• Title/Summary/Keyword: Safety Assessment

Search Result 5,534, Processing Time 0.037 seconds

Performance Assessment Model for Fire Safety Protection of Office Building (사무소 건축물의 화재안전 성능 평가모델)

  • Yang, Eun-Bum;Hwang, Young-Sam;Lee, Chan-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.2
    • /
    • pp.69-74
    • /
    • 2004
  • This study is to suggest a performance assessment model for fire safety protection of office building 34 asessment elements were chosen by interviewing with experts, reviewing several codes and existing relevant models, assessment elements included in this model are comprised of five categories which are 'performace of protected area', 'performance of fire partition', 'safety performance of fire escape', 'performace of smoke control system' and 'performace of fire fighting equipment'. The weight of each element was computed by systematic approach like an AHP (analytical hierarchy process), which was conducted by experts who work in the field of fire protection. This model would be utilized as a part of assessment model for the overall performace of domestic office building.

A Study on the Effectiveness of the Risk Assessment Regulations for Construction Works (건설공사 유해위험방지계획서제도의 효과분석에 관한 연구)

  • 안홍섭;노민래;이명구
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.134-139
    • /
    • 2001
  • The Risk assessment regulation(RAR) is one of the essential articles of the Occupational safety and health law for the construction industry along with safety and health management expense and safety organization regulation. However, arguments regarding the working time of the safety assessment documents, the person in charge of documentation, weakness in legislative enforcement etc. are ongoing. Thus this study aims to analyze the effectiveness of RAR for the guidance of enhancing the effectiveness of RAR. The findings are; 1) the effectiveness of RAR is recognized, however the indirect effectiveness ie, enforcement of safety activities, previewing of drawings etc. are bigger than the direct effectiveness of accident prevention, 2) to enhance the effectiveness of RAR site inspection procedure has to be utilized, 3) further research for identifying and getting rid of negative factors in RAR is recommended.

  • PDF

Comparative Analysis of Work Stress Assessment Tools for Estimating Human Work Performance (업무수행도 추정을 위한 직무스트레스 평가표의 비교 분석)

  • Jang, Tong-Il;Lee, Yong-Hee;Han, Kyu-Jeong;Lim, Hyeon-Kyo
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.144-150
    • /
    • 2014
  • A man is a component of a large system how complex it may be so that human performance which can influence on the system safety should be included in system safety assessment. Meanwhile, human performance can vary over time due to lots of factors. Among them, stress is an indirect factor that may cause human error which can result in industrial accidents. To assess stress level of human workers, not a few assessment tools have been developed. However, it can be questionable to utilize them for human performance anticipation because they were mainly developed with the viewpoint of mental health, though stress assessment can be also required in the safety aspect. Therefore, this study aimed to survey the possibility of their application with safety purpose. About 10 kinds of work stress tools were collected and analyzed with reference to assessment items, assessment and analysis methods, and follow-up measures. The results showed that most tools focused their weights on Demands, Supports, and Relationships, in sequence. However, they, except only one tool developed by the Japanese researchers, merely advised to set up counterplans in PDCA cycle or risk management activities. In consequence, application of stress assessment tools mainly developed for mental health seemed impractical for safety purpose with respect to human performance anticipation so that it was concluded that development of a new assessment tools aimed to human performance variation and accident prevention would be inevitable.

The Functional Safety Assessment of WIG Craft in Design Stage (위그선 설계단계에서의 안전성 평가)

  • Lee, Soon-Sup;Park, Beom-Jin;Lee, Jong-Kap
    • Journal of Ocean Engineering and Technology
    • /
    • v.24 no.6
    • /
    • pp.103-108
    • /
    • 2010
  • WIG crafts are high speed vessels with the features of a dynamic supported craft. These crafts, which are predominantly lightweight and operate at substantially greater speeds than conventional craft, could not be accommodated under traditional maritime safety instruments. WIG crafts inherently possess more hazard factors than conventional ships because of their relatively high speed, lightweight, and navigational characteristics, and an accident is likely to cause damage to the ship and a high loss of life. Because WIG crafts are composed of many systems and subsystems, the safety assessment of a WIG must use a commercial software system in the design stage. This paper reviews a safety assessment process and methodology proposed by the IMO interim guideline, which were developed in view of the configuration of WIG crafts. This safety assessment system was developed to fit the WIG's safety assessment process using a reliability analysis system widely used in commercial systems. The FHA was performed on the functional hazards of systems in the conceptual design stage.

