• Title/Summary/Keyword: Safety change process

Search Result 465, Processing Time 0.039 seconds

A Study on the Fire Safety Measures of Korean Nuclear Power Plants (국내 원자력발전소 화재안전 대책에 관한 연구)

  • 김학중;손봉세;허만성
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2003.04a
    • /
    • pp.259-264
    • /
    • 2003
  • The fire protection system of Nuclear Power Plants(NPPs) is an integrated system that is applied multi-field technology. So, it needs synthetic design and analysis, that is, the plan of fire protection, fire compartment, fire detection, fire suppression, and success of safety shut down, etc. In case of a fire in NPPs, secure the safety of reactor and minimize the radioactivity contamination. For this purpose, perform the fire risk analysis and make up the deducted problem through the improvement of design or the change of operation process.

  • PDF

Research for Adaptive DeadBand Control in Semiconductor Manufacturing (Adaptive DeadBand를 애용한 반도체공정 제어)

  • Kim Jun-Seok;Ko Hyo-Heon;Kim Sung-Shick
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.5
    • /
    • pp.255-273
    • /
    • 2005
  • Overlay parameter control of the semiconductor photolithography process is researched in this paper. Overlay parameters denote the error in superposing the current pattern to the pattern previously created. The reduction of the overlay deviation is one of the key factors in improving the quality of the semiconductor products. The semiconductor process is affected by numerous environment and equipment factors. Through process condition prediction and control, the overlay inaccuracy can be reduced. Generally, three types of process condition change exist; uncontrollable white noise, slowly changing drift, and abrupt condition shift. To effectively control the aforementioned process changes, control scheme using adaptive deadband is proposed. The suggested approach and existing control method are cross evaluated through simulation.

A Case Study on the Risk Analysis for the Installation of Measurement Error Verification Facility in Hydrogen Refueling Station (수소 충전소 계량오차 검증 설비 설치를 위한 위험성 분석 사례 연구)

  • Hwayoung, Lee;Hyeonwoo, Jang;Minkyung, Lee;Jeonghwan, Kim;Jaehun, Lee
    • Journal of the Korean Institute of Gas
    • /
    • v.26 no.6
    • /
    • pp.30-36
    • /
    • 2022
  • In commercial transactions of energy sources using hydrogen charging stations, high-accuracy flow meters are needed to prevent accidents such as overcharging due to inaccurate measurements and to ensure transparency in hydrogen commercial transactions through accurate measurements. This research developed a Corioli-type flowmeter prototype and conducted a risk assessment to prevent accidents during a process change comparison experiment for existing charging stations to verify the measurement performance. A process change section was defined for the installation of measurement facilities for empirical experiments and HAZOP was conducted. In addition, JSA was also conducted to secure the safety of experimenters, such as preventing valve mis-opening during empirical experiments. Measures were established to improve the risk factors derived through HAZOP, and work procedures were established to minimize human errors and ensure the safety of workers through JSA. The design change and system manufacturing for the installation of the metering system were completed by reflecting the risk assessment results, and safety could be confirmed through the performance comparison test of the developed meter prototype. The developed prototype flow meter showed a total of 30 flow measurements under the operating conditions of 70 MPa, and the average error was -1.58% to 3.96%. Such a metering error was analyzed to have the same performance as a flow meter installed and operated for commercial use.

A study on the Strategy for Management Business Innovation and Information System in Next generation. (Focued on PI & Six Sigma) (차세대 경영혁신 및 정보시스템 구축 전략에 관한 연구 (PI & 6시그마 중심으로))

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.19-29
    • /
    • 2005
  • Since 1980's, many enterprises have constructed Strategy Information System and tried BPR, ISP. Also, they implemented ERP and practiced the Process Innovation and Six Sigma for Management Innovation in todays, Although most companies had provious good plans, but those are not satisfied. Because of failed to change management and continued next activity. Many Project for Process innovation are ended as disposal project in many case, if they want next project, they need a new plan which needs additional fund and re source. This paper studied Process Innovation and Six Sigma in many things and proposed new model for continued project on the master plan. Also it proposed next study subject about ERP Optimization and Harmonization after implemented ERP which is considered as next step of PI.

  • PDF

A study on the Strategy for Management Business Innovation and Information System in Next generation(Focued on PI & Six Sigma) (차세대 경영혁신 및 정보시스템 구축 전략에 관한 연구(PI & 6시그마 중심으로))

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.119-130
    • /
    • 2006
  • Since 1980's, many enterprises have constructed Strategy Information System and tried BPR, ISP. Also, they implemented ERP and practiced the Process Innovation and Six Sigma for Management Innovation in todays. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and continued next activity. Many Project for Process innovation are ended as disposal project in my case, if they want next project, they need a new plan which needs additional fund and resource. This paper studied Process Innovation and Six Sigma in many things and proposed new model for continued project on the master plan. Also it proposed next study subject about ERP Optimization and Harmonization after implemented ERP which is considered as next step of PI.

