A Review of Salvage Archaeology in Korea and a Joint Research and Excavation Plan for North Korean Cultural Heritage (남북 문화유산 조사 현황과 공동조사를 위한 제언)

  • Choi, Jongtaik;Seong, Chuntaek
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.2
    • /
    • pp.20-37
    • /
    • 2019
  • Three Inter-Korea summits and a North Korea-USA summit that were previously unexpected provide a basis for an optimistic outlook for the future development of Korean archaeology. While Korean archaeology has witnessed a great advance since the mid-20th century, it also exhibits significant weaknesses in explaining cultural changes in prehistory and the early historical period in the Korean Peninsula due to the paucity of information on archaeological evidence of North Korea. Recent development of favorable conditions for research and excavations of North Korean cultural heritage could be a valuable opportunity for Korean archaeology to overcome the current adversity. Especially, given the expected large-scale SOC industrial project in North Korea, we need to prepare for the systematic research and excavation of archaeological materials. The present essay attempts to provide a suggestion for the joint archaeological expeditions to excavate and manage cultural resources in North Korea based on a critical review of previous salvage excavations in South Korea, such as those conducted before the construction of the Korean rapid transit railway system (KTX). We suggest that professional archaeologists should be included in the project and oversee the planning and design of road and railway constructions and other SOC projects in order to minimize the cost of trial and error processes that were well exemplified by the KTX salvage excavations. The Korean Archaeological Society and North Korean Archaeological Society may organize a common association that will supervise joint archaeological expeditions. Importantly, The Korean Archaeological Society and other related institutions should prepare to build an organization that conducts impending archaeological excavation in North Korea. While we likely face challenges and difficulties during the various stages of archaeological research and excavations in North Korea, only through thorough and systematic preparation can we avoid the destruction of valuable cultural heritage and find an opportunity for the further development of Korean archaeology.

Problems and Solutions for the Private-funded Railroad Station Project Management (철도 민자역사 사업수행체계 개선방안)

  • Park Chan-Sik;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.172-180
    • /
    • 2004
  • Recently, there are growing concerns on the introduction of private financing in railroad station construction project. But private-funded station project does not have the efficient delivery system. This study is focused on the recommended solutions about the private-funded station project management. Through the literature survey and interview, it is investigated and analyzed that project management has the problems. The problems are classified as 2 areas: law & regulations and job practice. The problems in law & regulations are a lowing on the profitability, and an unreasonable project team selection process. Job practice has problems such as delaying in authorization process, and inferior feasibility analysis. The study suggests several recommended solutions related to the problem areas. That are as follows: the efficient return of investment system, the project financing system, the professional project management, the benchmarking team operation, and the cut down on discussion period

Law on Private investment in infrastructure on the Business structure issues (사회기반시설에 대한 민간투자법상 사업구조 쟁점에 관한 고찰)

  • Yoon, Kwang-Ho
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.8 no.5
    • /
    • pp.679-686
    • /
    • 2013
  • Private investment business, government, the introduction of private capital and technology, and private sewage that due to the mutual benefit monetize using a stable government's public goods is still active. Internationally in the 1980s, the 1990s, the case of Korea, the social infrastructure, such as roads, ports, airports, business increased. This study is part of the overall consideration of the Act on Private Participation of private investment projects and improve on the points at issue by deriving the direction you want to achieve the purposes of the Act on Private Participation "that contribute to the national economy and promote private investment.

A Study on the Improvement of Item for Discrimination Increasing in Post Evaluation of Public Building Construction Project (공공건축공사 사후평가 변별력 향상을 위한 항목개선 연구)

  • Yoon, Tai-Hyong;Lee, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.21-31
    • /
    • 2011
  • The Ministry of Land, Transport & Maritime Affairs(former-The Ministry of Construction and Transportation)establish & promulgated the guide line of The Law of Post Evaluation on May 10, 2001(Article 58824-318) to public construction project under the Operation Law of Construction Engineering Management the 18 clause of Article 38 in order to induce & collect useful data about construction project when plan new similar project in the future about the initial planning phase, former and past accomplished businesses to construction works, results, efficiency, effectiveness. Ever since The Ministry revised 5 times, the former contents are composed for SOC, big volume civil project, and revised contents Article 2010-14(Jan 15, 2010) included some architectural project, but that was not definite the evaluation contents, direction & objective standard. So evaluation index implements are ambiguous about accomplished project. This research arranged the correctness evaluation indicators, criterions for decide the grades in order to helpful informations for similar architectural project in the future.

A Study For An Improved BTL Project Delivery Method (BTL 사업주체별 문제분석과 해결방안에 관한 연구)

  • Kim, Chang-Duk;Park, Hye-Sin;Lee, Mun-Jae;Yu, Jeong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.53-63
    • /
    • 2006
  • Since 2005, the government began to introduce and promote a new project delivery system, BTL(Build, Transfer, and Lease), in order to provide high level of public services for the upgraded quality of life and to boost the domestic and local construction economy. However, the lack of experiences in the new system by the constituents from diverse economic sectors brought a number of drawbacks from each constituent's perspective such as improperly low earning rate, excessive expenses for preparation of the project proposal, imbalanced regulations, heavy cost and procedures to establish SPC, the ineffective structure of the consortium, the short-term oriented evaluation criteria for the selection and so forth. These drawbacks turned out to be obstacles for the successful BTL projects. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the changes to resolve those for the improvement and finally to deliver the successful BTL projects for the diverse public owners.

