Blasting method is used most engineering works for rock excavation. Blasting method is done much to upgrade of operation efficiency, contraction of construction period than other method. But blasting method happens damage by blasting vibration, nose and scattering. Therefore this study examined about effect, characteristic and application of Plasma method. To confirm effect measured vibration, noise and frequency, and analyzed data compare with general blasting.
Drilling and blasting method for excavating rock mass is generally used in underground construction; but this technique has some shortcomings. For instance, rock mass damage is inevitable during drilling and blasting, and blast-induced vibration frequently causes some problems. Until now, field measurement method is used to predict the overbreak and vibration; but it has many limitations. Therefore, numerical analysis method is needed to overcome such limitations, and to estimate and predict damage and vibration due to tunnel blasting in the design stage. In this study, damage zone of rock mass due to stoping and contour blasting is compared based on standard tunnel blasting pattern, and the propriety of the standard tunnel blasting pattern is estimated. Then, blasting pattern is optimized so that the damage zone due to sloping blasting with reduced charge is consistent with that due to contour blasting.
암석 파쇄도는 노천의 벤치발파에서 생산성을 좌우하는 요소이다. 벤치발파에서 암석 파쇄도는 여러 가지 조건의 영향을 받게 되는데, 특히 암반의 불연속면 조건과 자연상태 암반 블록의 크기는 큰 영향을 미치는 것으로 알려져 있다. 이 연구에서는 석회석을 생산하는 3개 노천광산에서 발파조건 뿐 아니라 암반의 불연속면 조건과 자연상태 암반 블록크기를 면밀히 조사하여 이들 조건이 암석 파쇄도에 미치는 영향을 검토하였다. 분석 결과 암반의 불연속면 조건과 발파조건은 복합적인 상호작용에 의해 영향을 미치는 것으로 밝혀졌으며, 특히 자연상태 암반 블록의 크기는 암석 파쇄도에 가장 큰 영향을 미치는 것으로 나타났다. 암석 파쇄도는 암반의 불연속면 조건 중 주절리군의 방향에 의해서도 영향을 받는 것으로 확인되었는데, 주절리군의 방향이 벤치 앞쪽 자유면과 $30^{\circ}$의 경사를 이룰 때 파쇄물의 평균크기가 가장 작게 되는 것으로 나타났다. 이런 현상은 발파로 만들어진 탄성파의 전파경로 차이에 기인하는 것으로 판단된다.
Various vibration caused by construction vehicles and equipment movement, rock blasting, and crushing obstacle occurs inevitably in construction sites. In this study, we measured the impact of vibration by blasting rock at construction sites, rock crushing, concrete crushing. The measuring instrument was installed in adjacent buildings and observed that blasting vibration differs depending on the charge weight, blasting distance, and the measuring position. The observation was maintained by allowable peak particle velocity standard according to each standards and references.
밀장전한 암반 발파공에서 화약 폭발시 발생하는 고압의 폭굉압력 전파메카니즘을 충격파 이론을 적용하여 규명하고 전달된 발파압력 산정식을 유도하였다. 유도된 발파압력 산정식은 폭굉파속도, 단열지수, 화약밀도, Hugoniot 상수, 암반밀도의 함수였다. 에멀젼 화약과 서울 화강암의 특성시험을 시행하여 각 특성치의 확률분포를 정의하고 발파압력 산정식에 적용하여 발파압력의 확률분포를 산출하였다. 화약 특성치와 암반 특성치의 확률분포는 정규분포를 나타냈으며 따라서 발파압력의 확률분포도 정규분포로 추정되었다. 발파압력에 대한 매개변수분석을 시행한 결과 폭굉파속도가 발파압력에 가장 크게 영향을 미쳤다. 또한 이런 특성치의 불확실성이 발파압력의 불확실성에 미치는 영향을 분석하였다. 분석결과 암반특성치의 불확실성이 화약특성치보다 더 크게 영향을 미쳤다. 비록 매개변수분석에서 폭굉파속도가 발파압력에 가장 크게 영향을 미치는 요소이지만 암반특성치의 불확실성이 폭굉파속도의 불확실성보다 더 크기 때문에 발파압력은 후자보다 전자에 의해서 더 크게 영향을 받는다.