A basic study on the reuse of shipboard wastewater(I) - The secondary treatment of shipboard wastewater by Sequence Batch Reactor(SBR)- (선박용수의 재사용에 관한 기초연구(I) -연속회분식 반응조를 이용한 선박폐수의 2차처리-)

  • 김인수;김억조;김동근;고성정;안종수
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.4 no.1
    • /
    • pp.41-48
    • /
    • 1998
  • There are several serious problems in treating shipboard wastewater due to special environmental conditions of ship, such as confined space, rolling and pitching, change of temperature and so on. It was suggested that Sequence Batch Reator (SBR) process might be suitable for overcoming above problems in terms of small size, high capacity of treating wastewater and full automation. In this study the SBR process was used for the secondary treatment of shipboard wastewater. The average removal efficiency of DOC, nitrogen, phosphorus and surfactants(MBAS) were studied and the effects of various C/N ration on the efficiency of treatment were investgated. From the experimental results it was convinced that the SBR process would be able to be used as a suitable process for removing organic matters and nitrogen in reuse system of shipboard wastewater.

  • PDF

Development of the Order Picking Algorithm for Warehouse Management System in SCM Environment

  • 조종남;남호기;박상민;오성환
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.129-142
    • /
    • 2003
  • The SCM is that Supply Chain Network is Promptly and Voluntarily Optimized in Unstable Market Change Environment. The Cash flow Efficiency of Hole Supply Chain Network is Improved by Changing the Information and Changing the Foundation of Business Processes. The Role of WMS has been Changing Importantly with the Introduction of SCM. WMS Needed to Change to the Information Center in Order to Change Information in Real Time and the WMS of Information Storing in Order to Support an Idea Decision. This Development was Defined about the Importance of WMS in SCM Environment. The Criterion of Valuation is Normally Measured Time between Taking a Order Receive and Bringing the Items to Customer. The Decreasing Move Time of Order Picker in Warehouse is Directly Influence to the Job Execution. So, this Research is Defined about the Optimized Route of Order Picker and Suggests Algorithm. To do this, Past Algorithm is Studied. It's Easy to Introduce and this Study is Looking for Method about the Noticing of Order Picker. The Algorithm will Improve to be Adapt to Standard Process System.

  • PDF

A Study on Project Success Factors and Individual Personality for Project Team Activation - Based on ERP Project - (프로젝트팀 활성화를 위한 개인성향과 프로젝트 성공 요인에 대한 연구 -ERPProject중심으로-)

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.279-286
    • /
    • 2006
  • Since 1990's, many enterprises have implemented ERP System. Especially, they want to become an advanced company use ERP implementation. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and had many problem about Project team operation. Therefore, important success factors for ERP project are change management and organization activation for Project team. The purpose of this study is suggest to improve method about team activation through analysis the Project team member's individual personality as a factor that makes the success of Project team. This paper studied success factors of project team and plan for organization activation. The results of this study can be used for a successful implementation of the ERP system as make of Project team consider of individual personality and administer a Project team.

  • PDF

A study on the Plan for Organization Activation use analysis of Success factor Integration Information System (통합정보시스템 구축 프로젝트 성공 요인 분석을 통한 조직 활성화 방안에 대한 연구)

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.367-372
    • /
    • 2006
  • Since 1990's, many enterprises have constructed Integration Information System. Especially, they want to become an advanced company use ERP package. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Therefore, important success factors for ERP project are change management and organization activation. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and discontinued next activity for promotion. This paper studied success factors of project team and plan for organization activation. Also, it proposed next study subject about investigate the role of the member of task force team as a factor that makes the ERP system a success. The results of this study can be used for a successful construction of the ERP system as a solution about internal problems of Project team.

  • PDF

A study on the Plan for Organization Activation use analysis of Success factor Integration Information System (통합정보시스템 구축 프로젝트 성공 요인 분석을 통한 조직 활성화 방안에 대한 연구)

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.231-242
    • /
    • 2006
  • Since 1990's, many enterprises have constructed Integration Information System. Especially, they want to become an advanced company use ERP package. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Therefore, important success factors for ERP project are change management and organization activation. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and discontinued next activity for promotion. This paper studied success factors of project team and plan for organization activation. Also, it proposed next study subject about investigate the role of the member of task force team as a factor that makes the ERP system a success. The results of this study can be used for a successful construction of the ERP system as a solution about Internal problems of Project team.