• 제목/요약/키워드: Saving construction time

검색결과 147건 처리시간 0.025초

Cost-Effective Model for Energy Saving in Super-Tall Building

  • Song, Kwonsik;Park, Moonseo;Lee, Hyun-Soo;Kim, Sooyoung;Shin, Jinho
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.17-22
    • /
    • 2013
  • In many urban cities, super-tall buildings have been being constructed around New York and Chicago as the center since 1930 to improve the efficiency of land use and respond to new residential type. In terms of energy consumption, super-tall buildings are classified as a top energy consumption building. Also, as time passed, the degradation of energy performance occurs in super-tall buildings like general things so that these cannot show the initial performance planned in the design phase. Accordingly, building owners need to make a plan to apply energy saving measures to existing building during the operation phase. In order to select energy saving measures, calculus-based methods and enumerative schemes have been typically used. However, these methods are time-consuming and previous studies which used these methods have problems with not considering the initial construction cost. Consequently, this study proposes a model for selecting an optimal combination of energy saving measures which derives maximum energy saving within allowable cost using genetic algorithms. As a contribution of this research, it would be expected that a model is utilized as one of the decision-making tools during the planning stage for energy saving.

COST-EFFECTIVE MODEL FOR ENERGY SAVING IN SUPER-TALL BUILDING

  • Kwonsik Song;Moonseo Park;Hyun-Soo Lee;Sooyoung Kim;Jinho Shin
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.294-299
    • /
    • 2013
  • In many urban cities, super-tall buildings have been being constructed around New York and Chicago as the center since 1930 to improve the efficiency of land use and respond to new residential type. In terms of energy consumption, super-tall buildings are classified as a top energy consumption building. Also, as time passed, the degradation of energy performance occurs in super-tall buildings like general things so that these cannot show the initial performance planned in the design phase. Accordingly, building owners need to make a plan to apply energy saving measures to existing building during the operation phase. In order to select energy saving measures, calculus-based methods and enumerative schemes have been typically used. However, these methods are time-consuming and previous studies which used these methods have problems with not considering the initial construction cost. Consequently, this study proposes a model for selecting an optimal combination of energy saving measures which derives maximum energy saving within allowable cost using genetic algorithms. As a contribution of this research, it would be expected that a model is utilized as one of the decision-making tools during the planning stage for energy saving.

  • PDF

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

건축물에너지절약계획서의 사업계획승인, 건축허가에 따른 적용시점의 타당성 연구 (A Study on the Feasibility of the Timing for the Implementation of Energy-Saving Plan of Buildings Based on the Approval of Business Plan and Construction Permit)

  • 김대원;김영일;정광섭
    • 에너지공학
    • /
    • 제21권3호
    • /
    • pp.265-270
    • /
    • 2012
  • 에너지절약에 대한 규제가 심하고 국민 다수가 에너지절감에 대한 관심이 높은 상태에서 사업계획승인을 받은 건축물이 건축허가가 지연되어 주변 신규 사업건과 함께 입주된 지역에서 관리비가 20~30% 차이가 발생한다면 심각한 민원이 될 것이다. 따라서 사업계획승인 시점에 에너지절약계획서를 작성하되 주택법 시행령 제18조로 인한 공사착수가 연장이 되어 2년이 경과 되거나 지연 될 때에는 건축허가 시점에서 현 기준에 의한 에너지절약계획서를 적용하는 것이 국가 에너지계획이나 민원에 대한 미연에 방지책이 될 것이라 생각한다. 에너지절약계획서의 목적과 요소의 기술들이 그 기능을 다하지 못하고 단순히 인, 허가 수순에 지나지 않는다면 많은 인력을 투입하여 검토하고 자문하는 것이 무의미한 시간 손실일 것이다. 정부나 건축주가 에너지 save측면을 공감하고 건물에너지효율을 개선하여야 할 것이다.

사례분석을 통한 공동주택 골조공사의 원가절감 체크리스트 개발에 관한 연구 (A Study of the Development of Apartment's Structural Cost Saving Checklist through the Case Research)

  • 이경섭;서상욱
    • 한국건설관리학회논문집
    • /
    • 제11권6호
    • /
    • pp.65-77
    • /
    • 2010
  • 우리나라 건설 산업에서 주택분야가 차지하는 비중은 2007년 32%정도이며 그 중에서도 공동주택은 67%이상을 차지하고 있다. 수 년 전부터 시행되고 있는 분양가 상한제와 최근의 부동산 경기침체를 고려할 때 기업의 경쟁력확보와 저렴한 주택의 공급을 위해서 원가절감의 필요성은 점점 증대되고 있다. 본 연구에서는 공동주택 중에서도 공사비의 비중이 커서 원가절감 기대효과가 높고 품질과 공기에 미치는 영향 또한 가장 큰 철근콘크리트공사 분야에서 발생된 과거의 원가절감 사례를 분류체계에 따라 분류하고, 분류체계별 상관관계를 분석하여 제외(exclusion)와 통합(integration)의 과정을 거쳐 실무적으로 활용될 수 있고 향후 다른 연구의 기초자료가 될 수 있는 공동주택 철근콘크리트공사의 원가절감 체크리스트를 제시하고자 한다.

