• 제목/요약/키워드: Scale of development projects

검색결과 386건 처리시간 0.038초

대규모 개발사업에서의 PFV 구성에 관한 연구 (A Study on the composition of PFV(project financing vehicle) used in large-scale development project)

  • 김은성;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.159-163
    • /
    • 2008
  • The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.

  • PDF

주요개발사업의 환경영향평가서 분석을 통한 사회경제항목평가의 문제점과 개선방안 (Analysis of Problems and Improvement of Environmental Impact Assessment in Social-Economic Items Based on 19 Major Large Scale Development Projects)

  • 이상돈
    • 환경영향평가
    • /
    • 제13권4호
    • /
    • pp.165-185
    • /
    • 2004
  • Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.

수변지역 소규모 개발사업의 유형별 환경평가 기준에 관한 연구 (Study on the Evaluation Criteria of Environment Assessment for the Various Type of Small-Scale Development Projects in the Riparian Areas)

  • 주용준;사공희
    • 한국습지학회지
    • /
    • 제18권3호
    • /
    • pp.218-225
    • /
    • 2016
  • 수변지역은 하천의 수질 및 수생태계의 보전과 수변경관의 훼손 방지 특히, 안정적인 상수원의 확보를 위하여 다양한 정책과 계획이 수립되어 왔다. 그럼에도 불구하고 상수원보호구역과 수변구역 등 특정지역을 제외한 수변지역은 소규모 개발사업이 무분별하게 입지하게 되면서 하천의 수질 및 경관을 훼손되고 있다. 본 연구에서는 사업유형별로 동 식물, 지형 지질, 경관, 수질 등의 측면에서 예상되는 환경영향을 분석하고, 환경적 영향 정도에 따라 3-12점까지의 환경점수를 부여하여 중점검토사업과 일반검토사업, 간이검토사업 등으로 구분하였다. 마지막으로 사업유형별로 예상되는 환경영향을 회피하거나 최소화할 수 있도록 평가항목별로 평가기준을 마련하여, 수변지역의 소규모 개발사업을 합리적으로 규제하여 친환경적 개발이 이루어질 수 있도록 하였다.

대규모 IT 프로젝트에서 학습기반 애자일 프레임워크 적용사례 연구 (A Case Study of Adapting Disciplined Agile Framework for Large-scale IT Projects)

  • 박희원;최진영
    • 정보과학회 컴퓨팅의 실제 논문지
    • /
    • 제23권7호
    • /
    • pp.424-427
    • /
    • 2017
  • 애자일 개발 방법론이 확산되면서 초기에 불가능하다고 여겨진 대규모 IT 프로젝트에도 애자일 개발 방법론을 도입하고자 하는 노력이 있으며 이에 대한 사례도 다수 소개되고 있다. 본 논문에서는 2개의 대표적인 엔터프라이즈 애자일 방법론을 비교하고, 엔터프라이즈 애자일 개발 방법론의 하나인 학습 기반 애자일 프레임워크(DAD, Disciplined Agile Delivery)를 적용한 사례를 소개한다. 유사한 개발 과제를 수행한 2개의 프로젝트 간의 비교를 통해 폭포수 방법론을 사용한 프로젝트와 학습기반 애자일 프레임워크를 사용한 프로젝트의 개발 생산성을 정량적으로 측정하여 비교하였다.

제주특별자치도 환경영향평가제도의 제도적 특징에 관한 고찰 (Institutional Features of Environmental Impact Assessment System in the Jeju Special Self-Governing Province)

  • 양순미;이기호;허철구
    • 한국환경과학회지
    • /
    • 제30권8호
    • /
    • pp.647-658
    • /
    • 2021
  • Jeju Special Self-Governing Province has implemented a self-governing environmental impact assessment system (Jeju-EIAS) in recognition of its autonomy. In this study, the institutional features of Jeju-EIAS were examined by analyzing the development projects whose consultation under Jeju-EIAS were completed from 1994 to 2019. The consultation procedure of Jeju-EIAS, such as the actual operation of Review Committee for Environmental Impact Assessment (EIA), the consent of the provincial council, and the regular follow-up activities for the implementation of EIA consultations, has been implemented differently from those of other metropolitan cities and provinces. Under Jeju-EIAS, types of development projects subject to consultation on EIA also take into account local conditions, and include the construction of aquarium basin and building. In addition, provisions concerning the scale of development projects is strengthened above the Korean Environmental Impact Assessment Act (EIA Act).

지방자치단체·LH 협력사업 도출을 통한 거버넌스 구축방안 : 제주특별자치도를 대상으로 (Establishment of governance through development of LH cooperation project with local government: Focusing on Jeju Area)

  • 이미홍;성장환;송영일
    • 토지주택연구
    • /
    • 제8권4호
    • /
    • pp.285-294
    • /
    • 2017
  • Recently, as the paradigm of regional development has been transformed into characterization, decentralization and cooperation, small and medium scale development is in the spotlight. In particular, as the transfer of planning authority to local governments accelerates, LH is in the process of seeking to transform itself into a system that is in line with local government demand. The purpose of this study is to elaborate the regional pending projects that meet the demand of the region. The Jeju Special Self-Governing Province is the area where land and housing prices have increased more than three times recently, which is the area of interest in recent years due to the various demand for development projects. Another objective is to establish a local government based on LH's system, it is aimed to derive a collaboration method with local government, province corporation and local researchers. The criteria for deriving the cooperation projects between the local government and LH are basically the ones that can be carried out by LH and future-oriented projects. The process of deriving has undergone the process of statutory planning, unscrupulous plan analysis, and consultation of experts' advisory committees. In order to derive the regional cooperation project, four criteria such as local uniqueness, future possibility, business promotion efficiency, and local cooperation project were set. Major projects of the Jeju Special Self-Governing Province are improvement of the surrounding traffic system, construction of the hinterland due to the construction of the second airport, and establishment of Cruise Port(Jeju Port, Seogwipo Port). The role of each entity in the implementation of regional cooperation projects is as follows. Local government should request subsidies for the projects in case of lack of budget support and secure them through competition with other regions. In addition, it should be responsible for the operation and management of the facility once it has been supported and completed smoothly. The Ministry of Land, Infrastructure and Transport affects each region through approval and subsidy of the development plan. After the development project is completed, it evaluates the development project through monitoring and plays a role of continuously improving the system. As a business operator, the provincial corporation will carry out small-scale projects including non-physical projects such as community participation. In the case of LH regional headquarters, the general manager of the region will establish a comprehensive business plan, secure development availability, and carry out large-scale growth promotion projects.

