• Title/Summary/Keyword: Rock bridge

Search Result 101, Processing Time 0.022 seconds

Rock bridge fracture model and stability analysis of surrounding rock in underground cavern group

  • Yu, Song;Zhu, Wei-Shen;Yang, Wei-Min;Zhang, Dun-Fu;Ma, Qing-Song
    • Structural Engineering and Mechanics
    • /
    • v.53 no.3
    • /
    • pp.481-495
    • /
    • 2015
  • Many hydropower stations in southwest China are located in regions of brittle rock mass with high geo-stresses. Under these conditions deep fractured zones often occur in the sidewalls of the underground caverns of a power station. The theory and methods of fracture and damage mechanics are therefore adopted to study the phenomena. First a flexibility matrix is developed to describe initial geometric imperfections of a jointed rock mass. This model takes into account the area and orientation of the fractured surfaces of multiple joint sets, as well as spacing and density of joints. Using the assumption of the equivalent strain principle, a damage constitutive model is established based on the brittle fracture criterion. In addition the theory of fracture mechanics is applied to analyze the occurrence of secondary cracks during a cavern excavation. The failure criterion, for rock bridge coalescence and the damage evolution equation, has been derived and a new sub-program integrated into the FLAC-3D software. The model has then been applied to the stability analysis of an underground cavern group of a hydropower station in Sichuan province, China. The results of this method are compared with those obtained by using a conventional elasto-plastic model and splitting depth calculated by the splitting failure criterion proposed in a previous study. The results are also compared with the depth of the relaxation and fracture zone in the surrounding rock measured by field monitoring. The distribution of the splitting zone obtained both by the proposed model and by the field monitoring measurements are consistent to the validity of the theory developed herein.

Estimation of the Shaft Resistance of Rock-Socketed Drilled Shafts using Geological Strength Index (GSI를 이용한 암반에 근입된 현장타설말뚝의 주면저항력 산정)

  • Cho, Chun Whan;Lee, Hyuk Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1C
    • /
    • pp.25-31
    • /
    • 2006
  • It is common to use the unconfined compressive strength (UCS) of intact rock to estimate the shaft resistance of rock socketed drilled shaft. Therefore the most design manuals give a guide to use the UCS of rock core to estimate the shaft resistance of rock-socketed drilled shaft. Recently, however the design manuals for highway bridge (KSCE, 2001) and of AASHTO (2000) were revised to use the UCS of rock mass with RQD instead of the UCS of rock core so that the estimated resistance could be representative of field conditions. Questions have been raised in application of the new guide to the domestic main bed rock types. The intrinsic drawbacks in terms of RQD were comprised in the questions, too. As the results, in 2002 the new guide in the design manual for highway bridge (KSCE, 2001) were again revised to use the UCS of rock core to estimate the shaft resistance of rock-socketed drilled shafts. In this paper, various methods which can estimate the UCS of rock mass from intact rock core were reviewed. It seems that among those, the Hoek-Brown method is very reliable and practical for the estimation of the UCS of rock mass from rock cores. As the results, using the Hoek-Brown failure criterion a modified guide for the estimation of the shaft resistance of rock-socketed drilled shafts was suggested in this paper. Through a case study it is shown that the suggested method gives a good agreement with the measured data.

A Study on Behavior Analysis of Large-diameter Drilled Shaft by Design Methods in Deep Water Depth Composite Foundation (대수심 대형 복합기초에서 설계기법에 따른 대구경 현장타설말뚝의 거동 분석 연구)

  • Han, Yushik;Choi, Yongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.1
    • /
    • pp.5-16
    • /
    • 2015
  • In the long span bridge construction, construction cost portion of large scale marine foundation is about 40% (KICTEP, 2007). In this study, designs for deep water depth large composite foundation of a super long span cable-stayed girder bridge of prototype were performed by three design methods (ASD, LRFD, Eurocode) and the behaviors of a large diameter drilled shaft were analyzed and the 3D numerical analysis was performed. As a result, the soft rock socket lengths in allowable stress design estimation method were the longest. The soft rock socket lengths estimated by the design approach 2 among Eurocode and the LRFD were similar. The longer the socket length socketed in the soft rock was, the smaller the axial force acting on a large-diameter drilled shaft head was and the smaller the settlement of drilled shaft was.