Sources of Cost Saving Opportunities in Highway Construction Quality Assurance Practices

  • Uddin, Mohammad Moin;Newland, James
    • Journal of Construction Engineering and Project Management
    • /
    • 제8권1호
    • /
    • pp.1-9
    • /
    • 2018
  • US transportation agencies are dealing with shrinking budgets, limited work forces, and deteriorating infrastructure. In order to cope with funding uncertainty, state highway agencies are now looking into their own organizations and identifying programs, practices, and processes that have potential for cost saving. A quality assurance (QA) program is an integral part of highway construction and ensures a project's contracted level of quality. The cost of quality (conforming and nonconforming) can constitute a sizable part of total construction cost. As the quality assurance programs evolved, various practices and processes were developed over time and later adopted by state highway agencies. These practices and processes include different QA standards and specifications, varying testing methods, central testing lab vs. on site testing, performance based vs. prescribed quality assurance practices, implementation of innovative quality assurance practices, etc. Therefore, there is an opportunity to assess different QA strategies and recommend those practices that are effective and cost efficient. A national survey was conducted by the authors, which provided a detailed mapping of various QA practices and processes used as part of QA programs and identified areas where agencies can focus on for cost savings. The survey found that QA sampling and testing plans, optimization of sampling plans, optimization of QA standards and specifications, and implementation of innovative test methods and processes are the main areas the agencies should focus to lean the current QA programs.

RFID Technology Applications with PMIS for Managing RMC Truck Operations

  • Kim, Seung-Ho;Kim, Sang-Yong
    • 한국건축시공학회지
    • /
    • 제11권5호
    • /
    • pp.468-481
    • /
    • 2011
  • This research presents a strategy and information system to manage the logistics of delivery ready mixed concrete (RMC) under the integrated environment of PMIS+RFID. PMIS is system tool and technique used in construction sectors to delivery information. Information that can be extracted electronically in real time is more valuable than data gathered and maintained manually. RFID technology can help to improve data accuracy through supply chains and by identifying products and objects at specific points through automatic identification. The objectives of these two implementations can be able to improve the efficiency of logistics management for RMC truck process, and to verify the technical and practical feasibility of PMIS+RFID application in construction industry. This may be realistic given the dynamics of daily activities on construction sites. This research is focused on examples on real world case study, applications and research theme related and connected to PMIS+RFID technology. It demonstrated that PMIS+RFID technology has been automatically implemented and has shown process information about the RMC truck and the overall status information about it, both quickly and accurately. As a result, the construction site where needs 300 $m^3$ pouring (50 RMC trucks) per day can be reduced total 250 minutes. Moreover, this time saving is related to the labour cost saving. From the case studies, RFID+PMIS system was proven in terms of effectiveness rather than current method.

직렬 연결구조의 유량균등분배 시스템 시공사례 (A Construction Case of Flow Equal Distribution System in Series Connection)

  • 정웅성;이성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.64-65
    • /
    • 2017
  • The existing hot and cold water supply system have a few problems such as construct ability, damage of the building, maintenance and the unequal distribution of water supply flow. So the system has needs to be improved and the Flow Equal Distribution System(FEDS) in series connection has been innovated by Idin Lab which relieve the existing problems. Thus, the purpose of this study is aimed to show the merits of FEDS with an real example of construction site of Wirye Terrace, D builder. 1. FEDS enables builders to save construction cost as the system in series connection does not need to equip both allotters and loop piping system. 2. FEDS contains a cartridge of water saving function so it mainly reduce the unequal distribution of flow and sudden temperature deviation of hot water supply at the same time. 3. FEDS allows repairer to maintain the water supply system at the same floor that could get rid of disharmony between dwellers who live the upper/lower story of the same building. Therefore, the FEDS will be applied when the building is remodeled and constructed.

  • PDF

서보모터를 이용한 유압 하이브리드식 사출성형기의 공정시간 및 절전효과에 관한 연구 (A Study on Cycle Time and Power Saving Effect of a Hydraulic Hybrid Injection Molding Machine using a Servo Motor)

  • 윤홍식;김성동
    • 드라이브 ㆍ 컨트롤
    • /
    • 제17권3호
    • /
    • pp.15-25
    • /
    • 2020
  • The cycle time and power saving effect of a hydraulic hybrid injection molding machine using a servo motor are considered in this paper. In order to verify control characteristics, such as pressure and speed, experiments were performed with the hydraulic hybrid injection molding machine, clamping force of 110 ton. The power consumption and production cycle time of a conventional hydraulic injection molding machine were measured to compare its performances with the hydraulic hybrid injection molding machine. An injection molding machine with a clamping force of 1300 ton was used as the conventional machine, the hybrid machine was implemented by replacing its induction motors with servo motors. In the remodeled hybrid machine, experiments were performed to investigate how the displacement of the mold clamping pump affects the power consumption and production cycle time. The results showed that the production cycle time of the hybrid injection molding is similar to a conventional hydraulic injection molding machine but with a significant energy saving of about 40%.

초고층 건물 공기단축을 위한 기둥철근 3개층 선조립공법에 관한 연구 (A Study on the Pre-fabrication of Three-story Column Re-bars for Saving Construction Time of High-rise Buildings)

  • 김광희;김재엽;서덕석;안성훈;최희복;정병원
    • KIEAE Journal
    • /
    • 제7권2호
    • /
    • pp.39-46
    • /
    • 2007
  • A high-rise building construction in Korea has some problems in engineering, construction and management technologies although the high-rise building construction is recently booming. In addition, the lack of skilled construction labors is increasing, so the development for methods is needed to reduce the labors by prefabrication and mechanization. A re-bar work is one of very important works with regard to cost and schedule management in the high-rise building construction. Nevertheless, the re-bar work has some problems that it is needed many re-bars for joints linking and much time for lifting due to high-rise buildings, and it is difficult to level the skill of labors. So, in this study, the pre-fabrication of three-story height in column re-bars is proposed and the results of an implementation are analyzed and explored by a case study. As the results of case study, the pre-fabrication of three-story heights in column re-bars could reduce the cost in the re-bar work and accelerate the time in the structural frame work. In addition, the pre-fabrication of three-story height in column re-bars could solve the problems such as the waste of many re-bars for joints linking, and the lack of the skilled labors.