• Title/Summary/Keyword: Safety protection system

Search Result 1,053, Processing Time 0.03 seconds

Research on Standards for Protection against Electric Shock in Global Technical Regulations of Fuel Cell Vehicle (연료전지 자동차 세계기술규정의 감전보호기준 연구)

  • HwangBo, Cheon;Lee, Kyu-Myong;You, Kyeong-Jun
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.21 no.3
    • /
    • pp.167-183
    • /
    • 2010
  • This paper analyzes the backgrounds of the standards for protection against electric shock in Global Technical Regulations (GTR) of Fuel Cell Vehicle (FCV). Targets on research were high voltage criteria, safety current, isolation and grounding resistance, time limitation, energy, adequate clearance, and test procedure. Based on human impedance and effect of current in IEC 60479-1, safety of human was examined. Then, isolation and grounding circuit model of FCV were analyzed theoretically. The results give several suggestions: touch voltage less than 25V, AC energy less than 0.0813J, separation considering middle finger length, grounding resistance less than $0.2\Omega$, maximum AC ground voltage of 1V (rms), and isolation resistance between earth and electrical chassis. In MATLAB/Simulink environment, error characteristics of isolation resistance measurement procedure using internal DC sources were analyzed under variations of internal resistance of voltmeter and isolation resistance.

Development of Strengthening Method and Safety Analysis of Ecological Block and Vegetation Bank Protection (식생블록옹벽의 구조적 안전성 해석과 보강설계기법 연구)

  • Oh, Byung-Hwan;Cho, In-Ho;Lee, Young-Saeng;Lee, Keun-Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.1
    • /
    • pp.207-215
    • /
    • 2003
  • Developed is a new environment-friendly concrete-block retaining wall system. The conventional analysis methods are not directly applicable because the proposed concrete-block wall system is made of by interlocking the blocks with shear keys. Therefore, the shear analysis as well as stability analysis have been conducted to secure the safety of block-wall system. Overall slope stability analysis was also performed. An appropriate strengthening method was developed to ensure the safety when the block-wall system is relatively high. The method of analysis for strengthening the concrete-block wall system was also proposed. The proposed environment-friendly concrete block retaining wall system shows reasonable safety and can be a good construction method for retaining walls and river bank walls.

Water-hammer in the Pump Pipeline System with and without an Air-Chamber (에어챔버 설치에 따른 펌프관로계의 수격현상)

  • Lee, Sun-Kon;Yang, Cheol-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.1
    • /
    • pp.1-7
    • /
    • 2011
  • When the pumps stopped in the operation by the power failure, the hydraulic transients take place in the sudden change of a velocity of pipe line. Each and every water hammer problem shows the critical stage to be greatly affected the facts of safety and reliability in case of power failure. The field tests of the water hammer executed at Cheong-Yang booster pump station having an air chamber. The effects were studied by both the practical experiments and the CFD(Computational Fluid Dynamics : Surge 2008). The result states that the system with water hammering protection equipment was much safer when power failure happens. The following data by a computational fluid dynamic analysis are to be shown below, securing the system stability and integrity. (1) With water hammering protection equipment. (1) Change of pressure : Up to $15.5\;kg/cm^2$ in contrary to estimating $16.88\;kg/cm^2$. (2) Change rate of water level : 52~33% in contrary to estimating 55~27%. (3) Note that the operational pressure of pump runs approx. 145 m, lowering 155 m of the regularity head of pump. (4) Note that the cycle of water hammering delays from 80 second to 100 second, together with easing the function of air value at the pneumatic lines. (2) Change of pressure without water hammering protection equipment : Approximate $22.86\;kg/cm^2$. The comprehensive result says that the computational fluid dynamics analysis would match well with the practical field-test. It was able to predict Max. or Min. water hammering time in a piping system. This study aims effectively to alleviate water hammering in a pipe line to be installed with air chamber at the pumping station and results in making the stability of pump system in the end.

Comparison of residue patterns between foliar application and drenching in export strawberry (경엽 및 관주 처리에 따른 딸기 중 침투성 농약 잔류패턴 비교)

  • Lee, Hyo-Sub;Hong, Su-Myeong;Kwon, Hye-Young;Kim, Dan-bi;Moon, Byeong-Chul
    • Journal of Applied Biological Chemistry
    • /
    • v.60 no.4
    • /
    • pp.313-319
    • /
    • 2017
  • Strawberries are one of the main commodities in Korea and have been exported over 30 million dollar. And the safety has recently become an important issue in the agro-trade, pesticide residue is most important matter of safe agricultural products. As strawberries can be cultivated using elevated production system, so it is possible to use the drenching. When spraying the pesticides, the use of drenching can be lower amount of residual than using foliar treatment. In this study, time sequential residual amount of pesticides were compared between drenching and foliar application in strawberries. Pesticides were treated with the standard and double dosage and samples were collected at 0, 3, 6, 9, 13, 16 and 21 day and analyzed by LC and LC-MS/MS after liquid-liquid extraction and QuEChERS. Two pesticides were detected less than 1 mg/kg in all samples for drenching treatment. Carbendazim residues in drenching treatment were 5 to 25 times lower than foliar application. And azoxystrobin was not detected in strawberries of drenching treatment.

