• Title/Summary/Keyword: Safety grade system

Search Result 162, Processing Time 0.025 seconds

A Study on Improvement of Safety Management of Low Voltage Electrical Equiment (일반용 저압전기설비의 안전등급제 도입에 관한 연구)

  • Jae-Phil Han;Yong-Sung Choi
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.36 no.6
    • /
    • pp.598-602
    • /
    • 2023
  • With the purpose of instilling an awareness of the safety of users of electrical equipment and inducing voluntary facility improvement through the safety rating system for general low voltage electrical equipment, simulation and field application of the safety rating of general low voltage electrical equipment were conducted. For the introduction and application of the safety rating system for general low-voltage electrical equipment, data related to domestic safety was investigated and analyzed, cases of introduction in other fields were reviewed, and for design, the 4M risk assessment method of the Korea Occupational Safety and Health Agency and the cases of safety index development in Korea were analyzed and standardized. Safety rating system simulations were conducted for general low-voltage electrical equipment, and problem improvement measures were prepared by analyzing the results through on-site verification and simulation applied to the initial design. Design standards for the introduction of the safety rating system for general low-voltage electrical equipment were prepared, and 394 youth training facilities were applied to the field to see if the design standards were practically applicable to the field. With the application of the safety rating system for low-voltage electrical equipment for general use, youth training facilities that had been classified as 'appropriate' were able to induce an upgrade to a higher level through voluntary facility improvement according to the application of grades (A to E). As a result of inducing voluntary repair projects based on the results of the 1st and 2nd inspection of youth training facilities, it was confirmed that 86 facilities received grade A, 225 facilities received grade B, and only 311 facilities received grade A to B out of a total of 394 facilities, and there was no grade E.

Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects (건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구)

  • Eung Ho Park;Sudong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

The Study on Highway-Rail Grade Crossings Improvement System in Korea (건널목 개량제도에 관한 고찰)

  • Lee Soon-Cheul;Bhang Youn-Keun
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.385-390
    • /
    • 2005
  • In Korea, about 60 percent of railroad accidents are associated with highway-rail grade crossings numbering 1,657 nationwide, which the railroad system operates. To reduce the number of accidents, the authority formulated methods to improve or eliminate grade crossings. However, the improvement programs have made progress in slow time due to the institute inertia and the lack of funds from the municipal government, which shares the cost of improvement of grade crossings. Thus, this study analyses the institute system of the grade crossings, proposes modifications, and suggests financing methods to improve the grade crossings and to lower the number of accidents. Presently, the grade crossings safety perspective is directed towards road conditions and so a new perspective, which includes safety from the train perspective and to finance in review of railway system and to allocate the cost between the central government and the municipal governments. is discussed.

Commercial Grade Item Dedication of Digital Devices for Safety-related System in Nuclear Power Plant (원자력발전소 안전등급 계통 적용을 위한 디지털 상용기기 품질검증)

  • Hong, Young Hee;Bae, Byung Hwan;Park, Jaehyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.12
    • /
    • pp.1637-1639
    • /
    • 2014
  • In the past, the analog protection relays have been widely used for the safety-related systems in the nuclear power plants due to their stability and reliability. Meanwhile, as the high performance digital system has been developed, the digital systems have been adopted in the non-safety systems. However, since the digital systems currently used in the non-safety systems were not developed according to Q-class standard, Commercial Grade Item Dedication (CGID) procedure should be performed in order to apply them to the safety-related system. The purpose of this paper is to describe the CGID procedure including the analysis of the hardware architecture as well as the software embedded in protective relay to apply to the emergency diesel generator in the nuclear power plant. The entire CGID procedure was performed strictly according to the international standard and regulations.

TECHNICAL REVIEW ON THE LOCALIZED DIGITAL INSTRUMENTATION AND CONTROL SYSTEMS

  • Kwon, Kee-Choon;Lee, Myeong-Soo
    • Nuclear Engineering and Technology
    • /
    • v.41 no.4
    • /
    • pp.447-454
    • /
    • 2009
  • This paper is a technical review of the research and development results of the Korea Nuclear Instrumentation and Control System (KNICS) project and Nu-Tech 2012 program. In these projects man-machine interface system architecture, two digital platforms, and several control and protection systems were developed. One platform is a Programmable Logic Controller (PLC) for a digital safety system and another platform is a Distributed Control System (DCS) for a non-safety control system. With the safety-grade platform PLC, a reactor protection system, an engineered safety feature-component control system, and reactor core protection system were developed. A power control system was developed based on the DCS. A logic alarm cause tracking system was developed as a man-machine interface for APR1400. Also, Integrated Performance Validation Facility (IPVF) was developed for the evaluation of the function and performance of developed I&C systems. The safety-grade platform PLC and the digital safety system obtained approval for the topical report from the Korean regulatory body in February of 2009. A utility and vendor company will determine the suitability of the KNICS and Nu- Tech 2012 products to apply them to the planned nuclear power plants.

