• Title/Summary/Keyword: Safety ground

Search Result 1,834, Processing Time 0.027 seconds

A Study on Characteristics and Dynamic Response Spectrum of Near Fault Ground Motions (근거리지진의 특성과 동적응답스펙트럼에 관한 연구)

  • Bang, Myung-Seok;Han, Sung-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.3 s.71
    • /
    • pp.143-151
    • /
    • 2005
  • In this study, it is demonstrated that how the effect of the Near Fault Ground Motion affects the response of the structure. Considering the general characteristic of Near Fault Ground Motion the characteristics of Near Fault Ground Motions is analysed by elastic response spectrums, and the inelastic response spectrum is evaluated with the ductility and the yield strength to consider the inelastic behavior which couldn't be simulated through the elastic response spectrum. The result of this study shows that the effect of Near Fault Ground Motion should be considered in the long period range of long span structures but the domestic seismic design code was developed based on Far Fault Ground Motions, so the effects of Near Fault Ground Motions, which is very serious especially in large structures with a long period, are not considered. Therefore, the effect of the Near Fault Ground Motion has to be examined especially in the seismic performance evaluation of long period structure.

A Study on Stress Assessment of Standing Gas Pipeline Subjected to Ground-Subsidence (지반 침하를 고려한 도시가스 입상배관의 응력평가)

  • Kil, Seong-Hee;Kim, Byung-Duk;Kwon, Jeong-Rock;Yoon, Kee-Bong
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.2
    • /
    • pp.1-8
    • /
    • 2013
  • In this study, 120 cases of damage due to ground subsidence of city gas pipeline which is hanging on apartment outer wall were investigated. From the survey results, it was determined to be approximately 100m~200mm ground subsidence occurred and at severe damage, pipeline was cut and the gap was about 50mm between two cut pipeline. Device for measuring the amount of deformation of standing gas pipeline was designed and fabricated. And installed it on apartment outer wall for measuring the deformation due to ground subsidence, after 5 months measurement the amount of ground subsidence was measured to 1.3mm. Stress assessment was conducted based on results of ground subsidence occurred on standing gas pipeline.

Study of Influence Factors for Prediction of Ground Subsidence Risk

  • Park, Jin Young;Jang, Eugene;Ihm, Myeong Hyeok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.10 no.1
    • /
    • pp.29-34
    • /
    • 2017
  • This Analyzed case study of measuring displacement, implemented laboratory investigation, and in-situ testing in order to interpret ground subsidence risk rating by excavation work. Since geological features of each country are different, it is necessary to objectify or classify quantitatively ground subsidence risk evaluation in accordance with Korean ground character. Induced main factor that could be evaluated and used to predicted ground subsidence risk through literature investigation and analysis study on research trend related to the ground subsidence. Major factors of ground subsidence might be classified by geological features as overburden, boundary surface of ground, soil, rock and water. These factors affect each other differently in accordance with type of ground that's classified soil, rock, or complex. Then rock could be classified including limestone element or not, also in case of the latter it might be classified whether brittle shear zone or not.

LiDAR based Real-time Ground Segmentation Algorithm for Autonomous Driving (자율주행을 위한 라이다 기반의 실시간 그라운드 세그멘테이션 알고리즘)

  • Lee, Ayoung;Yi, Kyongsu
    • Journal of Auto-vehicle Safety Association
    • /
    • v.14 no.2
    • /
    • pp.51-56
    • /
    • 2022
  • This paper presents an Ground Segmentation algorithm to eliminate unnecessary Lidar Point Cloud Data (PCD) in an autonomous driving system. We consider Random Sample Consensus (Ransac) Algorithm to process lidar ground data. Ransac designates inlier and outlier to erase ground point cloud and classified PCD into two parts. Test results show removal of PCD from ground area by distinguishing inlier and outlier. The paper validates ground rejection algorithm in real time calculating the number of objects recognized by ground data compared to lidar raw data and ground segmented data based on the z-axis. Ground Segmentation is simulated by Robot Operating System (ROS) and an analysis of autonomous driving data is constructed by Matlab. The proposed algorithm can enhance performance of autonomous driving as misrecognizing circumstances are reduced.

A Study on the Possibility of Electrical Fires due to the Short Circuit and Ground Fault of Power Cable Supported by an Iron Fence (철제펜스로 지지된 동력배선의 단락.지락에 의한 전기화재 발생 개연성 연구)

  • Kim, Jeong-Hun;Park, Byoung-Ki;Song, Jong-Hyeok;Jung, Ki-Chang
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.6
    • /
    • pp.41-45
    • /
    • 2007
  • Short circuit and ground fault account for the primary causes of electrical fires. In this research, real-scale experiments were conducted to assess the possibility of electrical fires due to these causes. The experiment conditions were identical with an actual fire accident, in which the power cable was supported by an iron fence. The purposes of this research are to investigate the short circuit caused by wire cutting, the conductivity of the iron fence depending on its coating conditions, and the ground fault of one wire or two wires in an effort to reconstruct the fire accident. The test results show that, owing to the instant operation of circuit breaker in the moment of short circuit or ground fault, the generated ignition energy is far less than necessary to start an ignition. Therefore it is concluded that electrical fire is highly unlikely if the electric system is protected by a circuit breaker with normal functions.

