The purpose of this paper is to measure the induced voltage of the downscaled and simulated overhead ground wire of a 22.9kV-Y distribution line. This study performed a test of the downscaled and simulated distribution line according to whether it is grounded or not and the value of the ground resistance. In order to verify the reliability of the data measured by the test, the data was analyzed using the Minitab 17 program. It was found that the induced voltage of the downscaled and simulated distribution line is influenced by the value of the ground resistance. It was also found that the ground resistance obtained at a certain point is closely related to whether electric poles are grounded or not. The analysis results of the measured test data with a statistical method showed that the Anderson Darling (AD) was analyzed to be the smallest as 0.188 when the ground resistance of the electric poles had been maintained at $10{\Omega}$. In addition, the P value analyzed to be 0.894 which is in the proximity of the theoretical value of 1 and verified the reliability of the test data. It could be seen that the data measured by the downscaled simulation test forms a linear graph. It is thought that if a distribution line is installed in the same manner as the downscaled, simulated distribution line, the mean induced voltage will be reduced and reliability will be increased.
The Port of Pyeong Taek is located on the west coast, meaning that the difference between the rise and fall of tide is great (flood tide 1.8 to 2.9 knots, ebb tide 1.6 to 2.9 knots). Due to mainly N~NW'ly strong winds & high waves during winter, navigating as well as loading & discharging vessels must focus on cargo handling. The strong tidal and wind forces in the Port of Pyeong Taek can push an LNG carrier away from its berth, which will end up causing forced disconnection between the vessel's cargo line and shore-side loading arm. The primary consequence of this disconnection will be LNG leakage, which will lead to tremendous physical damage to the hull and shore-side equipment. In this study, the 125K LNG Moss Type ship docked at No. 1 Pier of the Pyeong Taek is observed, and the tension of the mooring line during cargo handling is calculated using a combination of wind and waves to determine effective mooring line and mooring line priority management. As a result if the wind direction is $90^{\circ}$ to the left and right of the bow, it was found that line monitoring should be performed bearing special attention to the Fore Spring Line, Fore Breast Line, and Aft Spring Line.
본 논문은 피난기구의 사용시간 실험분석을 통한 안전체험교육 개선에 관한 방향을 알아보기 위해 진행되었다. 연구를 위해 피 실험자들을 체격과 체중이 비슷한 그룹으로 나누어 구성하였고, 4가지 피난기구를 직접 체험하게 함으로서 체험시간을 측정하여 분석하였다. 피난기구 설치에서부터 탈출까지의 전체시간 분석에서 완강기-경사식구조대-수직구조대-공기안전매트 순으로 탈출시간이 소요되었다. 피난기구의 탈출시간만 분석했을 경우에는 공기안전매트-경사식구조대-완강기-수직구조대 순으로 탈출시간이 분석되었다. 완강기의 1차 2차 실험에서 나타난 것처럼 1차 시간은 경험 후에 2차 시도에서 시간이 줄어들었다. 이처럼 체험을 통한 교육은 행동의 자신감 증가와 시간의 관리가 가능한 것으로 나타났다. 본 연구의 결론으로 안전교육의 목표는 인명과 재산피해의 최소화이고, 이를 위한 노력으로 많은 사람들에게 교육을 통해 최소화 하는 방법과 자신의 안전을 지키는 교육을 진행한다. 그러므로 더 많은 사람들에게 이러한 효과를 가져 오기 위해서는 체험교육을 통해 학습효과를 높이고, 자기안전을 지키게 하는 노력이 필요하다.
Line capacity calculation has been used to determine optimum efficiency and safe train service for train scheduling plan and investment priority order throughout detecting bottleneck section. Because of some problems of Yamagisi and UIC methods for line capacity calculation, developing of the method of line capacity calculation and evaluation for the Korea circumstance is important. This paper deals with the integrated system of TPS(Train Performance Simulator), PES(Parameter Evaluation Simulator), LCS (Line Capacity Simulator) and sensitivity analysis for line capacity calculation model.
Thanks to the fact that the 1953 Korea Armistice Agreement does not have any clear provisions on the sea demarcation line, the North Korea insists that the sea demarcation line in the Yellow Sea Area should not be the NLL designated by the Commander in Chief. UN Command, unilaterally, but the hypothetical extention of the Latitude Parallel from the end of the provincial boundary line between Whanghae-do and Kyongki-do In those unique situations at the end of the Korean War, the cease-fire line on the part of the western sea area, a logically indispensable element of the contents of an armistice agreement, however has formed and crystallized by the act of the UN Command designating the NLL. In implementing the South-North Korean Basic Relations Agreement, a fair and clear common consent on the sea demarcation line in the western sea area should be deliberated.
Line capacity calculation has been used to determine optimum efficiency and safe train service for train scheduling plan and investment priority order throughout detecting bottleneck section. Because of some problems of Yamagisi and UIC methods for line capacity calculation, developing of the method of line capacity caculation and evaluation for the Korea circumstance is important. This paper deals with the reliability improvement on the integrated system of TPS(Train Performance Simulator), PES(Parameter Evaluation Simulator), LCS(Line Capacity Simulator) and simulation and sensitivity analysis for line capacity.
There are two methodologies to increase transport capacity of railway. The one is to invest railroad equipment or vehicles, and the other is to improve operation efficiency through optimization. All of these is intended to increase transport capacity by improving line capacity So far, we treat line capacity as the criteria for evaluating investment alternatives or for restricting tram frequencies, and this criteria is calculated statical and experimental numerical formula. But, line capacity has special attribute that change dynamically according to operational condition, so there is a need of new line capacity estimation system. The Purpose of this paper is to present a new line capacity estimation system based on the probability simulation and its applications.
Korea Railroad Research Institute (the following 'KRRI') built AGT test line in Gyeong San-city, Kyongsang-bukdo province, Korea on August, 2004. This test line is exclusively used for the test of the driverless rubber-tired AGT system, and applied with research result of AGT System Development Project like vehicles, power supply, control and signaling, track and infrastructure system. The test line is available for the test of rubber tired AGT system's performance, function, safety. In this paper, we described the operation system of test line for the test of performance, safety, reliability, and also system operation in emergency. Finally we present the operation result of test line.
The Seoul subway is acting the center of public transportation after the opening of the first line on August 15, 1974. and the subway line of the DC traction system is running and building to the ninth line. However, the main insulation parts used in overhead contact line are now imported from overseas products. Therefore, this paper considers domestic manufacture technology, supply easiness and economic effectiveness of insulation products and reviews the safety of support insulator used in rigid conductor line, stem insulator used in movable bracket and AC/DC different phase section insulator that localization development is necessary.
Railroad line capacity is influenced by Quantitative and Qualitative factors which is applied by parameter to calculate it. But these parameters have been used experiential value without analyzing its reasonability or appropriate level. In this paper, we introduce the concept of robustness to Quantify parameter and evaluate robustness of it. For this purpose, we develop parameter evaluation simulator and present it. If this simulator is utilized, we can find the parameter having appropriate robustness and it will be applied to calculate more reasonable and systematic railroad line capacity.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.