• 제목/요약/키워드: Rock Waste

검색결과 370건 처리시간 0.032초

포화된 암반체에 위치한 공동의 발파충격해석 (The Impulsive Analysis of the Cavern in Saturated Rock Mass)

  • 김대홍;이경진;황신일;김진웅
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1994년도 가을 학술발표회 논문집
    • /
    • pp.201-208
    • /
    • 1994
  • To secure long-term structural safety of underground openings for radioactive waste disposal, the proper structural safety analyses are required. Especially, the structural analysis for underground openings should consider the effects of groundwater pressure. The objective of this study is to develop the structural analysis method for saturated rock masses. In this study, the interaction between groundwater distribution and structural behavior of rock masses are carried out to develop the structural analysis method of saturated rock masses. Then, a 3-Dimensional Multi-Phase Dynamic Analysis Program (MPDAP-3D) has been developed by modifying the existing MPDAP which is based on the concept of 2-dimensional two-phase media.

  • PDF

불연속면의 영향을 고려한 지하암반공동의 구조해석 (A Structural Analysis of Underground Openings in Discontinuous Rock Masses)

  • 김선훈;최규섭;김해홍;김진웅
    • 전산구조공학
    • /
    • 제4권4호
    • /
    • pp.117-124
    • /
    • 1991
  • 본 연구에서는 방사성폐기물의 처분을 위한 지하암반공동의 구조거동을 파악하기 위하여 암반내에 존재하는 불연속면의 영향을 고려하면서 지진하중에 대한 지하암반공동의 구조거동을 검토하고자 한다. 이를 위하여 불연속암반체의 수치해석모델에 대한 비교분석을 수행하였으며, 자하암반공동의 동적구조해석을 위한 합리적인 해석모델을 제시하였다. 그리고 개별요소법을 이용한 불연속암반체의 동적구조해석 프로그램을 사용하여 불연속암반체에 굴착된 가상의 지하공동에 대한 공동구조해석을 수행하였다.

  • PDF

방사성폐기물 처분공 주변 암주에서의 균열 진전 및 손상에 대한 수치해석적 연구 (A Numerical Study on the Fracture Evolution and Damage at Rock Pillar Near Deposition Holes for Radioactive Waste)

  • 이희석
    • 한국지반공학회논문집
    • /
    • 제19권5호
    • /
    • pp.211-221
    • /
    • 2003
  • 스웨덴$\"{A}"{s}"{p}"{o}$지하실험실에서는 방사성폐기물 처분공 사이 암반에서의 파쇄 및 안정성을 예측할 수 있는 능력을 평가하기 위해 $\"{A}"{s}"{p}"{o}$ 암주 안정성 실험 (APSE)이라고 하는 현지 가열 실험이 준비되고 있다. 계획된 시험 조건하의 암주에서의 균열 진전 과정을 합리적으로 예측하기 위해 경계요소 수치해석 코드인 FRACOD가 적용되었다. 암석경계와 무결암석 내에서의 균열 진전을 모사하기 위해 코드를 개선하였다. 또한 굴착 및 열하중에 의해 발생하는 응력분포를 FRACOD모델에 적용하기 위해 새로운 경계요소를 이용한 역해법을 개발하였다. 이 글은 계획된 시험조건에 대한 예측 모델링 결과를 제시한다. 굴착에 의한 응력분포는 암주 벽면에 약간의 균열을 발생시켰다. 120일 동안의 가열에 의해 암주 벽면 중앙부에서 전형적인 전단 균열들의 개시 및 전파가 일어났지만, 전반적으로 암주 내부는 고려되는 조건하에서 안정한 상태를 유지하였다. 기존 절리들의 존재와 균열 물성에 따른 영향이 또한 논의되었다. 해석 결과를 통해 FRACOD가 심부 터널 및 보어홀에서 취성 암반의 균열 진전 현상을 적절히 모델링할 수 있음을 알 수 있다. 취성 암반의 균열 진전 현상을 적절히 모델링할 수 있음을 알 수 있다.

