• Title/Summary/Keyword: Safe tunneling method

Search Result 20, Processing Time 0.023 seconds

Safe tunneling method using numerical modeling of rock blocks in long tunnels (장대터널에서의 암반 블록의 수치 모델링을 이용한 터널 안전 시공법)

  • Hwang, Jae-Yun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.167-174
    • /
    • 2015
  • Since about 70 percent of the territory is mountainous, more tunnels are constructed in Korea for maximizing the development efficiency. With the increasing number of tunnel construction, safe construction in tunnels has been emerged as the utmost important subject. Recently, the number of long tunnel construction is steeply increased because of the request for high speed and straight road. In this study, a safe tunneling method using numerical modeling of rock blocks in long tunnels is proposed, and then applied to the long tunnel based on real discontinuity information observed in situ. It is possible to detect key blocks all along the tunnel exactly by using the numerical analysis program developed for the safe tunneling method using numerical modeling of rock blocks. This computer simulation method with user-friendly interfaces can calculate not only the stability of rock blocks but also the design of supplementary supports.

A study on Gap Parameter and Influence Area of Ground Settlement Using Back Analysis Constructed by Shield TBM with Shallow Depth (천층터널 쉴드TBM에서 역해석을 이용한 Gap Parameter 및 지표침하 영향범위에 대한 연구)

  • Koh, Sung-Yil;Kwon, Sung-Ju;Hwang, Chang-Hee;Kim, Sang-In;Choo, Seok-Yeon
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1509-1518
    • /
    • 2011
  • Shield TBM tunneling method has been getting the spotlight for urban tunneling. It can be minimized the civil complaint during construction and possible safe tunneling. But the settlement has occurred inevitably due to characteristics of shield TBM equipment. For this reason, the civil complaint can occur in urban areas when tunnel with shallow depth passes through neighboring building or residential area. In this study, the occurrence factors of settlement according to shield TBM tunneling and the tendency of ground settlement by strata condition had analyzed. It is suggested that the practical settlement estimation method and minimizing method of ground settlement under simultaneous backfill grouting condition through measurement results and back analysis data using gap parameter.

  • PDF

The suggestion of tunneling information and detail requirements for EPB shield machine design (토압식 쉴드TBM 장비설계를 위한 설계항목과 세부 요구사양의 구성에 관한 제안)

  • Kim, Ki-Hwan;Kim, Hyouk;Kim, Seong-Cheol;Kang, Si-On;Mun, Cheol-Hwa
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.611-622
    • /
    • 2020
  • Recently, tunneling projects using shield TBM are increasing in Korea, but the information of client for machine design and manufacturing considering the characteristics of the tunneling phase is not formal, and it is difficult to optimized machine for suitable tunneling works. This paper suggest as for reference the required terms that can be used in Korea on the design items and detailed requirements for ordering of EPB shield TBM based on overseas case study. It would be hope that the TBM user can request the overall tunneling plan and required machine specification when ordering TBM, and the TBM supplier can design and manufacturing that is clear condition and suitable machine for the successful project, so that there are no residential civil complaints and for safe tunneling as well, shield TBM tunneling method will be activated.

Application of Norwegian Method of Tunnelling (NMT) Principles to bypass landslides in mountainous terrain

  • Bhasin, Rajinder;Aarset, Arnstein
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.26-35
    • /
    • 2020
  • Tunnelling to bypass major landslide areas is considered as a good and long-term environmentally friendly solution to reduce an existing hazard. In Norway, hundreds of kilometres of tunnels have been constructed in areas prone to landslides and snow avalanches. Although tunnelling is considered as an expensive mitigation strategy for bypassing landslides, analysis indicate that in some cases the cost of building a tunnel can be repaid by savings in driving costs (fuel) alone over a period of 5-10 years due to reduced driving distances. The other benefits of constructing tunnels in landslide areas include savings in time and increased safety. The Norwegian Method of Tunnelling (NMT) is considered safe, efficient and cost effective compared to other tunnelling techniques. Some aspects of NMT, which are considered safe and cost efficient, are presented. The application of updated rock support techniques, including reinforced ribs of shotctrete (RRS), which is a key component of the Norwegian Method of Tunnelling (NMT), is highlighted.

