A Study on the Selection of Compaction Method in Order to Utilize the Waste Landfill Selected Soils (폐기물매립장 선별토사 활용을 위한 다짐공법 선정에 관한 연구)

  • Nam, Hong-Ki;Lee, Seung-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.8
    • /
    • pp.29-40
    • /
    • 2017
  • In this study, the dynamic compaction method was selected by analyzing field situation, soil condition data and compaction test characteristics of the special selected soils, and the compaction method for using the selected soils as the site restoration soil of the ${\bigcirc}{\bigcirc}$ city non-sanitary landfill maintenance project. The N value in the standard penetration test (SPT) before and after dynamic compaction increased by an average of 89% over the range 12~18, and the allowable bearing capacity of the plate bearing test (PBT) was ranged $150{\sim}227kN/m^2$, at least 80% higher than that before test. As a result, it can be seen that the same tendency as the dynamic compaction effect applied to the existing dredging and waste landfill is shown.

Carrying Capacity Behavior of Instrumented PC Piles (시험 콘크리트 말뚝의 지지력 거동)

  • 이영남;이종섭
    • Geotechnical Engineering
    • /
    • v.14 no.5
    • /
    • pp.163-172
    • /
    • 1998
  • To study the carrying capacity behavior of pile, dynamic pile testis and static load tests were carried out on two instrumented piles during and some time after pile driving. Cone Penetration Test( CPT) and Standard Penetration Test(SPT) were also performed at the test site before pile tests to investigate the relationship between unit skin friction of piles and cone tip resistance values and SPT N values. Total static capacity of pile reached the ultimate stage at the pile head settlement of about 0.055D (D : Pile diameter), at which skin friction of Pile already Passed the maximum value, but the end bearing was still increasing with the pile head settlement. The carrying capacity of pile increased in the form of natural logarithmic function with the time after pile driving. The increase in skin friction with time was very substantial the increase in skin friction 40 days after pile driving was 4.6 times of that determined during pile driving. The contribution of skin friction to the total capacity twas insignificant in the beginning, but became substantial 40 days after pile driving. This implies that the tested pile initially responded as an end bearing pile and later behaved as a friction pile. It was also noted that unit skin friction of pile might be ielated to cone tip resistance values(q.) and SPT N values, though the coefficient of this relationship might differ from one soil group to another and was somewhat greater than the value used in the design practice of Korea.

  • PDF

An evolutionary hybrid optimization of MARS model in predicting settlement of shallow foundations on sandy soils

  • Luat, Nguyen-Vu;Nguyen, Van-Quang;Lee, Seunghye;Woo, Sungwoo;Lee, Kihak
    • Geomechanics and Engineering
    • /
    • v.21 no.6
    • /
    • pp.583-598
    • /
    • 2020
  • This study is attempted to propose a new hybrid artificial intelligence model called integrative genetic algorithm with multivariate adaptive regression splines (GA-MARS) for settlement prediction of shallow foundations on sandy soils. In this hybrid model, the evolution algorithm - Genetic Algorithm (GA) was used to search and optimize the hyperparameters of multivariate adaptive regression splines (MARS). For this purpose, a total of 180 experimental data were collected and analyzed from available researches with five-input variables including the bread of foundation (B), length to width (L/B), embedment ratio (Df/B), foundation net applied pressure (qnet), and average SPT blow count (NSPT). In further analysis, a new explicit formulation was derived from MARS and its accuracy was compared with four available formulae. The attained results indicated that the proposed GA-MARS model exhibited a more robust and better performance than the available methods.

Numerical Simulation of Ground Expansion Induced by Pulse Discharge Technology (펄스 방전 기술에 의한 지반 확공 현상 수치해석 모사)

  • Park, Hyun-Ku;Lee, Seung-Rae;Kim, Seon-Ju;Cho, Gyu-Yeon
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.25-34
    • /
    • 2010
  • In the present paper, a numerical study was carried out to simulate ground expansion induced by an application of pulse discharge technology. Based on laboratory pulse discharge tests, the characteristics of shockwave were investigated, and then the laboratory tests were numerical1y simulated using underwater explosion model implemented in a coupled acoustic-structural finite element analysis. In addition, for clayey soils, the expansion of ground was also studied using soil properties obtained from empirical correlations with SPT N values. It was found that the calculation results well agreed with the field test results.

Study on the Fractures Types of PHC Pile by Impact Load of Follower (보조말뚝의 충격하중에 의한 PHC말뚝의 파손유형 고찰)

  • Seo, Dong-Nam;Choi, Sang-Ho;Kim, Jin-Sik;Kim, Min-Kab;Lee, Dong-Hyeon;Cho, Seong-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.144-145
    • /
    • 2021
  • This study analyzed the cases of cracks in piles due to the use of followers under construction conditions where water exists inside the piles, and confirmed whether the piles were cracked through a field test simulating the construction conditions in which water pressure inside the piles was generated by a hammer. According to the construction case, under the construction condition where the pile length is 20% to 30% shorter than the drilled length, about 80% cracks occur, so there is a high possibility of cracking due to water inside the pile. A field test was conducted to confirm the type of pile failure due to hammer under the construction condition in which water exists inside the pile. The pile head was not destroyed by the compressive load, and one or more longitudinal cracks occurred along the PC steel wire. The closed end pile generates water pressure by hammer. the follower and cushion(compression plywood) must be drilled at least 0.4D. It is expected that improved quality control will be possible as the water pressure inside the pile is reduced.

