• 제목/요약/키워드: Road site

검색결과 668건 처리시간 0.026초

평택-음성간 고속도로의 에코로드 조성을 위한 환경생태계획 (Ecological Planning for the Preparation of an Eco-Road on the Pyungtak-Eumsung Highway)

  • 강현경;민권식;장종수;한봉호
    • 한국조경학회지
    • /
    • 제32권3호
    • /
    • pp.32-42
    • /
    • 2004
  • This study aims at establishing an ecological planning for road construction. which is considered to be a main cause of damage to the natural environment in Korea. This study focuses on the Pyungtak-Eumsung Highway development project. It considers the ecological factors and status of the site and its surrounding area. The study site is a four-way highway with a width of 23.4m and a length of 5.7km that spans from Hyungok-ri, Anseong City, Kyeonggi Province to Jukhyun-ri, Jincheon-gun, Chungbuk Province. The objective of the plan is "the establishment of an eco-road in harmony with nature." The plan is divided into five detailed goals: 1) restoration of river morphology and ecosystem through ecological planning; 2) establishment of wet biotopes; 3) construction of ecological corridors; 4) restoration of damaged forest ecosystems; and 5) ecological restoration of the roadside slopes that are linked with the surrounding forest. A master plan has been developed based on the detailed goals. The master plan involves: 1) establishment of a natural river, wet biotopes, and ecological corridors that facilitate the movement of amphibians, wild fowls, mammalians and fish; 2) development of a planting plan for the visitor center, the tunnel entrance, and soundproof banks; and 3) the presentation of a planting model for restoring roadside slopes that are connected to the surrounding forest. The eco-road plan needs to entail ecological conservation and restoration plans. In addition, a monitoring plan for ecological corridors and habitats should be included in the comprehensive plans, along with the continuous development of environmentally friendly technologies.

보행자전용도로의 이용목적에 따른 만족요인 연구 (A Study on Satisfaction Factors of Pedestrian Road in Residence District according to Usage Purpose)

  • 염성진
    • 한국환경과학회지
    • /
    • 제20권9호
    • /
    • pp.1205-1212
    • /
    • 2011
  • As serving people's activities, pedestrian road systems are basic and necessary facilities in urban structure. To provide and utilize these pedestrian road systems in residential area would enhance urban environment as well as quality of life. For this reason, pedestrian road should be planned by consideration of people's activity in residential area. Evaluation of existing pedestrian road should be also oriented how people use it and what people do in it. This study amis to investigate functions of pedestrian road system throughout evaluation of user's satisfaction in order to improve better pedestrian road system in residential area. The purposes of this study are to analyze components of factors affecting on user's satisfaction, and to find the relationship among affecting factors. For this study, the on-site questionnaire method was applied to 267 individuals who were collected as the study areas where locate Toyogaoka and Kaidori, Japan. The collected data were clarified exploratory factors, and analyzed relationship between the factors and satisfaction by applying quantitative statistical techniques for the mapping investigation, Mann-Whitney u-test, and correlation. The results of this study are follows. The pedestrian road system is more preferred than surroundings of vehicle roads in residential district area where maintains pedestrian road as open space. In addition, satisfactions of the pedestrian road for each purpose were highly evaluated, because of conformability and convenience for usage. Consequently, the pedestrian road which is secure and greening as an open space is well carried out for the living circulation of residents. It would suggest that pedestrian road have to be managed and planned not a function of circulation but an open space system.

마이크로서페이싱의 성공과 실패 사례 (Microsurfacing Successes and Failures)

  • 김현환;;이문섭;이순제
    • 한국도로학회논문집
    • /
    • 제17권2호
    • /
    • pp.71-78
    • /
    • 2015
  • PURPOSES: This study set out to investigate the current state of microsurfacing in Texas and compared the results with the current state of the practice nationwide. METHODS: For this study, case studies were extracted from the existing literature and compared with the data obtained both from site visits by the research team and data obtained from a survey by Texas Department of Transportation (TxDOT) personnel. The successes and failures of microsurfacing are detailed and explanations of different issues are outlined. Forensic studies from Texas are included in the descriptions of those microsurfacings that failed when configured as part of the cape seals. RESULTS : Microsurfacing has been shown to be an effective pavement preservation technique when applied to an appropriate road, at an appropriate timing, and as a remedy for certain issues. The failures experienced in Texas can mostly be attributed to cape seals and an inability to recognize structurally faulty pavement. CONCLUSIONS : When applied to an appropriate road, at an appropriate timing, and as a remedy for certain issues, microsurfacing has been shown to perform well in numerous case studies. The majority of microsurfacing failures are the result of poor project selection, usually involving the treatment being applied to structurally unsound pavement.