Natural Orifice Transluminal Endoscopic Surgery and Upper Gastrointestinal Tract

  • Kim, Chan Gyoo
    • Journal of Gastric Cancer
    • /
    • v.13 no.4
    • /
    • pp.199-206
    • /
    • 2013
  • Since the first transgastric natural orifice transluminal endoscopic surgery was described, various applications and modified procedures have been investigated. Transgastric natural orifice transluminal endoscopic surgery for periotoneoscopy, cholecystectomy, and appendectomy all seem viable in humans, but additional studies are required to demonstrate their benefits and roles in clinical practice. The submucosal tunneling method enhances the safety of peritoneal access and gastric closure and minimizes the risk of intraperitoneal leakage of gastric air and juice. Submucosal tunneling involves submucosal tumor resection and peroral endoscopic myotomy. Peroral endoscopic myotomy is a safe and effective treatment option for achalasia, and the most promising natural orifice transluminal endoscopic surgery procedure. Endoscopic full-thickness resection is a rapidly developing natural orifice transluminal endoscopic surgery procedure for the upper gastrointestinal tract and can be performed with a hybrid natural orifice transluminal endoscopic surgery technique (combining a laparoscopic approach) to overcome some limitations of pure natural orifice transluminal endoscopic surgery. Studies to identify the most appropriate role of endoscopic full-thickness resection are anticipated. In this article, I review the procedures of natural orifice transluminal endoscopic surgery associated with the upper gastrointestinal tract.

An overview of several techniques employed to overcome squeezing in mechanized tunnels; A case study

  • Eftekhari, Abbas;Aalianvari, Ali
    • Geomechanics and Engineering
    • /
    • v.18 no.2
    • /
    • pp.215-224
    • /
    • 2019
  • Excavation of long tunnels by shielded TBMs is a safe, fast, and efficient method of tunneling that mitigates many risks related to ground conditions. However, long-distance tunneling in great depth through adverse geological conditions brings about limitations in the application of TBMs. Among various harsh geological conditions, squeezing ground as a consequence of tunnel wall and face convergence could lead to cluttered blocking, shield jamming and in some cases failure in the support system. These issues or a combination of them could seriously hinder the performance of TBMs. The technique of excavation has a strong influence on the tunnel response when it is excavated under squeezing conditions. The Golab water conveyance tunnel was excavated by a double-shield TBM. This tunnel passes mainly through metamorphic weak rocks with up to 650 m overburden. These metamorphic rocks (Shales, Slates, Phyllites and Schists) together with some fault zones are incapable of sustaining high tangential stresses. Prediction of the convergence, estimation of the creeping effects and presenting strategies to overcome the squeezing ground are regarded as challenging tasks for the tunneling engineer. In this paper, the squeezing potential of the rock mass is investigated in specific regions by dint of numerical and analytical methods. Subsequently, several operational solutions which were conducted to counteract the challenges are explained in detail.

Inspecting Stablity of DSM method with Grouting on Tunnel Face using Chamber Test and Numericlal Analysis (토조실험과 수치해석을 이용한 막장면 그라우팅 DSM공법의 안정성 검토)

  • Kim, Young-Uk;Park, Young-Bok;Kim, Li-Sak;Kim, Nak-Kyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.3
    • /
    • pp.677-683
    • /
    • 2016
  • In urban areas, underground tunnel construction sites have spread widely to accommodate rapidly increasing traffic volume along with a high-degree economic growth. Earth tunneling might be adapted frequently for the underground space securing, and various tunneling methods have been developed to stabilize the tunnel face and crown. Among them, the DSM (divided shield method) is gaining popularity for its enhanced stability and construction efficiency. This method has its foundation from the Messer Shield method, which is one of the trenchless special tunneling methods. This study examined the effects of face reinforcement on construction the sequence through a large scale soil chamber test and numerical analyses. The chamber has a size of a 1/2 scale of the real tunnel. Surface settlements were measured according the tunneling process. Commercially available software, MIDAS GTS, was used for numerical analysis and its result was compared with the values obtained from the chamber test. The results of the study show that both settlements of the embanked soils and the stress of the tunnel girder are located within the safe criteria. Overall, this study provides basic data and the potential of using a reinforced tunnel face to enhance DSM applications.

