• Title/Summary/Keyword: Roadway tunnel

Search Result 42, Processing Time 0.02 seconds

Chemical Composition of the Size-resolved Particles in Buk-Ak Tunnel

  • Ma, Chang-Jin;Hwang, Kyung-Chul;Kang, Gong-Unn;Tohno, Susumu
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.20 no.E2
    • /
    • pp.53-59
    • /
    • 2004
  • The roadway tunnels in urban areas give rise to problems such as a localized air pollution. Here, we report the results of a case study of an urban roadway tunnel measurement. The size-resolved particle sampling was carried out with a two 2-stage filter pack samplers and an Andersen impactor sampler at the center of Buk-Ak tunnel in November 2001. Particle Induced X-ray Emission (PIXE) was applied to determine the elemental composition of size-resolved particles divided into soluble and insoluble fractions. The Thermal/Optical Reflectance (TOR$^{(R)}$) method was also employed in analyzing of elemental carbon (EC) and organic carbon (OC). Mass concentrations of fine (< 1.2 ${\mu}{\textrm}{m}$) and coarse (> 1.2 ${\mu}{\textrm}{m}$) particles are 165 and 48 $\mu\textrm{g}$ m$^{-3}$ , respectively. Total elemental mass concentration (the sum of insoluble coarse, soluble coarse, insoluble fine, and soluble fine) is found to be 24$\mu\textrm{g}$ m$^{-3}$ and comprises only 11 % of total particle mass concentration. The concentrations of EC, OC, and mass show the clear dependency on particle size with the maximum between 0.1 and 0.43 ${\mu}{\textrm}{m}$ aerodynamic diameters. Total carbon (sum of EC and OC) accounts for approximately 70% of mass concentration.n.

Hard rock TBM project in Eastern Korea

  • Jee, Warren W.
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.10a
    • /
    • pp.33-41
    • /
    • 2008
  • The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.

  • PDF

Determination of Reinforcement Method for Abandoned Tunnel by Fuzzy Approximate Reasoning (퍼지근사추론에 의한 폐터널의 보강방식 선정)

  • 조만섭
    • Tunnel and Underground Space
    • /
    • v.14 no.4
    • /
    • pp.275-286
    • /
    • 2004
  • It is studied to select the reinforcement method of an abandoned tunnel which are intersected under the new roadway line. In the various decision makings, the reasonability for the reinforcement method of an abandoned tunnel was estimated using the pair-wise comparison and the fuzzy approximate reasoning to simplify the process of survey research. And there is reflected all the qualitative and quantitative characterizations by investigation items. In order to select the reinforcement method of an abandoned tunnel, 4 characteristic factors of construction, economical efficiency, safety and maintenance were used. Using the simple survey research and pair-wise comparison matrix, the weight of 4 factors was decided. The fuzzy approximate reasoning was used to calculate the quantitative value of each factor And then reflecting each weight to these results, the final reinforcement method of an abandoned tunnel could be determined.

Rock fracturing mechanisms around underground openings

  • Shen, Baotang;Barton, Nick
    • Geomechanics and Engineering
    • /
    • v.16 no.1
    • /
    • pp.35-47
    • /
    • 2018
  • This paper investigates the mechanisms of tunnel spalling and massive tunnel failures using fracture mechanics principles. The study starts with examining the fracture propagation due to tensile and shear failure mechanisms. It was found that, fundamentally, in rock masses with high compressive stresses, tensile fracture propagation is often a stable process which leads to a gradual failure. Shear fracture propagation tends to be an unstable process. Several real case observations of spalling failures and massive shear failures in boreholes, tunnels and underground roadways are shown in the paper. A number of numerical models were used to investigate the fracture mechanisms and extents in the roof/wall of a deep tunnel and in an underground coal mine roadway. The modelling was done using a unique fracture mechanics code FRACOD which simulates explicitly the fracture initiation and propagation process. The study has demonstrated that both tensile and shear fracturing may occur in the vicinity of an underground opening. Shallow spalling in the tunnel wall is believed to be caused by tensile fracturing from extensional strain although no tensile stress exists there. Massive large scale failure however is most likely to be caused by shear fracturing under high compressive stresses. The observation that tunnel spalling often starts when the hoop stress reaches $0.4^*UCS$ has been explained in this paper by using the extension strain criterion. At this uniaxial compressive stress level, the lateral extensional strain is equivalent to the critical strain under uniaxial tension. Scale effect on UCS commonly believed by many is unlikely the dominant factor in this phenomenon.