A Study on Efficiency of Mixed Model (BTO+BTL) for Public-Private Partnership Projects (민간투자사업 혼합방식(BTO+BTL)의 효율성에 관한 연구)

  • Kim, Do-Il;Jin, Run-Zhi;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.53-63
    • /
    • 2012
  • Korean Public-Private Partnership, mainly implemented using BTO (Build-Transfer-Operate) and BTL (Build-Transfer-Lease) methods, has contributed in increasing benefits of the people by providing the needed public services in a timely and efficient manner. It has also induced flexible national fiscal management. However, in addition to the repeal of the Minimum Revenue Guarantee (MRG) program in 2009, changes in business environment including recent financial crisis aggravated financial situation in pursing PPPs, resulting in significant contraction of BTO projects. Therefore, the new methods are to be suggested and applied to overcome this situation. This paper seeks to find ways to apply "Mixed Model," characterized as the compound of BTO and BTL, two different implementation methods of PPPs, as an enhanced burden-sharing mechanism.

A Development of the Risk Factor Dictionary for the Private Finance Construction Project (민간투자 건설사업 위험요인사전 개발)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.152-160
    • /
    • 2007
  • Recently, the government is very active to secure the financial resources by inducement of the private investment in fulfilling an extension of the SOC facilities. One of the reasons that the private investors hesitate to put money into the private finance projects, however, is the lack of knowledges about various risks to be possibly incurred during the project execution. This research was performed as one of the preparation works in order for a A engineering company to act as a prime contractor of the project management service in the private finance project, and finally developed the risk factor dictionary as a new concept to satisfy the requirement of a A company and overcome a limit of the existing risk checklists. Although the risk factor dictionary looks like the only simplified table to be the risk factors identified in three dimensions, the impacts and response strategies expressed in narrative and multi-items, and the responsible parties indicated, it has great meanings to get a lot of direct and indirect accomplishments over the simplified table during the development process.

Comparison Analysis on the Informatization Level between Construction CALS and Other Sectors (건설CALS의 정보화수준과 타 부문의 비교분석)

  • Jung, In-Su;Kim, Nam-Gon;Kim, Jin-Uk;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.26-37
    • /
    • 2009
  • Ministry of Land, Transportation and Marine Affairs(MLTM) has implemented Construction CALS project for improving productivity of construction industry and for making construction project management efficient by responding to informatization and knowledge base society in 21st century. CALS has beeb applied successfully to projects form MLTM, however, the outcomes of Construction CALS hasn't been recognized. In addition, there is no way to find how high the level of Construction CALS is when it is compared with other SOC informatization projects. This study found out the informatiziation level of Construction CALS by using the evaluation index proposed in the former study, and by comparing with other sectors. The evaluation on the level was implemented in the three parts such as informatization infrastructure(network, hardware, standardization, data, informatization, informatization security), informatization utilization(information usage, IT performance), and informatization support(informatization goal, organization of informatization, informatization investment, informatization education), and then, this evaluation was compared with "Assessment for level of industry information system", "Assessment for level of small and midium sized industry information system", and "IICI(Informatizaion Index for the Construction Industry)". With the result from the comparison, this study produced superior factors and inferior factors for each sector. These results are expected to be useful for prioritizing budget allocation by finding out the informatization level of Construction CALS.

종합건설업체 탐방 ⑨-「인간존중, 사회기여, 미래도전」이념으로 기반산업 중추 이룬 한라건설(주)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.1 s.198
    • /
    • pp.65-71
    • /
    • 2007
  • 한라건설(주)은 1980년 창립한 이래 국내외 토목, 건축, 주택, 플랜트, 환경 사업 등 각 분야에서 눈부신 발전을 거듭하여왔다. 특히 최고의 품질과 경쟁력으로 각종 도로, 철도, 항만, 공항 등 토목공사와 사회기반시설(SOC) 건설사업에 참여함으로써 국가기반시설을 조성하였다. 2006년 1조3500억원 수주, 8300억원 매출 이라는 성과를 거뒀고 2007년 1조6000억원 수주, 9200억원 매출을 목표로 하고 있다. 또한 자연 친화적인 사계절 아름다운 아파트‘한라비발디’를 통하여 소비자의 다양한 요구를 반영, 쾌적하고 편안한 주거환경 조성에 심혈을 기울이고 있다. 「 인간존중, 사회기여, 미래도전」이라는 경영이념을 바탕으로 급변하는 환경에 적극적으로 대처하고, 새로운 기술개발, 우수인재 육성, 핵심경쟁력 강화를 통해 미래를 대비하는 한라건설(주)의 행보는 오늘도 계속되고 있다.

  • PDF

Power Transmission Line Routing Using GIS (지리정보시스템을 이용한 송전선로 경과지선정)

  • Min, Kyu-Ho;Park, Byoung-Won;Roh, Jae-Deok;Oh, Chol-Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.5 no.1 s.9
    • /
    • pp.119-128
    • /
    • 1997
  • With the rapid socioeconomic change the siting of SOC is getting more difficult due to so-called NIMBY syndrome. The objective methodology using GIS was かid as a case study to solve the complexity of the power transmission line routing. We anticipated that the new optimization of transmission routing would be the efficient and reasonable way in getting the public acceptance and settling the public complaints from transmission construction project in our country.

  • PDF