A Basic Study on the Risk Assessment of Domestic Construction Companies (국내 건설업체의 위험성평가 실태조사 기초 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.240-241
    • /
    • 2019
  • Construction disasters have more distinctive characteristics than other industrial disasters. Since it is likely that construction disasters will spread to severe accidents, the accident mortality rate is very high compared to the disaster incidence rate. Therefore, the purpose of this study is to compare and analyze the operation status of construction risk assessment by domestic large and medium sized construction companies to prepare improvement direction of risk assessment system. The survey results for safety management experts of construction companies are as follows: Large companies have developed and utilized risk assessment systems in their respective companies, while small and medium construction companies have developed and evaluated risk factors through the Excel program. Rather than performing risk assessment tasks based on historical safety accident data, construction companies have limitations in developing risk factors and preparing solutions with suppliers for each major construction. Therefore, it is necessary to prepare a risk assessment system in the future by analyzing the types of safety accidents, such as the safety accident data of each company as well as the safety accident data.

  • PDF

A Study on the Hazard Identification for the Implementation of A-SMGCS (A-SMGCS 구현을 위한 위험요소 식별에 대한 연구)

  • Hong, Seung-Beom;Choi, Seung-Hoon;Choi, Youn-Chul
    • Journal of Advanced Navigation Technology
    • /
    • v.19 no.1
    • /
    • pp.41-47
    • /
    • 2015
  • Recently, it is actively under study for the implementation of advance surface movement ground control systems (A-SMGCS) level IV in Korea. To ensure the safety of the A-SMGCS system needs the safety assessment, and Eurocontrol is encouraged to perform the functional hazard assessment, preliminary system safety assessment, and system safety assessment to the safety assessment of A-SMGCS. In this paper, we identify the hazard of A-SMGCS through a functional hazard assessment. Therefore, we will identify 29 types of hazard for the A-SMGCS level IV and serve as important data to evaluate the severity of each hazard.

Comprehensive Assessment on Risk Factors using Fuzzy Inference in Decommissioning Process (퍼지추론을 이용한 해체공정 중 리스크 요인의 통합 평가)

  • Lim, Hyeon Kyo;Kim, Hyunjung
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.184-190
    • /
    • 2014
  • Decommissioning process of nuclear facilities consist of a sequence of problem solving activities, because there may exist not only working environments contaminated by radiological exposure but also industrial hazards such as fire, explosions, toxic materials, and electrical and physical hazards. Therefore, not a few countries in the world have been trying to develop appropriate counter techniques in order to guarantee safety and efficiency of the process. In spite of that, there still exists neither domestic nor international standard. Unfortunately, however, there are few workers who experienced decommissioning operations a lot in the past. As a solution, it is quite necessary to utilize experts' opinions for risk assessment in decommissioning process. As for an individual hazard factor, risk assessment techniques are getting known to industrial workers with advance of safety technology, but the way how to integrate those results is not yet. This paper aimed to find out an appropriate technique to integrate individual risk assessment results from the viewpoint of experts. Thus, on one hand the whole risk assessment activity for decommissioning operations was modeled as a sequence of individual risk assessment steps which can be classified into two activities, decontamination and dismantling, and on the other, a risk assessment structure was introduced. The whole model was inferred with Fuzzy theory and techniques, and a numerical example was appended for comprehension.

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

Safety Assessment in Operation of Human-centered Robots - An Information-theoretic Approach

  • Choi, Gi-Heung
    • International Journal of Safety
    • /
    • v.5 no.2
    • /
    • pp.12-17
    • /
    • 2006
  • Operations of human-centered robot, in general, facilitates the creation of new process that may potentially harm the human operators. Design of safety-guaranteed operation of human-centered robots is, therefore, important since it determines the ultimate outcomes of operations involving safety of human operators. This study discusses the application of information-theoretic measures to safety assessment of human-centered robotic operations. Some examples are given.

Discussion for Improvement of Decision System of Total Risk in Off-site Risk Assessment (화학사고 장외영향평가 제도의 종합위험도 결정 체계 개선을 위한 고찰)

  • Choi, Woosoo;Ryu, Taekwon;Kwak, Sollim;Lim, Hyeongjun;Jung, Jinhee;Lee, Jieun;Kim, Jungkon;Baek, Jongbae;Yoon, Junheon;Ryu, Jisung
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.3
    • /
    • pp.217-226
    • /
    • 2018
  • Objectives: Despite the positive effects of Off-site risk assessment (ORA) system such as prevention of chemical accidents, some problems have been constantly raised. The purpose of this study is to analyze the problems that have occurred through the implementation of the ORA system for the past three years and to suggest reasonable directions for improvement in the future. Methods: In order to identify the problems with the methodology and procedure of ORA system, we analyzed statutes, administrative rules and documents related to the ORA system. A survey of ORA reviewers in National Institute of Chemical Safety was conducted to investigate the weight of determinants considered when judging the level of total risk in ORA. Results: In this study, we found out the uncertainty of the estimation of the number of people in the impact range in the procedure of the risk assessment of individual handling facilities, the lack of quantitative risk analysis methods for environmental receptors, and the ambiguity of the criteria for the total risk. In addition to suggesting solutions to the problems mentioned above, we also, suggested a decision tree for total risk in ORA. Conclusion: We anticipate that the solutions including the systematic decision tree for total risk suggested will contribute to the smooth operation of the ORA system.