• 제목/요약/키워드: Safety injection

검색결과 694건 처리시간 0.024초

Comparative Experiments to Assess the Effects of Accumulator Nitrogen Injection on Passive Core Cooling During Small Break LOCA

  • Li, Yuquan;Hao, Botao;Zhong, Jia;Wang, Nan
    • Nuclear Engineering and Technology
    • /
    • 제49권1호
    • /
    • pp.54-70
    • /
    • 2017
  • The accumulator is a passive safety injection device for emergency core cooling systems. As an important safety feature for providing a high-speed injection flow to the core by compressed nitrogen gas pressure during a loss-of-coolant accident (LOCA), the accumulator injects its precharged nitrogen into the system after its coolant has been emptied. Attention has been drawn to the possible negative effects caused by such a nitrogen injection in passive safety nuclear power plants. Although some experimental work on the nitrogen injection has been done, there have been no comparative tests in which the effects on the system responses and the core safety have been clearly assessed. In this study, a new thermal hydraulic integral test facility-the advanced core-cooling mechanism experiment (ACME)-was designed and constructed to support the CAP1400 safety review. The ACME test facility was used to study the nitrogen injection effects on the system responses to the small break loss-of-coolant accident LOCA (SBLOCA) transient. Two comparison test groups-a 2-inch cold leg break and a double-ended direct-vessel-injection (DEDVI) line break-were conducted. Each group consists of a nitrogen injection test and a nitrogen isolation comparison test with the same break conditions. To assess the nitrogen injection effects, the experimental data that are representative of the system responses and the core safety were compared and analyzed. The results of the comparison show that the effects of nitrogen injection on system responses and core safety are significantly different between the 2-inch and DEDVI breaks. The mechanisms of the different effects on the transient were also investigated. The amount of nitrogen injected, along with its heat absorption, was likewise evaluated in order to assess its effect on the system depressurization process. The results of the comparison and analyses in this study are important for recognizing and understanding the potential negative effects on the passive core cooling performance caused by nitrogen injection during the SBLOCA transient.

실시간 객체를 이용한 원자력 발전소 Safety Injection System의 Modeling 및 실시간 시뮬레이션 (Real-Time Simulation and Modeling of Nuclear Power Plant Safety Injection Model using Real-Time Object)

  • 정영국;김정국;박용우;김문희
    • 한국정보과학회:학술대회논문집
    • /
    • 한국정보과학회 1998년도 가을 학술발표논문집 Vol.25 No.2 (1)
    • /
    • pp.487-489
    • /
    • 1998
  • 원자력 발전소와 같이 환경적으로 큰 재난을 가져 올 수 있는 시스템에서는 전체 시스템을 구축하기 전에 구축하고자 하는 시스템의 안전성을 보장할 수 있는지의 여부와 그러한 시스템의 조작자들의 훈련을 위해 실시간 시뮬레이션이 반드시 필요하다. 본 논문에서는 원자력 발전소의 SIS(Safety Injection System)를 실시간 객체 TMO(Time-triggered Message Triggered Model)를 이용 모델링하는 기법과, 분산 실시간 객체 플랫폼인 WTMOS위에서 구현된 SIS 시뮬레이션 시스템에 대해 기술하였다.

Gravity-Injection Core Cooling After a Loss-of-SDC Event n the YGN Units 3 & 4

  • Seul, Kwang-Woo;Bang, Young-Seok;Kim, Hho-Jung
    • Nuclear Engineering and Technology
    • /
    • 제31권5호
    • /
    • pp.476-485
    • /
    • 1999
  • In order to evaluate the gravity-injection capability to maintain core cooling after a loss-of-shutdown-cooling event during shutdown operation, the plant conditions of the Yong Gwang Units 3&4 were reviewed. The six cases of possible gravity-injection paths from the refueling water tank (RWT) were identified and the thermal-hydraulic analyses were performed using the RELAP5/MOD3.2 code. The core cooling capability was significantly dependent on the gravity-injection path, the RCS opening, and the injection rate. In the cases with the pressurizer manway opening higher than the RWT water level, the coolant was held up in the pressurizer and the system pressure continued increasing after gravity-injection. The gravity injection eventually stopped due to the high system pressure and the core was uncovered. In the cases with the injection path and opening on the same leg side, the core cooling was dependent on whether the water injected from the RWT passed the core region or not. However, in the cases with the injection path and opening on the different leg side, the system was well depressurized after gravity-injection and the core boiling was successfully prevented for a long-term transient. In addition, from the sensitivity study on the gravity-injection flow rate, it was found that about 54 kg/s of injection rate was required to maintain the core cooling and the core cooling could be provided for about 10.6 hours after event with that injection rate from the RWT. Those analysis results would provide useful information to operators coping with the event.