사용후핵연료 동굴저장 (Rock Cavern Storage of Spent Fuel)

  • 조원진;권상기;김경수
    • 방사성폐기물학회지
    • /
    • 제13권4호
    • /
    • pp.301-313
    • /
    • 2015
  • 사용후핵연료 건식저장을 위한 지상저장 기술 및 동굴저장 기술의 현황을 살펴보고, 동굴저장 기술을 이용한 사용후핵연료 건식저장의 국내 적용 가능성을 분석하였다. 사용후핵연료 건식저장을 위한 동굴저장 기술의 타당성, 경제성 및 기술적 측면을 검토하였다. 지상 건식저장시설을 건설하기 위해서는 외부로부터 격리되어 있는 상당한 면적의 평탄한 부지가 필요하나, 산악지형이 주를 이루는 우리나라의 실정에서, 이러한 부지를 확보하는 것이 쉽지 않을 수도 있다. 만일 산지의 동굴 내에 사용후핵연료 저장시설을 건설한다면, 이러한 부지 문제를 보다 쉽게 해결할 수 있다. 따라서 동굴저장 방식은 자연 및 사회적 환경을 고려할 때, 우리나라의 사용후핵연료 건식저장을 위한 유력한 대안이 될 수 있다. 사용후핵연료 동굴저장 방식은 지상 건식저장 기술에 비해 여러 가지 장점을 가지고 있으며, 경제성 측면에서도 큰 차이가 없다. 또 동굴저장 방식을 국내의 사용후핵연료 건식저장에 적용하는 데 큰 기술적인 장벽은 없다.

남극 극지점 기지에서의 얼음 터널 프로젝트 (Snow Tunnelling Project at the South Pole)

  • 지왕률
    • 터널과지하공간
    • /
    • 제13권1호
    • /
    • pp.1-5
    • /
    • 2003
  • The United States Antarctic program (USAP) through its principal Support Contractor Raytheon polar Services Co. (RPSC), has recently finished a 3 years projects, almost 936m length of underground utility tunnels at Amundsen-Scott station. It accommodates the piping that conveys fresh water from current well sites, as well as waste water to repositories in abandoned wells. The under snow tunnels allow year-round access for system operations and maintenance.

방사성폐기물 지층처분을 위한 화강암의 열역학적 파괴거동 연구 (A Study on Thermomechanical Failure Behavior of Granites for Radioactive Waste Repository)

  • 양형식;장명환
    • 터널과지하공간
    • /
    • 제6권1호
    • /
    • pp.69-74
    • /
    • 1996
  • High temperature confined compressive tests for thermomechanical failure criteria were carried out for Iksan and Whandeung granites. Authors suggested new polynomial type failure coefficient functions by which conventional Hoek-Brown failure criteria was extended to thermomechanical one. Obtained results are as follow; 1) Failure coefficients, m and s of Hoek and Brown's empirical failure criteria were decreased as temperature increased. 2) Theoretically calculated values by suggested equations and experimented ones by confined compressive test were well coincided.

  • PDF

AN ANALYSIS OF THE FACTORS AFFECTING THE HYDRAULIC CONDUCTIVITY AND SWELLING PRESSURE OF KYUNGJU CA-BENTONITE FOR USE AS A CLAY-BASED SEALING MATERIAL FOR A HIGH-LEVEL WASTE REPOSITORY

  • Cho, Won-Jin;Lee, Jae-Owan;Kwon, Sang-Ki
    • Nuclear Engineering and Technology
    • /
    • 제44권1호
    • /
    • pp.89-102
    • /
    • 2012
  • The buffer and backfill are important components of the engineered barrier system in a high-level waste repository, which should be constructed in a hard rock formation at a depth of several hundred meters below the ground surface. The primary function of the buffer and backfill is to seal the underground excavation as a preferred flow path for radionuclide migration from the deposited high-level waste. This study investigates the hydraulic conductivity and swelling pressure of Kyungju Ca-bentonite, which is the candidate material for the buffer and backfill in the Korean reference high-level waste disposal system. The factors that influence the hydraulic conductivity and swelling pressure of the buffer and backfill are analyzed. The factors considered are the dry density, the temperature, the sand content, the salinity and the organic carbon content. The possibility of deterioration in the sealing performance of the buffer and backfill is also assessed.