Shield TBM trouble cases review and parameter study for the cause analysis (쉴드 TBM 트러블 사례 및 매개변수 연구를 통한 원인 분석)

  • Koh, Sungyil;La, You-Sung;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.197-217
    • /
    • 2020
  • Shield TBM tunneling, used in the construction of Seoul subway line 7 and line 9, has been well known as a very efficient, as well as safe, tunneling method. Although the Shield TBM method has been known to be effectively used in poor ground conditions, a number of troubles have occurred during the use of the shield TBM, due to inappropriate machine selection, machine breakdown, and unpredicted ground conditions etc. In this study, several accidents and trouble cases occurred during excavation by Shield TBM, reported from Japan, were investigated. A series of numerical analysis was then performed to compare with the trouble cases and back-analysis results for the cause analysis. The lessons learned from the case studies are presented at the end.

The pedicled anterolateral thigh flap for trochanteric pressure sore reconstruction: Technical notes to optimize surgical outcomes

  • Hifny, Mahmoud A.
    • Archives of Plastic Surgery
    • /
    • v.48 no.1
    • /
    • pp.114-120
    • /
    • 2021
  • Background The pedicled anterolateral thigh (ALT) flap has become more popular for the reconstruction of soft-tissue defects in neighboring areas. Nonetheless, few studies in the literature have explored the use of this flap for trochanteric ulcer reconstruction. The aim of our study is to present the author's experience of utilizing the ALT flap, with a focus on technical elements regarding the flap design and the tunneling method to maximize the reach of the flap. Methods The medical records of patients who received pedicled ALT flaps for the reconstruction of trochanteric pressure sores were retrospectively reviewed. The patients' demographic data, operative details, and postoperative complications were evaluated. Results Between October 2018 and December 2019, 10 consecutive patients (age range, 13-45 years) underwent 11 pedicled ALT myocutaneous flaps for trochanteric pressure sore reconstruction. Each flap was designed around the most distal cutaneous perforator that was included in the proximal third of the skin paddle. The flaps ranged in size from 11×6 to 14×8 cm. The ALT flap was transposed through a lateral subcutaneous tunnel in five patients, while the open tunnel technique was used in six patients. All flaps survived, and no vascular compromise was observed. Conclusions The pedicled ALT flap is a safe and reliable option for reconstructing trochanteric pressure sores. An appropriate flap design and a good choice of the tunneling method are crucial for successful flap transposition.

A Study on the Ground Movement around Tunnel Reinforced by Umbralla Arch Method (Umbrella Arch 공법에 의한 터널 천단부 보강시 주변 지반의 거동에 관한 연구)

  • 배규진;김창용;문홍득;훙성완
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.299-309
    • /
    • 1997
  • Soil and rock improvement and reinforcement techniques are applied to achieve safe tunnel excavation in difficult geological conditions. The Umbrella Arch Method(UAM), one of the auxiliary techniques, is used to reduce ground permeability and improve stabtility of the tunnel by inserting a series of steel pipes into ground around the crown inclined to the longitudinal axis of the tunnel. Additionally, multi-step grouting is added through the steel pipes. UAM combines the advantages of a modern forepoling system with the grouting injection method. This technique has been applied in subway, road and utility tunneling sites for the last few years in Korea. This paper presents the results of analysis of the case studies on ground movements associated with UAM used in the Seoul Subway line 5 constructon site. Improvement of tunnel stability and decrease of ground settlement expected with pipe insertion are also discussed. Finally, the method to minimize ground settlements caused by NATM tunnelling are suggested.

  • PDF