• Title/Summary/Keyword: Scattering Dust Construction Site

Search Result 13, Processing Time 0.016 seconds

A Model for Optimization Process of Asbestos Dismantling Work Using Simulation (시뮬레이션을 이용한 석면 해체공사의 최적화 공정계획 모델)

  • Cho, Hyeong-Jun;Noh, Jae-Yun;Lee, Ho-Hyeon;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.17-18
    • /
    • 2022
  • In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.

  • PDF

Assessment of Soil Washing Efficiency for Arsenic Contaminated Site Adjacent to Jang Hang Refinery (장항제련소 주변 비소오염토양의 특성분석에 따른 토양세척 처리효율 평가)

  • Moon, So-Young;Oh, Min-Ah;Jung, Jun-Kyo;Choi, Sang-Il;Lee, Jai-Young
    • Journal of Soil and Groundwater Environment
    • /
    • v.16 no.1
    • /
    • pp.71-81
    • /
    • 2011
  • Cause of contamination in the study area nearby Jang Hang Refinery is dust scattering in refinery stack, and soil washing treatment is one of the proper technologies for soil remediation in this area. Site conditions frequently limit the selection of a treatment process. A treatment technology may be eliminated based on the soil classification or physicochemical characteristics of soil. This study was assessed the soil washing efficiency by conducting of soil characteristic analysis in the vicinity of Jang Hang Refinery Stack within a 2 km radius. Also, it was decided about remedial range with comparative analysis of As in soil by Korean Standard Test Method before/after revision, whereupon As concentration in soil showed a increasing tendency after revision. As a result, the soil washing using the size separation of soil was determined through identifying of As species in the soil. In this site, only particle size distribution and water content of soil can provide the initial means of screening for the potential use of soil washing.

Work Productivity Analysis of Sludge Suction Type Pavement Cutter Equipped with Scattered Dust Reduction Function (비산먼지 저감기능을 구비한 슬러지 흡입식 도로절단기의 작업생산성 분석)

  • Jeon Eunbi;Kim, Kyoontai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.3-13
    • /
    • 2023
  • The purpose of this study is to compare and analyze the performance and work productivity of wet type pavement cutters and sludge suction type pavement cutters (hereinafter referred to as automatic pavement cutters) developed to reduce scattering dust. We first investigated the development status of wet type manual pavement cutters that are mainly used in Korea and automatic pavement cutters, and analyzed the pavement cutting work in detail. And the standard cutting performance was derived by measuring the cutting time by depth by applying the two equipment to the test bed under the same conditions. However, there is a limitation that the data measured in the test bed does not reflect the various variables of the actual pavement cutting site. Therefore, in this study, data was collected through field surveys, and the correlation between cutting distance and time was analyzed, and then a model for calculating the productivity of pavement cutters was presented through simple regression analysis. As a result of comparative analysis of the values derived from the regression equation with the standard cutting performance derived from the test bed, the cutting performance derived through the regression equation showed a similar trend to the standard cutting performance. Finally, we verified the usability of the automated pavement cutter developed by qualitatively analyzing three tasks that are difficult to measure quantitatively but affect productivity.