• Title/Summary/Keyword: Running current

Search Result 425, Processing Time 0.031 seconds

Computer Algorithm for the Loadflow of the DC Traction Power Supply System (도시철도의 DC급전시스템 해석 알고리즘)

  • 정상기;홍재승
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.78-85
    • /
    • 2000
  • Computer algorithms for the loadflow of the DC traction power supply system are examined. Algorithms to solve the nodal equation are reviewed and the two iterative methods to solve the nonlinear nature of the loadflow are analyzed and tested, which are so called conductance matrix method and current vector iterative mettled. The result of the analysis tells that the current vector iterative method makes faster convergency and needs less computing time, and it is verified by the test running of the programs based on each of the iterative methods.

  • PDF

Calculation methods for the rail potential rise and the stray current in the ungrounded DC traction system (비접지 급전시스템에서의 레일전위상승과 누설전류 계산)

  • Chung, Sang-Gi;Park, Hyun-Joon;Kwon, Sam-Young;Bai, Chang-Han
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.631-635
    • /
    • 2006
  • DC traction power system is operated ungrounded to minimize the stray current. This causes rail potential increase and makes hazardous condition to the person in touch with running rails. To prevent the hazardous condition, maximum allowable limits on rail potential rise are set by regulations in advanced foreign countries. In this paper, the simplified calculation methods for the rail potential rise and the stray currents are discussed.

  • PDF

A case study of remote wireless monitoring system for stray current due to subway system (지하철 누설전류 무선 원격 감시시스템 적용 사례)

  • Bae, Jeong-Hyo;Ha, Yoon-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2006.07d
    • /
    • pp.1817-1818
    • /
    • 2006
  • In present, most of metallic structures (gas pipeline, oil pipeline, water pipeline, etc) are running parallel with subway in Seoul and Pusan.In this case, subway system make a stray current due to electrical corrosion on metallic structures. The owner of metallic structures has a burden of responsibility for the protection of corrosion and the prevention against big accident such as gas explosion or soil pollution and so on. So, they have to measure and analyze the data about P/S(Pipe to Soil) potential, amplitude of stray current, point of source of stray current and so on. In this paper, results of development about Wireless Remote Monitoring and Control System on Underground Pipeline in Stray Current Conditions are presented. And also field test data should be reporting.

  • PDF

Numerical Investigation on Permanent-Magnet Eddy Current Loss and Harmonic Iron Loss for PM Skewed IPMSM

  • Lim, Jin-Woo;Kim, Yong-Jae;Jung, Sang-Yong
    • Journal of Magnetics
    • /
    • v.16 no.4
    • /
    • pp.417-422
    • /
    • 2011
  • This paper presents the characteristics of PM eddy current loss and harmonic iron loss for PM step-skewed Interior Permanent Magnet Synchronous Motor (IPMSM) with concentrated windings and multi-layered PM under the running condition of maximum torque per ampere (MTPA) and flux-weakening control. In particular, PM eddy current loss and harmonic iron loss in IPMSM have been numerically computed with three-dimensional Finite Element Analysis (3D FEA), whereby IPMSM with concentrated windings and multi-layered PM has been designed to identify the optimized skew angle contributing to the reduced PM eddy current loss and torque ripples, while maintaining the required average torque. Furthermore, numerical investigation on PM eddy current loss and iron loss at MTPA and flux-weakening control has been carried-out in terms of PM step-skew.

DATA LOGGER APPARATUS FOR MEASUREMENT STRAY CURRENT OF SUBWAY AND POWER LINE (지하철과 전력선의 누설전류 측정을 위한 저장형 데이터 계측장치)

  • Bae, Jeong-Hyo;Ha, Yun-Cheol;Ha, Tae-Hyeon;Lee, Hyeon-Gu;Kim, Dae-Gyeong
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.731-734
    • /
    • 2003
  • In present, most of metallic structures(gas pipeline, oil pipeline, water pipeline, etc) are running parallel with subway and power line in seoul. Moreover subway system and power line make a stray current due to electrical corrosion on metallic structures. The owner of metallic structures has a burden of responsibility for the protection of corrosion and the prevention against big accident such as gas explosion or soil pollution and so on. So, they have to measure and analyze the data about P/S(Pipe to Soil) potential, amplitude of stray current, point of source of stray current and so. In this paper, results of development about data logger apparatus for measurement stray current of subway and power line are presented.