스웨덴 방사성 폐기물 처분장 후보부지의 사례를 통해 살펴본 대규모 변형대가 암반의 초기응력에 미치는 영향 (Effect of Deformation Zones on the State of In Situ Stress at a Candidate Site of Geological Repository of Nuclear Waste in Sweden)

  • 민기복
    • 터널과지하공간
    • /
    • 제18권2호
    • /
    • pp.134-148
    • /
    • 2008
  • 암반의 초기응력 상태는 방사성 폐기물 지층 처분장의 적합성을 판단하는데 중요한 요소이다. 본 연구에서는 3차원 개별요소법을 이용하여 스웨덴 방사성 폐기물 처분장 후보지 중 하나인 오스카샴 지역에서 대규모 변형대가 초기응력에 미치는 영향을 살펴보았다. 수치해석에서는 부지조사 과정에서 확인된 변형대를 모델에 포함시켰으며 원거리 지각응력을 경계조건으로 사용하였다. 현지 암반에서 관찰되는 초기응력값의 변화 양상이 수치해석에서도 재현이 됨으로써 수치해석이 암반의 초기응력상태를 이해하는데 유용하게 쓰일 수 있음을 확인하였다. 수치해석을 통한 예측값과 초기응력 측정값과의 차이는 측정된 자료의 양호한 정도, 지질모델 및 변형대의 물성치의 불확실성 등에 기인하는 것으로 생각된다.

Radiotoxicity flux and concentration as complementary safety indicators for the safety assessment of a rock-cavern type LILW repository

  • Jo, Yongheum;Han, Sol-Chan;Ok, Soon-Il;Choi, Seonggyu;Yun, Jong-Il
    • Nuclear Engineering and Technology
    • /
    • 제50권8호
    • /
    • pp.1324-1329
    • /
    • 2018
  • This study presents a practical application of complementary safety indicators, which can be applied in a safety assessment of a radioactive waste repository by excluding a biosphere simulation and comparing the artificial radiation originating from the repository with the background natural radiation. Complementary safety indicators (radiotoxicity flux from geosphere and radiotoxicity concentration in seawater) were applied in the safety assessment of a rock-cavern type low and intermediate level radioactive waste (LILW) repository in the Republic of Korea. The natural radionuclide ($^{40}K$, $^{226,228}Ra$, $^{232}Th$, and $^{234,235,238}U$) concentrations in the groundwater and seawater at the Gyeongju LILW repository site were measured. Based on the analyzed concentrations of natural radionuclides, the levels of natural radiation were determined to be $8.6{\times}10^{-5}$ - $8.0{\times}10^{-4}Sv/m^2/yr$ and $6.95{\times}10^{-5}Sv/m^3$ for radiotoxicity flux from the geosphere and radiotoxicity concentration in seawater, respectively. From simulation results obtained using a Goldsim-based safety assessment model, it was determined that the radiotoxicity of radionuclides released from the repository is lower than that of the natural radionuclides inherently present in the natural waters. The applicability of the complementary safety indicators to the safety case was discussed with regard to reduction of the uncertainty associated with biosphere simulations, and communication with the public.

Hard rock TBM project in Eastern Korea

  • Jee, Warren W.
    • 한국암반공학회:학술대회논문집
    • /
    • 한국암반공학회 2008년도 국제학술회의
    • /
    • pp.33-41
    • /
    • 2008
  • The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.

  • PDF