• Title/Summary/Keyword: SCADA data

Search Result 207, Processing Time 0.028 seconds

The Development of Interoperability Tester for the IEC 61850 based on TTCN-3 (TTCN-3 적합성 시험 언어를 이용한 IEC61850 상호 연동성 시험기 개발)

  • Song, Byung-Kwen;Lee, Suk-Hee
    • Journal of IKEEE
    • /
    • v.14 no.3
    • /
    • pp.210-218
    • /
    • 2010
  • TTCN-3(Testing & Test Control Notation Version 3) is the international standard testing language defined by ETSI in 2001. TTCN-3 is generally used for protocol conformance test, but it is also possible to be applied to the platform and API tests based on CORBA. Moreover, it can be also applied to the various testings such as interworking testing, repetition testing, platform testing, etc. IEC 61850 is the protocol proposed for SAS(Substation Automation System) of SCADA(Supervisory Control And Data Acquisition) system. In this paper, a IEC 61850 interoperability Tester based TTCN-3 is developed under the Window environment. IEC 61850 Server Simulator of Linux operating system is used as SUT(System Under Test). Conformance testing items in this paper are the Positive test case_Srv5 of "Server, Logical device, Logical node, and data model" in the testing group of "IEC 61850 - Part10" document.

Long term monitoring of a cable stayed bridge using DuraMote

  • Torbol, Marco;Kim, Sehwan;Shinozuka, Masanobu
    • Smart Structures and Systems
    • /
    • v.11 no.5
    • /
    • pp.453-476
    • /
    • 2013
  • DuraMote is a remote sensing system developed for the "NIST TIP project: next generation SCADA for prevention and mitigation of water system infrastructure disaster". It is designed for supervisory control and data acquisition (SCADA) of ruptures in water pipes. Micro-electro mechanical (MEMS) accelerometers, which record the vibration of the pipe wall, are used detect the ruptures. However, the performance of Duramote cannot be verified directly on a water distribution system because it lacks an acceptable recordable level of ambient vibration. Instead, a long-span cable-stayed bridge is an ideal test-bed to validate the accuracy, the reliability, and the robustness of DuraMote because the bridge has an acceptable level of ambient vibration. The acceleration data recorded on the bridge were used to identify the modal properties of the structure and to verify the performance of DuraMote. During the test period, the bridge was subjected to heavy rain, wind, and a typhoon but the system demonstrates its robustness and durability.

Development of Cooperated Control System for Multiple FACTS in KEPCO Power Systems (다기의 FACTS 기기 협조제어 시스템 개발)

  • Chang, Byung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.10
    • /
    • pp.1726-1730
    • /
    • 2008
  • In this paper, the application schemes for coordinated control system of multiple FACTS were presented to enhance the voltage stability around the metropolitan areas. In order to coordinated control of FACTS devices, f-V analysis method which is one of the indices for voltage stability was performed with real time network data which is transferred from SCADA/EMS system. If the system is unstable after contingencies, the new operation set-point of FACTS would be determined using bus sensitivity from tangent vector at voltage instability point. Otherwise, we would determine the new operation set-point of FACTS for considering economical operation, like as active power loss minimization using Optimal Power Flow algorithm. In simulation, the SCADA/EMS 2007's data are used for studying the coordinated control algorithm of multiple FACTS devices that is installed or will be installed in KOREA power system

Development of the Automative Correction System for the Digital Over-current Relay With Distribution System (배전계통에서의 디지털 과전류 계전기 자동 정정 시스템 개발)

  • Baek, Young-Sik;Lee, Ho-Jun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.4
    • /
    • pp.677-682
    • /
    • 2007
  • In the distribution system, Change of system happens frequently. However, most of the relays are operated manually by a person or not changed when system changed. So, when fault happened, a case that relaydoes not act rapidly happens. Also, in current power system, digital relays are used because of digitization of relay. Digital relay has very many advantages than existing analog relay. One of these advantages is that communication is available and easily can make characteristic curve. If specific values are sent to a relay by communication, A relay can make suitable characteristic curve according to the value. In this paper, by using voltages and currents measured by relay, state of CB(Circuit Breaker) and these relays, SCADA(Supervisory Control And Data Acquisition) system that control and correct characteristic curve of overcurrent relay at system change by using HMI(Human Machine Interface) is proposed.

The Study on DSA of Intergrated Operating System (통합운영체계의 DSA 적용 연구)

  • Cho, Nam-Bin
    • Proceedings of the KIEE Conference
    • /
    • 2002.07d
    • /
    • pp.2322-2324
    • /
    • 2002
  • Korea Water Resources Corporation (KOWACO) operates nine hydroelectric power stations on the Han River, Nakdong River, Geum River & Seomjin River Areas. KOWACO will take the lead in improving the efficiency of water resources supply in this parer, KOWACO Generation Intergrated Operating System(GIOS) project will improve the generating plant, hydraulic structures, switchgear, and station controls, alarms and services for unmanned remote controlled operation by modern intergraed SCADA system. Mordern SCADA is used to cover all computer systems designed to perform the following main functions: - to collect data from industrial plant devices. - to process and perform calculations on the collected. - to present collected and derived data on displays on. - to accept commands entered by human operators and act on them such as sending control commands to plant devices.

