This presentation briefly will be introduced on new drug approval process and the review of safety and efficacy of drugs in Korea. First, we will present the regulation related to new drug registration [Regulation of the Efficacy and Safety Evaluation of Drugs, etc (Notification No. 2003-17), Standards for Toxicity Test of Drugs, etc(Notification 1999-61) and GLP Regulation for Nonclinical Laboratory Studies (Notification No. 2000-63)] and the regulation related to clinical trial [Guidelines to Clinical Study Authorization for Drugs (Notification No. 2002-65)] and [Korean Good Clinical Practice(KGCP, Notification No. 1999-67) Regulation]. (omitted)
Purpose: The purpose of this study is to propose an Integrated Safety Evaluation Process (ISEP) that can enhances the safety aspect of the safety-critical system. This process utilizes the advantages of the iterative Systems Engineering process combined with the safety assessment process that is commonly and well defined in many standards and/or guidelines for railway, aerospace, and other safety-critical systems. Methods: The proposed process model is based on the predefined system lifecycle, in each phase of which the appropriate safety assessment activities and the safety data are identified. The interfaces between Systems Engineering process and the safety assessment process are identified before the two processes are integrated. For the integration, the elements at lower level of Systems Engineering process are combined with the relevant elements of safety assessment process. This combined process model is represented as Enhanced Functional Flow Block Diagram (EFFBD) by using CORE(R) that is commercial modelling tool. Results: The proposed model is applied to the lifecycle and management process of the United States aircraft system. The US aircraft systems engineering process are composed of twelve key elements, among which the requirements management, functional analysis, and Synthesis processes are considered for examplenary application of the proposed process. To synchronize the Systems Engineering process and the safety assessment process, the Systems Engineering milestones are utilized, where the US aircraft system has thirteen milestones. Taking into account of the nine steps in the maturity level, the integrated process models are proposed in some phases of lifecycle. The flows of processes are simulated using CORE(R), confirming the flows are timelined without any conflict between the Systems Engineering process and the safety assessment process. Conclusion: ISEP allows the timeline analysis for identifying activity and data flows. Also, the use of CORE(R) is shown to be effective in the management and change of process data, which helps for the ISEP to apply for the development of safety critical system. In this study, only the first few phases of lifecyle are considered, however, the implementation through operation phases can be revised by combining the elements of safety activities regarding those phases.
There are now the plating process that have many hazardous factor cause of the using numerous noxious chemical and bad working environments. The purpose of the study is to make a selection of suitable safety evaluation method that can analyze and righteously find with numerous hazardous factor of the plating process. And another purpose is to systematically adjust the risk of plating process by comprehension of the role of process, equipment, and source material. Therefore, these studies are carried out in the following three investigations of this report. The first research understands the injurious human health and environment by analyzing hazardous material based on the MSDS. To evaluate the safety of process and compartment, the second research is proposed the security secure counterproposal by using the FMEA and the HAZOP. The final research is devoted to systematically analyze the hazard by applying for reasonable guide word and doing the HAZOP for hazardous factor in specific process.
It is known that human factors account for 80 percent of all railway accidents. To reduce human errors must be the most efficient shortcut to railway safety. For public transportation employees like railway, the more delicate safety management should be executed in individual level. However, there are rarely efforts to improve safety performance of workers who are the subject operating the railway system. This paper develops a hierarchy model to evaluate the human safety performance in railway industry. To evaluate the model, AHP (Analytic Hierarchy Process) methodology is adopted. The hierarchy model is composed of four levels which are objective, two criteria, specific factors of criteria, and rating scales. In addition, since employees for evaluation are over 10, the pairwise comparisons for rating scales are carried out by the absolute measurement. We explore the applicability of AHP to the performance evaluation of railway safety workers by an example and also investigate the changes of alternatives that are railway employees according to the changes of human characteristic which is one of criteria.
In manufacturing industry of the modem industrial society, people increasingly become concerned the awareness of safety increasingly although they have regarded production the most important factor. Even though, as people make efforts on accident preventions, the number of accidents is decreasing, fatal major industry accidents are rather thanincreasing so that the number of deaths has not decreased. Under these conditions, there is an attempt to introduce and perform the process safety management system as a means for keeping from major industry accidents. However, it leaves to be desired on the methods of measuring process safety in the general manufacturing industry, while it is available to do that in the chemistry industry. Therefore, in this paper, we analysis processes of manufacturing industry in safety point of view and suggest the technique efficiently measuring and managing each process. Proposed the technique shows that the specification on safety determines AHP weight through the managers of firms and each process is suggested by using normalized matrix.