The Improvement of the Specific Target for Fire Fighting of Fire Safety Grade System (특정소방대상물의 방화관리 등급체계 개선방안)

  • Kwak, Chang-Sik;Woo, Seong-Cheon;Chae, Jin
    • Fire Science and Engineering
    • /
    • v.24 no.2
    • /
    • pp.162-171
    • /
    • 2010
  • According to the development of industry, many aspects of society have been changed and a living environment has been more convenient than before. However, factors of fire risk are increased because of society which is becoming complex. Moreover, a building built in recently is becoming high-rise and intelligent. Then losses of life and property increase continually. Thus, an institutional strategy which can solve this problem is needed. The purpose of this research is to state a problem of specific a building managing strategy and suggests a reformation of the fire safety grade system of a specific building. The suggested ideas are an adoption of fire risk evaluation of a building, tentatively named "Fire Safety Corporation" establishment, reclassification of the fire safety grade system of a specific building, and newly making fire safety managers of ultra-high buildings and underground structures.

Development of Safety Assessment Indicators and Facility Management System for Crime Prevention - A Case Study of Park -

  • Lee, Su-Ji;Lee, Seung-Su;Song, Ki-Sung;Hwang, Jung-Rae
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.7
    • /
    • pp.109-116
    • /
    • 2019
  • In this study, a GIS-based park safety assessment index was developed to enable objective park vulnerability assessment through data-based GIS analysis, a safety assessment was conducted by selecting a target site where various parks are operated and applying the park safety assessment index. In addition, a facility management system was developed for efficient management of the park safety assessment to update the park safety and provide a foothold for indirect PPGIS. In the case of the assessment index of the safety rating of the park, it was possible to conclude that the accurate quantitative performance was given to the calculation of the safety grade of the park based on the fact that the facilities are different depending on the environment and the size of the park. In addition, the marking the safety grade of parks, as well as the function to show the safety facilities of parks, a common living area for citizens, the management system is expected to have an impact on promoting the use of parks. In the future, in functions such as reporting of facility failures and verifying civil information are implemented by applying civic group participation programs and crowd-sourcing technologies, it is believed that all facilities as well as parks managed by the local government can be managed more efficiently.

Railway Underground Crossing Method Using PC Slab (직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구)

  • Min, Kyung-Ju;Lee, Bang-Woo;Park, Byung-Yong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

The Study on the Grade System and the Grading Criteria of Ammunition Stockpile Test Procedures (ASTP 등급체계와 평가기준에 대한 연구)

  • Yoon Keun-sig;Kwon Tag-man;Park Byung-chan
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.7 no.4 s.19
    • /
    • pp.26-35
    • /
    • 2004
  • The ASTP is the standard of the assessment ASRP that is monitoring the performance, reliability and safety characteristics of the ammunition items. The ASTP used in domestic now has applied to US Army's grade system and grading criteria so that it cause some problems. To resolve these problems of ASTP, we surveyed both the quality level of production and the field management of ammunition, which compared with grade system and classification criteria. As a result of study, we changed grade system from four steps to three steps and applied the Korean Military Specifications and the Malfunction Criteria to the classification criteria of grades. We are looking forward to improving the reliability and effectiveness of ASRP assessment by simplifying grade system and generalizing grading criteria of ASTP.

A Study on the Fire Risk Assessment of EIFS by Cone Calorimeter Test & Single Burning Item Test (중소형화재실험을 이용한 외단열 시스템(EIFS) 화재위험성평가에 관한 연구)

  • Min, Se-Hong;Kim, Mi-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2010
  • Recently, in circumstantial situation it is recommended positively to utilize of EIFS(Exterior Insulating and Finishing System) as energy policy for economizing energy. But internal EPS insulators of EIFS are exterior panel of high fire risk, because of constituting of flammable materials to be fragile in fire. In this study, fire risk is assessed by experiment Con Calorimeter test and SBI(Single Burning Item) test. As the result of experiment, Con Calorimeter tests do not reach to capability standard of internal incombustible grade, and are assessed as low grade in SBI incombustible grade. Because EIPS is exterior material in buildings with high fire risk in spite of good efficiency, it is required rapidly to take measures to meet situation through various studies(for instance, adjusting law regulation, etc.) in the future.