  • PDF

The Development of Power System Automation based on the CAN Communication Protocol (CAN 통신을 기반으로한 전력 시스템 자동화 구축)

  • Park, Jong-Chan;Kim, Beung-Jin
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.52 no.3
    • /
    • pp.95-99
    • /
    • 2003
  • In this paper, the power system automation based on CAN communication protocol is introduced. Along with digitalization of electrical device, the various on-line services such as remote control, remote monitoring, remote parameter setting, fault data recording and remote diagnostic have been realized and become available. Therefore, it is necessary for those electrical devices to have real-time and reliable communication protocols. Author proposes DNPC(Distributed Network Protocol with CAN) which is proper to the power system SCADA (Supervisory Control And Data Acquisition) and DCS (Distributed Control System). The physical and datalink layer of DNPC protocol consists of the CAN2.0B which has the real-time characteristics and powerful error control scheme. As the transport and application layer, DNP3.0 is adopted because of its flexibility and compatible feature. Using the DNPC protocol, the power system automation is realized.

DLMS SCADA System based on TETRA (TETRA 기반 DLMS 원방감시 시스템)

  • Song, Byung-Kwen;Lee, Suk-Hee
    • Journal of IKEEE
    • /
    • v.13 no.3
    • /
    • pp.95-102
    • /
    • 2009
  • TETRA(TErrestrial Trunked RAdio) is wireless communication system generally adopted to public network and backbone network, as the technology of Trunked Radio System specified by ETSI(European Telecommunications Standards Institute) and currently adopted to the Electric Power IT Backbone Network in Korea. DLMS(Device Language Message Specification) is used in order to meter an electric measuring instrument value. In this paper, DLMS Server and Client simulator are used based on Window operating system. The multi-functional gateway, which transforms the communications based on RS-232C between DLMS Server Simulator and Client Simulator to the one based on TETRA PEI(Peripheral Equipment Interface), is developed such that DLMS SCADA(Supervisory Control And Data Acquisition) system is constructed based on TETRA.

  • PDF

Development of intelligent distribution automation system with the function of substation SCADA, power quality monitoring and diagnosis condition monitoring (SCADA 기능과 전기품질 온라인 감시 및 배전설비 열화감시 기능을 갖는 배전지능화 시스템 개발)

  • Ha, B.N.;Lee, S.W.;Shin, C.H.;Seo, I.Y.;Jang, Mun-Jong;Park, M.H.;Yun, G.G.;Song, I.K.;Lee, B.S.;Lee, J.C.;NamKoong, W.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1776-1786
    • /
    • 2010
  • Intelligent distribution automation system have total monitoring and control capability. The system covers substation, distribution network, distributed generations and customers at HV system. Various intelligent distribution facilities installed at distribution systems have voltage sensor, current sensor, aging monitoring sensor. Intelligent Feeder Remote Terminal Unit (IFRTU) tied to intelligent distribution facilities process information from facilities and it checks information of fault, power quality and aging of distribution facilities. The information is transmitted to master station through communication line. The master station have remote monitoring system covers substation, distribution network, distributed generations and customers. It also have various application programs that maintain optimal network operation by using information from on-site devices.

An Integrated Fault Diagnosis System for Power System Devices using Meta-inference and Fuzzy Reasoning (메타-인퍼런스와 퍼지추론을 이용한 송변전 설비의 통합 고장진단 전문가 시스템)

  • 이흥재;임찬호;김광원
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.12 no.2
    • /
    • pp.38-44
    • /
    • 1998
  • This paper presents an integrated fault diagnosis expert system to assist SCADA operators in local control centers which controls unmanned distribution substations in a power system. The proposed system diagnoses various faults occurred in both substation devices and transmission devices. The system can be easily installed without disturbing main SCADA system. The system simply shares the dynamic information including alarms with main SCADA using dual data link interface. And the proposed expert system utilizes the fuzzy reasoning process in order to consider the uncertainty factor. The system is developed using a low cost personal computer owing to the special modular programming and the meta-inf!'lrence structure. Case studies showed a promising possibility.bility.

  • PDF

Comparison of SIEM Solutions for Network Security (네트워크 보안을 위한 SIEM 솔루션 비교 분석)

  • Lee, Jong-Hwa;Bang, Jiwon;Kim, Jong-Wouk;Choi, Mi-Jung
    • KNOM Review
    • /
    • v.22 no.1
    • /
    • pp.11-19
    • /
    • 2019
  • As technology develops, the latest security threats on the network applied to users are increasing. By attacking industrial or corporate systems with malicious purposes, hackers cause many social problems such as confidential information leakage, cyber terrorism, infringement of information assets, and financial damage. Due to the complex and diversified threats, the current security personnel alone are not enough to detect and analyze all threats. In particular, the Supervisory Control And Data Acquisition (SCADA) used in industrial infrastructures that collect, analyze, and return static data 24 hours a day, 265 days a year, is very vulnerable to real-time security threats. This paper introduces security information and event management (SIEM), a powerful integrated security management system that can monitor the state of the system in real time and detect security threats. Next, we compare SIEM solutions from various companies with the open source SIEM (OSSIM) from AlienVault, which is distributed as an open source, and present cases using the OSSIM and how to utilize it.