Study to Analyze the Grounding System in the 20 kHz Power Installation (20 kHz 전력설비 접지시스템 분석에 관한 연구)

  • Jung, Jin-Soo;Han, Woon-Ki;Park, Chan-Urm;Song, Young-Sang;Lim, Hyun-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.9
    • /
    • pp.1308-1312
    • /
    • 2013
  • In this paper, carried out for optimal ground system for ensuring safety for electricity used to power equipment in the 20 kHz frequency. Now the grounding system of the mesh electrode, electrode rods are installed for power plant safety and protection against electric shock. However, the electrical equipment grounding system in the 20 kHz were considering the increasing grounding impedance due to the high frequency and the magnetic shielding. But until now, there has been little research on the grounding system. To solve this problem, In this paper was proposed optimal grounding system due to the experiment using a mesh electrode, rod electrode, aluminum plate electrodes. Measurement results, grounding resistance was depending on the material of the electrode grounding resistance. In addition, the leakage current (induced) appeared to be affected depending on the type of electrode.

Design of Integrated Smart Fire Protection System for Rack Storage (랙크식 창고 통합 스마트 화재대응 시스템 설계)

  • Kim, Jong-Hoon
    • Fire Science and Engineering
    • /
    • v.34 no.1
    • /
    • pp.26-36
    • /
    • 2020
  • It is very difficult to suppress fire by rapid flame spread through flue space between flammable commodities on the rack when a fire occurs in the rack storage. At present, the fire protection system for rack storage in Korea has many issues, and the new fire protection system was designed and developed by it. A smart system using the sensor network and artificial intelligence was designed to detect fire very rapidly and track the location of a fire. In the very early stages, the system was constructed using vertical open sprinkler pipes, wet pipes, and solenoid valves to allow water to spray near fire locations. Based on the design results, the system was installed and tested, and the full-scale test was successfully completed.

Fire test procedures for flammability of bulkhead, ceiling and deck finish materials (선박의 격벽, 천정, 내장재 및 표면바닥재의 화재안정성 평가방법)

  • Kim, S.Y.;Kim, D.S.;Ahn, B.H.;No, H.S.
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2007.05a
    • /
    • pp.157-159
    • /
    • 2007
  • It is very important to protect life, property at sea from any fire. Recommendation on improved fire test procedures for surface flammability of bulkhead ceiling and deck finish materials specifies a procedure for measuring fire characterizing their flammability and thus their suitability for use in marine construction. In this paper we investigated the positive expected by fire test procedures for flammability of bulkhead ceiling and deck finish materials. Also, unusual materials were analyzed. Finally, we suggest methods to solve several problems related to unusual materials.

  • PDF

Description on assessment system of bed mattress's fire safety in real scale (침대 매트리스 실규모 화재안전 평가시스템 기술)

  • Park, Kye-Won;Jeong, Jae-Gun
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2012.04a
    • /
    • pp.329-332
    • /
    • 2012
  • This study focuses on the establishment of bed mattress fire test in real scale where it explains the burner heat supply, test procedure and test report in detail. Especially burner system is dealt in importance for bed mattress test in real scale due to simulating in bedding component by burner heat out-put.

  • PDF

IDENTIFICATION OF SAFETY CONTROLS FOR ENGINEERING-SCALE PYROPROCESS FACILITY

  • MOON, SEONG-IN;SEO, SEOK-JUN;CHONG, WON-MYUNG;YOU, GIL-SUNG;KU, JEONG-HOE;KIM, HO-DONG
    • Nuclear Engineering and Technology
    • /
    • v.47 no.7
    • /
    • pp.915-923
    • /
    • 2015
  • Pyroprocess technology has been considered as a fuel cycle option to solve the spent fuel accumulation problems in Korea. The Korea Atomic Energy Research Institute, Daejeon, Korea has been studying pyroprocess technology, and the conceptual design of an engineering-scale pyroprocess facility, called the Reference Engineering-scale Pyroprocess Facility, has been performed on the basis of a 10 ton heavy metal throughput per year. In this paper the concept of Reference Engineering-scale Pyroprocess Facility is introduced along with its safety requirements for the protection of facility workers, collocated workers, the off-site public, and the environment. For the identification of safety structures, systems, and components and/or administrative controls, the following activities were conducted: (1) identifying hazards associated with operations; (2) identifying potential events associated with these hazards; and (3) identifying the potential preventive and/or mitigative controls that reduce the risk associated with these accident events. This study will be used to perform a safety evaluation for accidents involving any of the hazards identified, and to establish safety design policies and propose a more definite safety design.