Some surface blasting vibration was measured to determine site constants and vibration frequency was analyzed. The results are summarized as follows; 1) Design method to predict particle velocities was introduced using the logarithmic normal distribution characteristics of peak particle velocities. 2) Scaled distance diagram to determine limiting charge was presented. 3) Line fitness between particle velocity and scaled distance didn't depend on dominant component of vibration. Prevail fitness was in the order of transverese, peak, vertical and radial component. 4) Dominant component of particle velocity didn't related to drilling direction. Frequency was lowered as distance enlarged. Duration time of vibration was shortened as charge decreased.
Blasting vibrations of 3 quarries and 5 construction sites were measured and investigated with two reference data. Square and cubic root scaled distance were similar in fitness to peak particle velocity of individual blasting site, but the former is better fitted in total. It was suggested that the limit scaled distance for domestic surface blasting be 40kg/$\textrm{cm}^2$ for 10mm/s level and 60kg/$\textrm{cm}^2$ for 5mm/s level, which were lower than the OSM's regulation. Prevailing vibration components were in the order of radial, vertical and transverse directions. Prevailing vibration components were in the order of radial, vertical and transverse directons. Site factors K and m were 242 and -1.283 for all studied area, 357 and -1.348 for construction sites, 118 and -1.160 for quarries. Most prevailing frequency was in the range of 10~2Hz. Overlapping effect of delayed blasting vibrations were insignificant. Vibration history of delayed blasting was longer than simultaneous blasting, and it became longer as measuring distance increased. Wave form and predominant frequencies were more complicated for delayed blasting than instantaneous blasting. The influence of blasting scale and measuring distance were not significant to determine peak particle velocity equation.
Journal of the Earthquake Engineering Society of Korea
/
v.14
no.1
/
pp.11-23
/
2010
A sacrificial member with aluminum foam of excellent energy absorption capacity was proposed for the protection of significant structures. Parametric studies of explicit finite element analyses were performed to investigate the pressure mitigation of close-range air-blasts. The scaled distance of the blast had a range of Z=0.48~0.95 and an empirical blast load function was utilized. The analytical parameters of the aluminum foam were density, thickness and the existence of a cover sheet. Analytical results showed that the transmitted pressure can be controlled to have a similar level of yield values of the foam by using a foam with low density and higher thickness. As the blast load increased, the sacrificial member needed to have higher density and thickness. A cover sheet of the foam clearly showed its effect on the wider distribution of blast pressure. It is necessary to determine the design parameters of sacrificial foams considering different energy dissipation capacities according to the scaled distance.
In this study, the field tests were performed on V-cut, PLHBM 1 hole, PLHBM 2 hole in gneiss area in order to compare the effects of the vibration decay of a tunnel cut-hole according to the number of PLHBM holes with scaled distance. Based on the prediction equation of blasting vibration from the result of the tests, the decay rate of vibration were confirmed 21.8~61.1% using PLHBM 1 hole, 35.7~79.3% using PLHBM 2 hole for scaled distance within $10{\sim}100m/kg^{1/2}$ on the basis of V-cut PPV. As the scaled distance was increased, the effect of vibration decay was decreased. The effect of vibration decay of cut-hole for intial PLHBM 1~2 hole was significantly high.
Journal of Korean Tunnelling and Underground Space Association
/
v.5
no.3
/
pp.251-260
/
2003
Tunnel blasting has been performed with V-cut to investigate the characteristics. Blasting vibrations were measured at two directions, the proceed direction and side direction. Propagation characteristics were determined by regression analysis; square root scaled distance and cube root scaled distance with maximum charge per delay of the blast. Testing result, The cross point was 62m in the allowable vibration velocity of 3mm/sec and 46m in 5mm/sec. Also, vibration level with measuring point was highest and decayed fastest, adapting to cube root scaled distance, for the proceed direction on ground.