소규모 개발사업의 저영향개발(LID) 사전협의 제도 도입 연구 - 비용편익 분석을 중심으로 - (A Study on The Introduction of LID Prior Consultation for Small-Scale Development Projects - Focusing on Cost-Benefit Analysis -)

  • 지민규;사공희;주용준
    • 청정기술
    • /
    • 제26권2호
    • /
    • pp.151-157
    • /
    • 2020
  • 급격한 도시화는 국토의 불투수면을 증가시켜 도시형 홍수의 위험성을 가중시켜왔고, 지하수위의 저하, 수질오염물질 증가 등 환경재해 및 환경오염 문제를 유발시키고 있다. 국내에서는 이러한 환경적 영향을 최소화하고 개발 이전의 물순환 건전성을 유지하기 위해 저영향개발 기법을 도입하여 적용하고 있지만, 소규모 개발사업의 대부분은 강우유출량 관리의 법적 근거가 부재하여 사각지대에 놓여 있다. 이에 빗물의 표면 유출을 증가시키는 소규모 개발사업 또한 오염원인자 책임 원칙에 따라 저영향개발 시설의 적용을 의무화하는 것이 요구되며 이를 위해 물순환 회복 사전협의 제도를 도입하는 것이 필요하다. 본 연구는 소규모 개발사업의 저영향개발기법 도입을 가정하여 비용편익 분석을 중심으로 수행되었다. 비용·편익 분석에 필요한 전국 소규모 개발 대상사업의 규모 및 건수는 『건축법』에 따른 대지면적이 1,000 ㎡ 이상 이거나 건축연면적 1,500 ㎡ 이상의 건축물에 서울시의 실제 사전협의 통계자료를 적용하여 도출하였다. 피규제 기업·소상공인, 피규제 이외 기업·소상공인·일반국민 및 정부를 대상으로 소규모 개발사업의 저영향개발 시설물 설치에 따른 비용·편익을 분석한 결과, 경제성의 기준 값인 1보다 많이 낮은 것으로 확인되었으며 이는 대상사업의 규모 대비 시설물의 설치 비용이 높기 때문으로 사료된다. 하지만 저영향개발 시설의 설치에 따른 수환경 및 대기질 개선 등의 환경적 가치와 하수처리시설 운영비 절감 등의 공공성을 고려하면 향후 소규모 개발사업의 사전협의제도 도입은 필연적이다. 앞으로 소규모 개발사업의 사전협의 제도 도입과 함께 비용·편익을 개선하기 위해서는 지자체의 제도적, 재정적 지원이 적극적으로 요구된다.

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

대규모 소프트웨어 개발 사업에서의 품질 보증을 위한 개발방법론 (A Development Methodology for Quality Assurance System in Large-Scale Software Development Project)

  • 윤석환;박지은;신용백
    • 품질경영학회지
    • /
    • 제25권1호
    • /
    • pp.142-155
    • /
    • 1997
  • To successfully carry out large scale research projects while su, pp.rting quality assurance of research output, effective and systematic management through utilization of resources such as manpower, time and cost as well as engineering techniques such as component technology and design methodology is required. It is necessary to establish development methodology to su, pp.rt quality assurance. The development methodology covers the contents and procedures of the project, such as division of the project into independently executable units, allocation of resources including researchers, component technology, related know-how and equipment, deployment of research units and integration of the project at the end. In this paper we present systematic development methodology for quality assurance in large scale software development projects by analyzing the contents of the methodology a, pp.ied to the Gigabit Information-processing And Networking Technology development project(GIALT).

  • PDF

단지규모 개발사업의 지속가능성 확보를 위한 녹지 평가 모형 개발 (Development of Evaluation Model on Greenspace for Sustainability of Site-scale Development Projects)

  • 양병이;이관규
    • 한국조경학회지
    • /
    • 제28권2호
    • /
    • pp.97-107
    • /
    • 2000
  • This study aims to develop the model of evaluation on greenspace to increase the sustain ability of the planning and management for site-scale development projects. The results of this study can be summarized as follows: (1) The comprehensive principles of sustainable development projects were established, which include coexistence of man and nature, reflection of ecological principles, minimization of environmental pollution and damage, recycling and reuse of materials. (2) According to established principles, the evaluation criteria were classified into seven categories as follows: retention of ample greenspace, formation of greenspace as a habitat, species diversity of vegetation, consideration of indigenous plants, construction of green network, conservation of greenspace, and reuse of plant materials. (3) As a result of the analysis of questionnaire of experts, evaluation model was worked out with which we can evaluate environmental friendliness greenspace. And, the final evaluation indicators for greenspace are the rate of greeneries volume, securing habitat, indigenous plants, reuse of plant materials, and species diversity of vegetation, and the indicator of greenspace conservation.

  • PDF