  • PDF

A Study on the Current Status of Metaverse Utilization in University Libraries and Librarian Perceptions (대학도서관의 메타버스 활용 현황 및 사서 인식조사 연구)

  • Jae-Ryeong, Oh;Sung-Sook, Lee
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.33 no.4
    • /
    • pp.159-180
    • /
    • 2022
  • Recently, services using metaverse in various fields are increasing, the technology is behind the metaverse is rapidly developing. Consequently, it is necessary to provide metaverse services in university libraries. Therefore, this study examined the status of using metaverse in domestic university libraries and the librarians response to it. To this end, the cases of foreign libraries and domestic university libraries were analyzed. Furthermore, an interview was conducted with nine librarians of the university library, who has running metaverse service, to collect data on the current status of the university library metaverse and perceptions of it to identify difficulties and requirements of running the service. Based on the results, it is proposing to get the differentiation of metaverse service, acquire professionals, activate education, expand the browsing feature, and select proper platforms as a way to vitalize the metaverse of domestic university libraries. It is expected that this study will help to running or planning the metaverse service of the university library.

Study on the Development of an Expressway Hard Shoulder Running Algorithm Using Reinforcement Learning (강화학습 기반 고속도로 갓길차로제 운영 알고리즘 개발 연구)

  • Harim Jeong;Sangmin Park;Sungkwan Kang;Ilsoo Yun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.4
    • /
    • pp.63-77
    • /
    • 2023
  • This study applies reinforcement learning to effectively operate expressway hard shoulder running (HSR). An HSR algorithm was developed, and its effectiveness was evaluated using the VISSIM microscopic simulation program. The simulation evaluated two aspects: mobility and safety. The DQN-based HSR algorithm found speed improvement of up to 26 km/h. Compared to the current method, the difference in the number of conflicts was not significant. Considering the results, a DQN-based HSR operation has a clear effect, and it is necessary to consider adjusting the current operational criteria.

A Study on the Interface between a G7 Pantograph and a KTX Catenary System in Preparation for G7 On-line Tests in the Korea High Speed Test Track (고속 시험선 구간에서의 G7 본선 시운전에 대비한 G7 팬터그래프와 KTX 가선계와의 인터페이스 연구)

  • Cho, Yong-Hyeon;Kyung, Jin-Ho;Hur, Shin;Choe, Kang-youn;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.557-570
    • /
    • 2000
  • It is necessary to perform a study on the interrace between a G7 pantograph and a KTX catenary system prior to G7 on-line tests in the Korea High Speed Test Track in order to predict how high current collection quality can be obtained during the on-line tests and check if safety problems shall be caused b)Y the tests or not. According to the simulation results, current collection quality of the G7 pantograph at 350km/h is lower than that of a GPU pantograph at 300km/h, but the contact wire uplifts and average contact forces are within the safe-zone. In addition, the ratio of running speed (350km/h) to safe running. Therefore, the G7 on-line tests at 350km/h in the Korea High Speed Test Track is expected not to cause the safety problem.

  • PDF

A Study on the Removing Method of Hunting by Equalizing Line during Parallel Running of alternator Equipped with converter (컨버터가 내장된 교류발전기 병렬운전중의 헌팅을 균압선을 이용해 제거하는 방법에 관한 연구)

  • 노창주
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.23 no.3
    • /
    • pp.352-359
    • /
    • 1999
  • This paper is a research for removing the alternators hunting which came about during the par-allel running. The four-pole six-phase alternator is equipped with the converter made out of twelve diodes to rectify all the waves. The hunting came about during the battery charging due to the hunting inducing point existed in r. p. m band 1575[rpm-1690[rpm] To remove the hunting inducing point We modified the four-pole six-phase alternator into the four-pole twevel-phase and increased the short-circuit ratio by decreasing the field coil pitch and increasing the field coil turns. But this method has two defects the first the alternator structure becomes complicating and the second the second the alternator equipped with the converter used in general purpose lately such as the car alternator can not be run in parallel wlthout modifying. To remove the defects the equalizing line was connected between the same phase of the alterna-tor to flow the synchronizing current which syncronize the phases of generator electromotive forces by which the alternator can be run in parallel without reference to the hunting inducing point and without modifying.

  • PDF

Dynamic Analysis for Improvement of Running Stability of Rubber Tired AGT Localization Bogie (고무차륜 경량전철 국산화 대차의 주행안정성 향상을 위한 동특성 해석)

  • Eom, Beom-Gyu;Lee, Hi-Sung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.4
    • /
    • pp.307-317
    • /
    • 2012
  • The LRT(light rail transit) system, which has medium transport capacity between subway and bus is an advanced transportation system. It has many benefits like chap construction and operational cost down through driverless and flexible route planning. The rubber tired AGT(K-AGT) is a kind of LRT, which has rubber wheels and side guides. The side guides has many advantages, but brings vibration and noise problems from the friction between the guide rail and the wheels. This is the major source for the of passengers' discomfort. The purpose of this paper is to analyze dynamic characteries and running stability of the rubber tired AGT localization bogie if the AGT's speed is increased from 70 km/h to 80 km/h. The current design parameters of bogie suspension, as it is designed, was examined to satisfy the comfort index of the railway vehicle in performance test.