Estimation of Stiffness Limit for Railway Bridge Vibration Serviceability (진동사용성을 고려한 철도교량구조물의 강성한계 분석)

  • Park, Kyung-Rock;Jeon, Bub-Gyu;Kim, Nam-Sik;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.80-85
    • /
    • 2008
  • In general, deflection limit criteria of bridge design specifications have been considered based on static serviceability and structural stability. Dynamic serviceability induced from bridge vibration actually has not been included in the criteria. Thus, it is necessary for comfort limit to be considered in order to check dynamic serviceability on bridge vibration. In this study, the comfort limit of bridge structures based on the RMQ and VDV considering the signal fluctuation effectively and the time duration exposed has been constructed. The comfort limit developed in time domain was verified by using vibration signals directly measured from the existing bridges. Comparing the developed comfort limit with the conventional ones defined in frequency domain, it is shown that the comfort limit developed in time domain would be more feasible for evaluating quantitatively the serviceability due to bridge vibration. Using the Bridge-train interaction analysis program, dynamic response of the bridge by the stiffness change were obtained for several railway bridges. And, a stiffness limit satisfying the bridge vibration serviceability was estimated by compared with comport limit. From the results, a new deflection limit on bridge structures satisfying the vibration serviceability could be proposed by comparing with the conventional deflection limit criteria.

  • PDF

Study on Large Diameter Steel-cased Piles Socketed in Weathered and Fresh Rocks (풍화암과 연암에 근입된 대구경 말뚝의 축하중지지 거동에 관한 연구)

  • Nam Moon-Seok;Lee Min-Hee;Choi Yong-Kyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.3
    • /
    • pp.5-11
    • /
    • 2006
  • Two large diameter steel cased piles (TS-1 and TS-2) were installed and load-tested with the maximum load of 2000 ton at Kwang-An grand bridge. One of the test piles (TS-1) was socketed into the fresh rock and the other test pile (TS-2) was socketed into the weathered rock. Most loads were carried by the weathered rock layer at the maximum applied load for the test piles. In addition, numerical studies were performed using PENTAGON 3D and ROCKET. Based on this study, the weathered rock layer provided sufficient side resistances and possibility of an alternative embedded layer if weathered rocks are deeply layered over fresh rock, which caused difficulties and cost in construction.

Numerical analysis of a complex slope instability: Pseudo-wedge failure

  • Babanouri, Nima;Sarfarazi, Vahab
    • Geomechanics and Engineering
    • /
    • v.15 no.1
    • /
    • pp.669-676
    • /
    • 2018
  • The "pseudo-wedge" failure is a name for a complex instability occurring at the Sarcheshmeh open-pit mine (Iran). The pseudo-wedge failure contains both the rock bridge failure and sliding along pre-existing discontinuities. In this paper, a cross section of the failure area was first modeled using a bonded-particle method. The results indicated development of tensile cracks at the slope toe which explains the freedom of pseudo-wedge blocks to slide. Then, a three-dimensional discrete element method was used to perform a block analysis of the instability. The technique of shear strength reduction was used to calculate the factor of safety. Finally, the influence of geometrical characteristics of the mine wall on the pseudo-wedge failure was investigated. The safety factor significantly increases as the dip and dip direction of the wall decrease, and reaches an acceptable value with a 10-degree decrease of them.

Seismic performance of a rocking bridge pier substructure with frictional hinge dampers

  • Cheng, Chin-Tung;Chen, Fu-Lin
    • Smart Structures and Systems
    • /
    • v.14 no.4
    • /
    • pp.501-516
    • /
    • 2014
  • The rocking pier system (RPS) allows the columns to rock on beam or foundation surfaces during the attacks of a strong earthquake. Literatures have proved that seismic energy dissipated by the RPS through the column impact is limited. To enhance the energy dissipation capacity of a RPS bridge substructure, frictional hinge dampers (FHDs) were installed and evaluated by shaking table tests. The supplemental FHDs consist of two brass plates sandwiched by three steel plates. The strategy of self-centering design is to isolate the seismic energy by RPS at the columns and then dissipate the energy by FHDs at the bridge deck. Component tests of FHD were first conducted to verify the friction coefficient and dynamic characteristic of the FHDs. In total, 32 shaking table tests were conducted to investigate parameters such as wave forms of the earthquake (El Centro 1940 and Kobe 1995) and normal forces applied on the friction dampers. An analytical model was also proposed to compare with the tested damping of the bridge sub-structure with or without FHDs.