Feedback Analysis for Tunnel Safety using displacements measured during the tunnel excavation (터널굴착에 의한 변위계측값을 활용한 역해석 기법 연구)

  • Park, Si-Hyun;Song, Won-Gen;Oh, Young-Seok;Shin, Yong-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.199-204
    • /
    • 2007
  • This research aimed at to develop a quantitative assesment technique which uses the measured displacements at the excavated plane during tunnel construction. Tunnel structure has a feature with long extents comparing to the excavated section so that the tunnel safety assesment is more effective by using the measured data of displacements. Tunnel structures show different structural behaviors due to the mechanical characteristics of ground and supports themselves, excavation methods and construction methods of supports, etc. From this point of view, it has very important meanings on the practical aspects that the measured data from the construction cite represent the features of the interaction effects between ground and supports as they are. In this study, both the stress state and the properties of surrounding ground are analyzed by newly incorporated feedback analysis technique which can use the measured displacements directly. Then, the stress state and the properties of ground will be used to obtain the strain distribution of surrounding ground. Finally the tunnel safety can be assessed by comparing the estimated strain through the analysis to the allowable strain of ground quantitatively.

  • PDF

Analysis of Risk Voltage for Grounding Electrode by Injection of Earth Leakage Current

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Kim, Dong-Ook;Lee, Ki-Yeon;Moon, Hyun-Wook;Kim, Hyang-Kon;Kil, Gyung-Suk
    • International Journal of Safety
    • /
    • v.8 no.2
    • /
    • pp.9-14
    • /
    • 2009
  • This paper describes analysis of risk voltage for grounding electrode where earth leakage current is injected. To assess risk voltage of grounding electrode, the grounding simulator and CDEGS program were used to obtain measured data and theoretical results of this study. The grounding simulator was composed of a hemispherical water tank, AC power supply, a movable potentiometer, and test grounding electrodes. The shapes of grounding electrode model was ground rod. The potential rise was measured by grounding simulator, and the touch and step voltages were computed by CDEGS program. As a consequence, the potential rise of ground rod abruptly decreases with increasing the distance from the grounding electrode to the point to be tested. The touch voltage above the ground rod was low, but the step voltage was high. The measured results were compared with the computer calculated data and were known in good agreement.

Development and Its Characterization of Earth Plate for Early Streamer Discharge (조기방전용 접지판의 개발 및 특성)

  • Choi, Sang-Won;Her, Yong
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.46-48
    • /
    • 2014
  • This paper compared and demonstrated the performance of the earth plate for conventional type and early streamer discharging type developed a new plate in order to improve the performance of the ground plate for use in grounding. The results obtained are shown below; early streamer discharge earth plate was high 5 kV on DC flashover voltage and corona discharge current was higher than about 2 times under the same test conditions compared to the conventional earth plate. From the experiential result, streamer discharge earth plate had a function of rapid inflow/out flow than the general ground plane because of by corona discharge current to be generated in the sharp serrated in formed the ground plane when strike current occurred. In the future, the newly developed early streamer discharge ground plate would be beneficial for grounding work to be widely used to promote the convenience and economy of construction.

Analysis of Stresses on Buried Natural Gas Pipeline Subjected to Ground Subsidence (매설 천연가스배관의 지반침하에 의한 응력 분석)

  • 김형식;김우식;방인완;오규환;홍성호
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.2
    • /
    • pp.54-64
    • /
    • 1998
  • This study was initiated to examine the stress and deformation characteristics of the pipelines which were subjected to various environmental conditions in order to confirm their integrity. As the part of them, this paper presents the analysis results for the effect of ground subsidence combined with main loads on buried natural gas pipelines. The ground subsidence which can occur for buried gas pipeline has been classified to the three cases. Finite element method was used to analyze the effect of ground subsidences on pipeline of 26 inch(0.660 m) and 30 inch(0.762 m) diameter used as high pressure ($70 kg_f/cm^2(6.86 MPa)$) main pipelines of KOGAS. This paper shows the result of stress analysis for the pipelines subjected to those three case ground subsidence. Comparing these results with safety criterion of KOGAS(0.9 $\sigma_y$), maximum allowable settlement and loads have been calculated.

  • PDF

Safety Evaluation of the Settlement Amount of the Bridge Earthwork Transition Area Using the Ground Penetrating Radar in the Soft Ground Section (연약지반 구간에서 지표투과레이더 활용한 교량 접속부 침하량 안전 평가)

  • Jung, Gukyoung;Jo, Youngkyun;Kim, Sungrae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.17-22
    • /
    • 2022
  • To reduce the bump of bridge/earthwork transition area caused by the settlement of the soft ground during public use, the road agencies have been continuously overlay or repavement at those areas. In this study, the vehicle-mounted ground penetrating radar with 1GHz air-coupled antenna was used to estimate the settlement amount of those areas for nine bridges built in the soft ground. Results shows that it is possible to effectively measure the thickness of pavement up to a depth of 1 m on an asphalt road with ground penetrating radar technology that can inspect under the road surface. Distinctively deformation of the road surface, the variation in the thickness of the pavement measured at bridge/earth transition areas is equivalent to a minimum of 50 mm and a maximum of 600 mm, and there is a risk of cavity in the ground. The difference in the increased pavement thickness is 50~250 mm for each bridge connection, which may cause the differential settlement. In this study, by using the result of the ground penetration radar, a plan for improving drivability and maintenance of the settlement is suggested and applied to the field.