The purpose of this study is to explore the applicability of AHP(Analytic Hierarchy Process) to select more productive projects among various proposed projects in a particular company. To achieve this research objective, the characteristics of project evaluation and selection are first reviewed with respect to when, where, and how the decision is made. Then the theoretical basis of the AHP is briefly reviewed along with its mathematical underpinnings to construct the framework of project evaluation and selection. To be more specific, the evaluation and selection criteria were reorganized in the AHP-based framework to make the process of project evaluation and selection more productive. Project evaluation and selection is one of the most important activities for the most companies to be more advantageous in the market. Despite the importance of decision making process of project selection, not many of how to choose the best project were suggested as the reliable project selection methods in the industries. It may be because it involves various activities related to conflict resolution among different evaluation criteria, high uncertainties of market, and the unclear tradeoff among various project objectives. Furthermore, the decision, once made at this point, tends to be irrevocable until the whole process turns out to be a complete success or failure. As the result, the AHP method showed better financial performance rather than the traditional method in a case study.
Proceedings of the Safety Management and Science Conference
/
2013.04a
/
pp.271-284
/
2013
최근 현대 무기체계는 최첨단 기술로 인한 무기체계 개발 속도 증가와 획득환경의 다변화와 더불어 이에 대한 위험도 동시에 증가하고 있다. 이에 따라 미국방부는 무기체계의 수명주기를 고려하여 시험평가를 지속 적용토록 강조하고 있다. 따라서 기존의 무기체계 시험평가 프로세스에서 다루는 시스템 설계에 대한 단계별 안전 활동의 강화의 필요성 역시 강조되고 있다. 그 중에서도 무기체계 개발의 핵심 활동에 해당하는 체계개발 단계는 양산에 들어가기 전의 최종 활동으로서 제대로 수행되어야만 초기에 의도한 무기체계 개발의 목적을 달성할 수 있을 것이다. 본 논문에서는 시스템 안전성 요소를 고려한 시험평가 프로세스의 개선사항 도출과 모델링을 통해 무기체계 시스템인 무기체계를 대상으로 적용 및 조정 구축에 대한 내용을 기술하고 있다. 본 연구의 결과를 토대로 향후 시험평가 기간의 단축 및 비용 절감과 데이터의 관리 및 추적 기능을 개선함으로써 무기체계 개발 후의 안전사고 발생 가능성을 줄일 수 있을 것으로 기대된다.
Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.
This paper proposes an integrated SE process for the development of railway systems with safety assessment included. Although the safety assessment process must be performed with SE process properly with good coordination, the interfaces between the two processes have not been clear. Thus, in many of safety critical system developments in Korea, it is difficult to assess safety in proper development phase. The process model proposed in this paper is based on both the concept of system life cycle and the repetitive use of SE process. In each of development phases, appropriate safety assessment methods are described. Also the evaluation of the integrated system incorporating safety factors is described. The resultant process model is expressed by the Enhanced Functional Flow Block Diagram (EFFBD) using a CASE tool. The model also allows timeline analysis for identifying activity flow and data flow, resulting in the effective management of process. In conclusion, the integrated process enable both the SE process and safety assessment process to cooperate with each other from early development phase throughout the whole system life cycle.
KSCE Journal of Civil and Environmental Engineering Research
/
v.39
no.1
/
pp.105-114
/
2019
Recently, the paradigm of road policy has been focused on user safety. Recently, the number of road facility improvement project has been continuously increased but the economic feasibility (B/C ratio) is insufficient. Therefore, it is necessary to select a reasonable road improvement project through accurate and objective analysis of the road safety evaluation. In this study, to develop a new road safety evaluation method, data were collected based on the current road safety evaluation method for 75 routes including national roads and provincial ones. Based on the collected data, problems were analyzed and utilized as the basic factors of the new road safety evaluation method. Therefore, in this study, traffic accidents were reflected as a general evaluation item by weighing to solve these problems, and the evaluation items were added from experiences and ideas of the local public officials. For each evaluation item, a reasonable weight was determined through AHP (Analytic Hierarchy Process) questionnaire evaluation with highway experts. In addition, the safety index was determined based on the evaluation criteria for each evaluation item. The criteria for evaluating the danger zone are determined by the overall safety index. Finally, the criteria for selection of road improvement projects based on the overall risk level were derived.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.