본 논문에서는 암석발파 유발 진동에 대한 포괄적인 추세특성을 파악하기 위하여 국내 97개의 현장에서 계측된 시험발파진동에 관한 자료를 이용하여 굴착종류(터널, 벤치굴착) 및 암석종류별로 발파진동의 특성을 조사 및 검토하였다. 계측된 자료는 주로 강원도 및 경상도 지역의 시험발파 현장으로부터 획득하였으며, 계측현장 자료의 암석종류는 화강암이 제일 많았으며 그다음으로 편마암, 석회암, 사암, 셰일 순으로 나타났다. 본 연구를 통한 분석 결과, 발파진동 속도는 굴착종류(터널, 벤치)에 따라 영향을 받는 것으로 나타났으며, 터널발파에 비하여 벤치발파에 의한 진동속도가 더 크게 발생하는 것으로 나타났다. 또한 발파진동은 암석종류에 따라 크게 영향을 받는 것으로 나타나 향후 암석종류를 포함한 발파진동 추정식 관리가 필요할 것으로 나타났다. 이와 더불어 본 연구를 통해 얻어진 결과와 기존의 국내 발파진동 추정식에 의한 결과들과 상호 비교하였으며, 비교결과 터널발파에서 자승근식을 이용한 결과를 제외하곤 큰 차이가 나타나 향후 암반에서의 발파진동 추정과 관련하여 암석의 강도 및 절리특성, 지층분포, 굴착종류, 사용화약, 계측장비 및 방법 등의 영향을 종합적으로 반영한 더욱더 많은 연구 및 관심이 필요할 것으로 판단된다.
옛날에는 거대한 바위를 제거하기 위해서는 다이나마이트 등의 폭약을 사용하여 폭파개념의 발파를 해왔다. 그러나 도심지에서 지하철굴착, 건물기초굴착, 택지조성 등을 위해서는 폭파개념의 굴착은 곤란하다. 건설교통부 암발파설계 및 시험발파 잠정지침(안)에서는 0.3cm/sec(센티세크)를 진동안전기준치로 하였을 때 $25\~120m$ 이격거리에서는 TYPE I의 암파쇄굴착공법에서 TYPE IV의 진동제어중규모 발파공법을 권장하고 있다. 본 논문은 25m이내 지역의 최근접 암파쇄굴착공법(TYPE I)적용 최적공법인 나노프라즈마 공법을 소개하고자 한다. 나노프라즈마 공법을 적용하여 도심지 바위를 파쇄할 때 15m거리에서 기존의 미진동발파공법의 절반 진동수준인 0.1cm/sec가 예상되는 획기적인 공법이다.
In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.
The optimum blasting pattern to excavate a quarry efficiently and economically can be determined based on the minimum production cost, which is generally estimated according to rock fragmentation. Therefore, it is a critical problem to predict fragment size distribution of blasted rocks over an entire quarry. By comparing various prediction models, it can be ascertained that the result obtained from Kuz-Ram model relatively coincides with that of field measurements. Kuz-Ram model uses the concept of rock factor to signify conditions of rock mass such as block size, rock jointing, strength and others. For the evaluation of total production cost, it is imperative to estimate 3-D spatial distribution of rock factor for the entire quarry. In this study, a sequential indicator simulation technique is adopted for estimation of spatial distribution of rock factor due to its higher reproducibility of spatial variability and distribution models than Kriging methods. Further, this can reduce the uncertainty of predictor using distribution information of sample data. The entire quarry is classified into three types of rock mass and optimum blasting pattern is proposed for each type based on 3-D spatial distribution of rock factor. In addition, plane maps of rock factor distribution for each ground level are provided to estimate production costs for each process and to make a plan for an optimum blasting pattern.
최근, 암반발파에서 평활한 파단면과 굴착손상영역을 제어하기 위한 목적으로 전자지발뇌관 및 노치장약공 등을 이용한 제어발파기술들이 개발되어 오고 있다. 본 연구에서는 날개형 노치 장약공을 이용한 SB발파에서 암반 내 파괴과정을 모사하여 파단면과 암반손상제어에 미치는 영향인자에 대하여 고찰하였다. 최종적으로 장약공 노치의 파단면 제어효과에 관한 수치해석적 고찰을 날개형 노치장약공과 전자뇌관을 이용한 새로운 SB발파법으로, ED-Notch SB발파법(Elerectronic Detonator Notched Charge Hole Smooth Blasting Method)을 제안하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.