A Study on the In-Situ Measurement of the Deformation and the Back Calculation of the Load in the Mine Roadway Over-Stressed Rocks (중지압 운반 갱도내 변형계측 및 하중역산에 관한 연구)

  • Cho, Young-Soo;Kim, Hong-Woo;Shin, Hee-Soon;Chung, So-Keul;Lee, Hi-Keun
    • Tunnel and Underground Space
    • /
    • v.3 no.1
    • /
    • pp.40-49
    • /
    • 1993
  • In this study, the indirect estimation method of the support load which is based upon the integrated measuring technique suggested by Kovari was applied to the calculation of support load in the mine roadway. Four test supports were installed in the area where they had to be replaed. Two of those were GI-130 rigid supports and the others were U-26 yieldable supports. The vibrating wire strain gages which were attached inpairs on the steel arch support were used to provide an accurate measurement. Bending moments and normal forces obtained from strain gage pairs were used to calculate the support load. This method was also verified by laboratory bending tests. The results obtained from the back-calculction method showed relatively good agreement with the measured convergence for each crossection.

  • PDF

A Study on the Introduction of Speed Enforcement System Using Point-to-point Speed Measurement (구간방식 과속단속장치 도입방안에 관한 연구)

  • Lee, Sang-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.3 s.81
    • /
    • pp.88-97
    • /
    • 2007
  • A point based speed enforcement system(SES) has been widely used in roadways to reduce the operating speeds and potential traffic accidents. Recently, the needs for introudcing new SES using point-to-point speed measurement was presented, however, no practical guidelines or justification of the system was available. This study investigated the effectiveness of the current SES and introduction of the new SES through user interview survey method. Survey results showed that 33% of respondents were unsatisfactory to the current way of SES operation, which was 11% higher than satisfactory respondents, and about 70% of the respondents supported the introduction of point-to-point based SES operation. A majority of respondents preferred the straight roadway segment, bridge and tunnel, and curved roadway segment for a start application site with the segment length of 1-5 km long. Using these survey results, an introduction scheme was discussed in terms of legal bases, installation criteria, and operational guidelines.

A study on the stability analysis for double deck tunnel branch geometry (복층터널 분기 기하구조에 따른 안정성 검토에 관한 연구)

  • Park, Woo-Jeong;Jang, Namju;Kim, Kihwan;Choi, Chang-rim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.393-404
    • /
    • 2018
  • The tunnel can be planned to connect to underground roadway and surface road. The large tunnel and branch section are made when the ramp tunnel access to the main tunnel. In the branch section, stress concentration can be assigned and it can be very important for the stability of the tunnel. This study assessed the behavior of rock pillar in double deck tunnel diverging area by using a two dimensional numerical analysis. This study evaluated different safety factors according to pillar width and the ramp tunnel position in branch. By the assessment of the strength-stress ratio, tunnel pillar width is suggested in order to secure the safety factor 1.5.

A simulation analysis on the probeam lighting for the visibility at a tunnel with whitehole phenomenon (화이트홀 현상이 있는 터널출구에서 운전자 시인도 향상을 위한 프로빔조명에 대한 시뮬레이션 연구)

  • Lee, Young-Q;Lee, Seung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.29-36
    • /
    • 2007
  • Despite the role of tunnels in today's roadway environment, the study on tunnel lighting is still scant. Drivers passing through a tunnel face some difficulties caused by the visual differences between outside and inside of the tunnel. The whitehole phenomenon at a tunnel exit-zone severely decreases the driver's visibility in the daytime. A probeam lighting is generally recommended for the prevention of it. This paper simulates an exit-zone with a whitehole phenomenon to verify the effect of probeam lighting. Even though the tunnel lighting is important, it is not easy to consider enough number of lighting alternatives at the stage of tunnel design due to the complexity of tunnel conditions. This paper is expected to contribute improving the visibility in tunnels, especially at the exit-zone.

  • PDF

Application of TBM/TBE to Mechanical Excavation in Rock (암반기계굴착공법의 적용연구)

  • Park, Chul-Hwan;Kim, Kil-Soo
    • Tunnel and Underground Space
    • /
    • v.2 no.1
    • /
    • pp.177-189
    • /
    • 1992
  • As tunnel becomes longer and larger, TBM has become one of the most popular methods of excavatio in rock. This paper describes the degree of operation the degree of availability and penetration rate of TBM and TBE applied in Namsan roadway tunnelling site. Net penetration rate was 1.62m/hr for TBM and 0.72m/hr for TBE. Net penetration rate showed no direct relation to daily advance or penetration time, but the lower bound of penetration rate could be obtained from the relation with daily advance. For both of TBM and TBE, the degree of operation and the degree of availability were 33.8% and 68.6% respectively. Life time of normal cutter was $310m^3$ for TBM and $194m^3$ for TBE, while that of center and gauge cutter was about $50m^3$. When the two machines were compared, TBM showed 80% higher penetration rate, and 40% shorter life time of cutter.

  • PDF