  • PDF

Application of Reliability Centered Maintenance Strategy to Safety Injection System for APR1400

  • Rezk, Osama;Jung, JaeCheon;Lee, YongKwan
    • 시스템엔지니어링학술지
    • /
    • 제12권1호
    • /
    • pp.41-58
    • /
    • 2016
  • Reliability Centered Maintenance (RCM) introduces a systematic method and decision logic tree for utilizing previous operating experience focused on reliability and optimization of maintenance activities. In this paper RCM methodology is applied on safety injection system for APR-1400. Functional Failure Mode Effects and Criticality Analysis (FME&CA) are applied to evaluate the failure modes and the effect on the component, system and plant. Logic Tree Analysis (LTA) is used to determine the optimum maintenance tasks. The results show that increasing the condition based maintenance will reduce component failure and improve reliability and availability of the system. Also the extension of the surveillance test interval of Safety Injection Pumps (SIPs) would lead to an improved pump's availability, eliminate the unnecessary maintenance tasks and this will optimize maintenance activities.

DETAILED EVALUATION OF THE IN-VESSEL SEVERE ACCIDENT MANAGEMENT STRATEGY FOR SBLOCA USING SCDAP/RELAP5

  • Park, Rae-Joon;Hong, Seong-Wan;Kim, Sang-Baik;Kim, hee-Dong
    • Nuclear Engineering and Technology
    • /
    • 제41권7호
    • /
    • pp.921-928
    • /
    • 2009
  • As part of an evaluation for an in-vessel severe accident management strategy, a coolant injection into the reactor vessel under depressurization of the reactor coolant system (RCS) has been evaluated in detail using the SCDAP/RELAP5 computer code. A high-pressure sequence of a small break loss of coolant accident (SBLOCA) has been analyzed in the Optimized Power Reactor (OPR) 1000. The SCDAP/RELAP5 results have shown that safety injection timing and capacity with RCS depressurization timing and capacity are very effective on the reactor vessel failure during a severe accident. Only one train operation of the high pressure safety injection (HPSI) for 30,000 seconds with RCS depressurization prevents failure of the reactor vessel. In this case, the operation of only the low pressure safety injection (LPSI) without a HPSI does not prevent failure of the reactor vessel.

복합안전주입탱크(Hybrid SIT) 설계개념 (Design Concept of Hybrid SIT)

  • 권태순;어동진;김기환
    • 한국유체기계학회 논문집
    • /
    • 제17권6호
    • /
    • pp.104-108
    • /
    • 2014
  • The recent Fukushima nuclear power plant accidents shows that the core make up at high RCS pressure condition is very important to prevent core melting. The core make up flow at high pressure condition should be driven by gravity force or passive forces because the AC-powered safety features are not available during a Station Black Out (SBO) accident. The reactor Coolant System (RCS) mass inventory is continuously decreased by releasing steam through the pressurizer safety valves after reactor trip during a SBO accident. The core will be melted down within 2~3 hours without core make up action by active or passive mode. In the new design concept of a Hybrid Safety Injection Tank (Hybrid SIT) both for low and high RCS pressure conditions, the low pressure nitrogen gas serves as a charging pressure for a LBLOCA injection mode, while the PZR high pressure steam provides an equalizing pressure for a high pressure injection mode such as a SBO accident. After the pressure equalizing process by battery driven initiation valve at a high pressure SBO condition, the Hybrid SIT injection water will be passively injected into the reactor downcomer by gravity head. The SBO simulation by MARS code show that the core makeup injection flow through the Hybrid SIT continued up to the SIT empty condition, and the core heatup is delayed as much.

충전/안전주입 펌프 순환배관의 안전주입신호 제거에 따른 원자력 5,6,7,8 호기의 고압안전주입계통의 신뢰도 분석 (A Reliability Analysis of HHSIS of KNU 5,6,7 and 8 Following the Removal of s-signal from Charging/safety Injection Pump Mini-flow Line Valves)

  • Chung, Dae-Wook;Chung, Chang-Hyun;Kang, Chang-Soon
    • Nuclear Engineering and Technology
    • /
    • 제20권1호
    • /
    • pp.47-53
    • /
    • 1988
  • 본 연구의 목적은 충전/안전주입 펌프 최소순환관으로부터 안전주입신호(s-신호)를제거 함에 따른 원자력 5,6,7,8호기의 고압안전주입계통(HHSIS)의 신뢰도를 분석, 평가하는 것이다. 계산은 s-신호를 제거한 경우와 제거하지 않은 경우에 대하여 각각 수행되었다. 각 경우에 대하여 s-신호 발생시 고압안전주입계통의 이용불능도와 충전/안전주입 펌프의 파손확률이 계산되었다. 계산결과에 따르면, s-신호를 제거함에 따라 고압안전주입계통의 이용불능도는 미세하게 증가하였으며 반면에 충전/안전주입 펌프의 파손확률은 크게 감소하였다. 따라서 여러가지 측면에서 충전/안전주입 펌프의 최소순환관으로부터 s-신호를 제거하고 운전하는 것이 합당하다는 것이 밝혀졌으며, 고압안전주입계통의 이용불능도를 줄이기 위하여 운전절차를 개선하고 운전원의 훈련 및 교육을 강화할 것을 추천한다.