Dynamic analysis of floating bridges under combined earthquakes and waves

  • Ikjae Lee;Moohyun Kim;Jihun Song;Seungjun Kim
    • Ocean Systems Engineering
    • /
    • v.14 no.2
    • /
    • pp.115-139
    • /
    • 2024
  • In this study, numerical study of a long, straight, side-anchored floating bridge with discrete pontoons subjected to combined earthquakes and waves is conducted. Ground motions with magnitude corresponding to 200 YRP (years return period) earthquake in South Korea are generated based on the spectral matching method from a past earthquake record in California. Several sensitivity studies are carried out for bridge end condition, for different site classes (hard rock S1 and soft and deep soil S5), and for three different excitations (earthquake only, wave only, and earthquake-wave combined). Bridge and pontoon motions, bending moments along the bridge, and mooring tensions are systematically examined through coupled time-domain simulations by commercial program OrcaFlex. The numerical results show that the impact of earthquakes on floating bridges is still of importance especially for soft soil although ground motions are less directly applied to the structure than fixed bridges.

Design and consturction of single drilled shaft foundation (단일 현장타설말뚝 기초의 설계 및 시공)

  • Jeon, Kyung-Soo;Kim, Kyung-Suk;Kim, Jeong-Yeul
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.86-100
    • /
    • 2006
  • The single drilled shaft foundation has been used in the other countries, but has not used in South Korea at all This foundation is very effective and economic method in South Korea which is easy to meet a good rock mass within 50m depth from the ground We have many experiences to construct 1.52 5m drilled shaft foundations and ability to construct 30m drilled shaft foundation without special efforts The soil behavior is nonlinear, but it can be proposed in linear in practical purpose on bridges. The elastic modulus of soil can be rationally obtained by the method of Road Bridge Design Manual in South Korea using the Schmertmann(1970)'s proposal, and the elastic modulus of rock can be obtained by the field test. In seismic design the column and drilled shaft must be restricted to the elastic design because the behavior of this foundation is flexible and the arrangement of the rebars makes the various defect In this paper the design criteria is compared with FHWA design criteria, and the design criteria is proposed in consistent with Road Bridge Design Manual in South Korea. The single drilled shaft foundation of a test bridge was constructed in the Iksan-Jangsoo highway, and we checked its stability, workability and economy

  • PDF

Stability Analysis on the Substructure of Abutment in Limestone Basin (석회암층 교대 하부 구조물의 안정성 해석)

  • 최성웅;김기석
    • Tunnel and Underground Space
    • /
    • v.12 no.2
    • /
    • pp.120-129
    • /
    • 2002
  • Natural cavitied were found at shallow depth during construction of a huge bridge in Cambro-Ordovician Limestone Basin in the central part or Korea. The distribution patterns of cavities in this area were investigated carefully with a supplementary field job such as a structural geological survey, a geophysical survey, and a rock mechanical test in laboratory or field. A structural geological mapping produced a detail geological map focusing the route of the Proposed highway. It suggested that there were three faults in this wet and these faults had an influence on the mechanism of natural cavities. Among many kinds of geophysical surveys, an electrical resistivity prospecting was applied first on the specific area that was selected by results from the geological survey. Many evidences far cavities were disclosed from this geophysical data. Therefore, a seismic tomography was tested on the target wet which was focused by results from the electrical resistivity Prospecting and was believed to have several large cavities. A distinct element numerical simulation using the UDEC was followed on the target area after completing all of field surveys. Data from field tests were directly dumped or extrapolated to numerical simulations as input data. It was verified from numerical analysis that several natural cavities underneath the foundation of the bridge should be reinforced Based on the project result, finally, most of fecundations far the bridge were re-examined and the cement grouting reinforcement was constructed on several foundations among them.