  • PDF

A Case Study of Underpinning for Building Settlement Reduction (건물 침하방지를 위한 Underpinning 사례연구)

  • 박병기;이인모
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.10a
    • /
    • pp.57-62
    • /
    • 1993
  • Settlements of maximum 23cm have occurred in and Apartment building consturcted on a fill layer with pile foundations. The main reason of the settlements was due to the negative skin friction applied to the pile, and settlement of adjacent ground since most pile tips are acted as a floating foundation founded on the stratum where the SPT N value was mostly less than 30. To underpin this building, the Jumbo Special Pile grouging was adopted, and instrumented data showed little differential settlement after the JSP underpinning.

  • PDF

Empirical Estimations of Soil Constants Using Standard Penetration Test N Value (표준관입시험 N값을 활용한 지반정수의 경험적 산정)

  • Gang, ByeungJu;Hwang, Bumsik;Cho, Wanjei
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.6
    • /
    • pp.5-12
    • /
    • 2018
  • Domestic design manuals provide various empirical relationships of design parameters of soils with N values from the Standard Penetration Test (SPT), which can be widely used in the basic design process as well as during the construction process. However, the currently used empirical relationships are based on the data from foreign countries and are rarely evaluated with domestic data with currently used site investigation techniques. Therefore, in this study, those empirical relationships and conversion tables are evaluated with the geotechnical information in the Integrated DB Center of National Geotechnical Information and new empirical relationships are newly proposed with the consideration of domestic geotechnical conditions.

Comparison of the methods used in determining the pile design load (말뚝의 설계하중 결정방법에 대한 비교)

  • 이명환;윤성진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1992.03a
    • /
    • pp.69-102
    • /
    • 1992
  • The estimation of pile bearing capacity is important since the design details are determined from the result. There are numerous ways of determining the pile design load, but only few of them are chosen in the actual design. According to the recent investigation in Korea, the formulae proposed by Meyerhof based on the SPT N values are most frequently chosen in the design stage. During construction pile driving formulae are used and sometimes the pile loading tests are performed. In this paper the three methods are studied and compared. It is concluded that except the estimation made by pile loading test, the reliability of estimation is very poor. And the analysis of pile loading test would involve serious errors unless the end bearing capacity is measured separatly from the skin friction capacity. It is thus suggested that the separate measurement of end bearing capacity and skin friction capacity is the most reliable way of determining the pile design load.

  • PDF

Deduction of Correlations between Shear Wave Velocity and Geotechnical In-situ Penetration Test Data (전단파속도와 지반공학적 현장 관입시험 자료의 상관관계 도출)

  • Sun, Chang-Guk;Kim, Hong-Jong;Chung, Choong-Ki
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.12 no.4
    • /
    • pp.1-10
    • /
    • 2008
  • Shear wave velocity($V_S$), which can be obtained using various seismic tests, has been emphasized as representative geotechnical dynamic characteristic mainly for seismic design and seismic performance evaluation in the engineering field. For the application of conventional geotechnical site investigation techniques to geotechnical earthquake engineering, standard penetration tests(SPT) and piezocone penetration tests(CPTu) together with a variety of borehole seismic tests were performed at many sites in Korea. Through statistical modeling of the in-situ testing data, in this study, the correlations between $V_S$ and geotechnical in-situ penetrating data such as blow counts(N value) from SPT and piezocone penetrating data such as tip resistance ($q_t$), sleevefriction($f_s$), and pore pressure ratio($B_q$) were deduced and were suggested as an empirical method to determine $V_S$. Despite the incompatible strain levels of the conventional geotechnical penetration tests and the borehole seismic tests, it is shown that the suggested correlations in this study are applicable to the preliminary estimation of $V_S$ for Korean soil layers.

Evaluation of Structural Stability of Plastic Greenhouses with Steel Spiral Piles on Reclaimed Lands (간척지에서 강재 나선말뚝기초를 적용한 플라스틱 온실의 안전성 평가)

  • Yum, Sung Hyun;Lee, Won Bok
    • Journal of Bio-Environment Control
    • /
    • v.26 no.1
    • /
    • pp.27-34
    • /
    • 2017
  • This study was carried out to estimate structural stabilities in respect of ground footings of plastic greenhouses on reclaimed lands. A 6m-wide multi-span plastic greenhouse with steel spiral piles as well as two 8.2m-wide single-span greenhouses with steel spiral piles and continuous pipe foundation respectively were built up on a reclaimed land with a SPT N-Value of 2 and measured how much the greenhouses were lifted up and subsided. In addition, the uplift capacity of three kinds of spiral piles(${\phi}50$, ${\phi}75$ and ${\phi}100$) was determined on a nearby reclaimed land. The results showed that the greenhouses with spiral piles had a slight vertical displacement like moving up and down but the scales of the rising up and sinking were negligible when compared to that of the greenhouses. The vertical displacement of the multi-span greenhouse ranged from +9.0mm(uplift) to -11.5mm(subsidence). As for the single-span greenhouses with spiral piles and continuous pipe foundation, the measurements showed that it varied from +1.3mm to -7.7mm and from +0.9mm to -11.2mm, respectively. The allowable uplift capacity of spiral piles could all be determined under criteria of ultimate load and accordingly had a value of 0.40kN, 1.0kN and 2.5kN, respectively. It was not entirely certain enough to make a final judgement on structural stabilities in respect of ground footings, it appeared likely however that the greenhouses with steel spiral piles was tentatively observed without any problems on reclaimed lands within the period.