  • PDF

Modeling of coupled liquid-gas-solid three-phase processes due to fluid injection

  • Zang, Yong-Ge;Sun, Dong-Mei;Feng, Ping;Stephan, Semprich
    • Geomechanics and Engineering
    • /
    • 제13권1호
    • /
    • pp.1-23
    • /
    • 2017
  • A coupled liquid-gas-solid three-phase model, linking two numerical codes (TOUGH2/EOS3 and $FLAC^{3D}$), was firstly established and validated by simulating an in-situ air flow test in Essen. Then the coupled model was employed to investigate responses of multiphase flow and soil skeleton deformation to compressed air or freshwater injection using the same simulation conditions in an aquifer of Tianjin, China. The simulation results show that with injecting pressurized fluids, the vertical effective stress in some area decreases owing to the pore pressure increasing, an expansion of soil skeleton appears, and land uplift occurs due to support actions from lower deformed soils. After fluids injection stops, soil deformation decreases overall due to injecting fluids dissipating. With the same applied pressure, changes in multiphase flow and geo-mechanical deformation caused by compressed air injection are relatively greater than those by freshwater injection. Furthermore, the expansion of soil skeleton induced by compressed air injection transfers upward and laterally continuously with time, while during and after freshwater injection, this expansion reaches rapidly a quasi-steady state. These differences induced by two fluids injection are mainly because air could spread upward and laterally easily for its lower density and phase state transition appears for compressed air injection.

SMART-ITL 1 계열 피동안전계통을 이용한 안전주입배관 파단 소형냉각재상실사고 모의에 대한 실험적 연구 (Experimental Study of SBLOCA Simulation of Safety-Injection Line Break with Single Train Passive Safety System of SMART-ITL)

  • 류성욱;배황;유효봉;변선준;김우식;신용철;이성재;박현식
    • 대한기계학회논문집B
    • /
    • 제40권3호
    • /
    • pp.165-172
    • /
    • 2016
  • 노심보충탱크(Core Makeup Tank, CMT), 안전주입탱크(SafetyInjection Tank, SIT)와 자동감압계통(Auto Depressurization System, ADS)로 구성된 1 계열의 SMART 피동안전주입계통의 주입특성을 파악하기 위한 소형냉각재상실사고(SBLOCA) 모의에 대한 실험적 연구가 수행되었다. SBLOCA의시험은 0.4 인치 안전주입수 배관파단에 대해 수행되었으며, 정상상태 조건은 실험요건서에 제시된 시험 초기 조건을 만족시키도록 746초 동안 운전되었다. 노심 출력 및 안전주입 유량 등의 경계 조건도 적절히 모의되었으며, 안전주입계통 배관에서의 파단, 히터 트립 및 잔열곡선 인가, 원자로냉각재펌프 관성서행(Coastdown), 급수 중단, CMT 및 SIT의 주입, ADS #1 개방이 SBLOCA 시나리오에 따라 적절히 모의되었다. 노심지지원통 내부의 액체환산수위는 파단 초반에 감소하다가 CMT와 SIT가 주입되면서 서서히 회복되었으며, 피동안전주입계통의 주입유량이 노심 수위를 회복하기에 충분한 것으로 판단할 수 있다.

피동충수용 혼합형 안전주입탱크의 압력평형에 관한 이론적 해석 및 시험적 연구 (Study on the Pressure Balance of the Hybrid Safety Injection Tank)

  • 류성욱;유효봉;변선준;전우진;박현식;이성재
    • 에너지공학
    • /
    • 제25권1호
    • /
    • pp.185-191
    • /
    • 2016
  • 피동충수용 혼합형 안전주입탱크는 한국원자력연구원에서 제안한 원자력 피동안전계통의 한 종류로, 안전주입탱크의 상부와 가압기를 연결하여 모든 운전압력 조건에서 냉각수 주입이 가능하도록 개선한 시스템이다. 본 연구에서는 피동충수용 혼합형 안전주입탱크, 가압기와 원자력압력용기에 대한 압력 네트워크를 통해 피동충수용 혼합형 안전주입탱크와 가압기의 압력이 평형이 되는 조건을 이론적으로 도출하였으며, 개별효과시험장치를 이용하여 안전주입탱크에서 발생하는 다양한 열수력 현상(증기응축 및 열혼합 현상)들을 파악하였다.