Journal of Korean Tunnelling and Underground Space Association
/
v.14
no.3
/
pp.231-246
/
2012
Recently, the construction of tunnel frequently involves neighboring weak ground conditions. In this case, the stabilized ground could be relaxed by the excavation of tunnel. This will create issues in terms of stability of tunnel. Major factors determining the stability of tunnel can be the direction (angle) of weak zone, the distance between tunnel and boundary of weak zone and so on. In this study, by quantifying the displacement and crack propagation during the excavation of tunnel constructed neighboring weak zone, the influence of the direction of weak zone and the distance between tunnel and boundary of weak zone on the mechanical behavior of tunnel is investigated. A series of experimental scaled model tests by changing the direction of weak zone and the distance between tunnel and boundary of weak zone, are performed and analyzed under the condition of homogeneous material. The results show that as the angle between ground surface and boundary of weak zone moves from horizontal to perpendicular plane, displacement near tunnel increases. An increased distance between tunnel and boundary of weak zone induces displacements near tunnel to decrease and stabilizes beyond a certain level of distance. These findings verify and extend the earlier studies quantitatively. Finally, an appropriate distance between tunnel and boundary of weak zone according to the angle of weak zone is justified. This fundamental insight provides the basis for a more rational design of tunnel neighboring weak ground conditions.
Most of roadway tunnels have been constructed in the form of parallel twin tunnel in Korea. If parallel twin tunnel does not have a sufficient separation distance between tunnels, the problem of tunnel stability can occur. Generally, it is reported that tunnels are not influenced by each other when a center distance between tunnels is two times longer than tunnel diameter under the complete elastic ground and five times under the soft ground. In this study, the scaled model tests of closely-spaced parallel twin tunnel using homogeneous material are performed and induced displacements are measured around the tunnel openings during excavation. The influence of separation distance between tunnels on the behavior of closely-spaced tunnel is investigated. The experimental results are expressed by the induced displacement vector and progress of crack during construction and at failure. The results show that based on the analysis of induced displacement at the crown during construction, the additional displacement of the preceding tunnel induced by the excavation of following tunnel decreases as the separation distance between twin tunnel increases until the center to center distance is two times of tunnel diameter. Beyond this point, however, the additional displacement has become stabilized.
In this paper, a hybrid scaled boundary finite element and finite volume method (SBFEM-FVM) is proposed for simulating hydraulic-fracture propagation in brittle concrete materials. As a semi-analytical method, the scaled boundary finite element method is introduced for modelling concrete crack propagation under both an external force and water pressure. The finite volume method is employed to model the water within the crack and consider the relationship between the water pressure and the crack opening distance. The cohesive crack model is used to analyse the non-linear fracture process zone. The numerical results are compared with experimental data, indicating that the F-CMOD curves and water pressure changes under different loading conditions are approximately the same. Different types of water pressure distributions are also studied with the proposed coupled model, and the results show that the internal water pressure distribution has an important influence on crack propagation.
Kim, Yongtae;Lee, Seunggyu;Kim, Jongchul;Ryu, Seunghwa
Structural Engineering and Mechanics
/
v.77
no.3
/
pp.305-314
/
2021
In order to reduce enormous cost of real-scale underwater explosion experiments on ships, the mechanical response of the ships have been analyzed by combining scaled-down experiments and Hopkinson's scaling law. However, the Hopkinson's scaling law is applicable only if all variables vary in an identical ratio; for example, thickness of ship, size of explosive, and distance between the explosive and the ship should vary with same ratio. Unfortunately, it is infeasible to meet such uniform scaling requirement because of environmental conditions and limitations in manufacturing scaled model systems. For the facile application of the scaling analysis, we propose a generalized scaling law that is applicable for non-uniform scaling cases in which different parts of the experiments are scaled in different ratios compared to the real-scale experiments. In order to establish such a generalized scaling law, we conducted a parametric study based on numerical simulations, and validated it with experiments and simulations. This study confirms that the initial peak value of response variables in a real-scale experiment can be predicted even when we perform a scaled experiment composed of different scaling ratios for each experimental variable.
Database community focuses on the similar music retrieval systems for music database when a humming query is given. One of the approaches is converting the midi data to time series, building their indices and performing the similarity search on them. Queries based on humming can be transformed to time series by using the known pitch detection algorithms. The recently suggested algorithm, scaled and warped matching, is based on dynamic time warping and uniform scaling. This paper proposes Humming BIRD(Humming Based sImilaR mini music retrieval system) using sliding window and center-aligned scaled and warped matching. Center-aligned scaled and warped matching is a mixed distance measure of center-aligned uniform scaling and time warping. The newly proposed measure gives tighter lower bound than previous ones which results in reduced search space. The empirical results show the superiority of this algorithm comparing the pruning power while it returns the same results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.