical solution to the rescheduling problem requires satisfaction of two often confliction measures: the efficiency measure that evaluates the satisfaction of a desired objective function value and the stability measure that evaluates the amount of change between the schedules before and after the disruption. In this paper, the efficiency is measured by the makespan of all jobs in the system. And, the stability is measured by the percentage change in makespan and the modified sequence deviation in the predictive scheduling and rescheduling.

Meta-Heuristic Algorithms for a Multi-Product Dynamic Lot-Sizing Problem with a Freight Container Cost

  • Kim, Byung-Soo;Lee, Woon-Seek
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.3
    • /
    • pp.288-298
    • /
    • 2012
  • Lot sizing and shipment scheduling are two interrelated decisions made by a manufacturing plant and a third-party logistics distribution center. This paper analyzes a dynamic inbound ordering problem and shipment problem with a freight container cost, in which the order size of multiple products and single container type are simultaneously considered. In the problem, each ordered product placed in a period is immediately shipped by some freight containers in the period, and the total freight cost is proportional to the number of containers employed. It is assumed that the load size of each product is equal and backlogging is not allowed. The objective of this study is to simultaneously determine the lot-sizes and the shipment schedule that minimize the total costs, which consist of production cost, inventory holding cost, and freight cost. Because the problem is NP-hard, we propose three meta-heuristic algorithms: a simulated annealing algorithm, a genetic algorithm, and a new population-based evolutionary meta-heuristic called self-evolution algorithm. The performance of the meta-heuristic algorithms is compared with a local search heuristic proposed by the previous paper in terms of the average deviation from the optimal solution in small size problems and the average deviation from the best one among the replications of the meta-heuristic algorithms in large size problems.

An Artificial Neural Network for Job Scheduling under Just-In-Time Environment (JIT(Just-In-Time) 하의 작업스케쥴링을 위한 인공신경망)

  • Kim, Soo-Young;Lee, Moon-Kyu;Yun, Chan-Kyun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.1
    • /
    • pp.3-16
    • /
    • 1995
  • JIT manufacturing requires that materials and services should be done neither too early nor tardy. Therefore, related jobs have to be performed just-in-time. In this paper, we consider a problem of determining a schedule of jobs with a common due date. The objective is to minimize the squared deviation of complete times from the due date. An artificial neural network which is based on the mean field theory is proposed for the problem. Computational results obtained from computer simulations show that the network performs very well.

  • PDF

Evaluation of the Performance of Re-entry System for the Typical Uncertainties

  • L., Daewoo;C., Kyeumrae;P., Soohong
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.156.4-156
    • /
    • 2001
  • The uncertainties of an atmospheric re-entry flight with respect to stability and controllability are aerodynamic error, measurement error of the angle of attack, variation of dynamic pressure, wind, and trim position of the control surfaces, etc. During hypersonic flight, a future angle of attack is biased from a nominal schedule. In order words, because the angle of attack is estimated from the navigation data, estimation error occurs due to wind, atmospheric density variation, etc. Error models used in this study, include a standard deviation of +-3 sigma, and are the normal distribution of statistics. This paper shows the appraisement of tracking performance onto the reference trajectory, satisfaction of the initial condition of TAEM about the re-entry system.

  • PDF