도로터널 굴착공사의 적정공기 판단기준 (Optimum Construction Duration for Road Tunnel Excavation Works)

  • 김하나;김대영;김대영;정성춘;허영기
    • 대한건축학회논문집:구조계
    • /
    • 제34권4호
    • /
    • pp.59-64
    • /
    • 2018
  • Construction schedule acceleration due to unreasonable construction planning frequently leads to construction accidents. In order to avoid such inevitable acceleration and to ensure safety in construction sites, there is a need for objective standards to determine appropriate construction duration for each construction process earlier in the process. In order to achieve the goal, intensive experts interviews were firstly conducted to identify candidate drivers affecting construction schedule of road tunnel excavation works. Then, a total of 34 field data was collected from on-going sites to analyze. It was found that actual excavation length per one day on site is varied mostly by Rock Mass Rating(RMR) types from various statistical analyses. Therefore an one-way table of excavation length per a day by RMR types were presented in a form of percentile. The results will help industry experts determine the most appropriate construction schedule for the works, which eventually lead to a zero accident site in many ways.

도로 토목 공사 현장에서 UAV를 활용한 위성 영상 지도의 정확도 분석 (Accuracy Analysis of Satellite Imagery in Road Construction Site Using UAV)

  • 신승민;반창우
    • 한국산업융합학회 논문집
    • /
    • 제24권6_2호
    • /
    • pp.753-762
    • /
    • 2021
  • Google provides mapping services using satellite imagery, this is widely used for the study. Since about 20 years ago, research and business using drones have been expanding. Pix4D is widely used to create 3D information models using drones. This study compared the distance error by comparing the result of the road construction site with the DSM data of Google Earth and Pix4 D. Through this, we tried to understand the reliability of the result of distance measurement in Google Earth. A DTM result of 3.08 cm/pixel was obtained as a result of matching with 49666 key points for each image. The length and altitude of Pix4D and Google Earth were measured and compared using the obtained PCD. As a result, the average error of the distance based on the data of Pix4D was measured to be 0.68 m, confirming that the error was relatively small. As a result of measuring the altitude of Google Earth and Pix4D and comparing them, it was confirmed that the maximum error was 83.214m, which was measured using satellite images, but the error was quite large and there was inaccuracy. Through this, it was confirmed that there are difficulties in analyzing and acquiring data at road construction sites using Google Earth, and the result was obtained that point cloud data using drones is necessary.

목표종 생태통로의 위치선정 -포유류 Road-kill 현장조사를 중심으로- (Eco-corridor Positioning for Target Species - By Field Surveying of Mammals' Road-Kill -)

  • 이용욱;이명우
    • 한국환경복원기술학회지
    • /
    • 제9권3호
    • /
    • pp.51-58
    • /
    • 2006
  • The purpose of this research presents a method to position and makes the structure for eco-corridors reasonably with collectable analysing results of various effects shown in mammals' road-kill at 429 points. Target animals of this research are Leopard cat, Siberian weasel, Raccoon dog, Korean hare, Eurasian red squirrel, Siberian chipmunk and Water deer. The results derived from the empirical analysis on the contents above are followed. First, according to the results as for Leopard cat road kill analysis, which is designated as Endangered Species Class II, the eco-corridor might be located at near village having stead food in order to decrease the frequencies of road-kill, because its road kill points were mainly collected at 4 lane hilly road with mountain-road-farm area geological type of. Second, because Siberian weasel's road kill was detected at 2 lane hilly road with mountain-road-stream geological type, the eco-corridor might be located at near a mill to decrease road-kill frequencies. Third, the road-kill frequency of Eurasian red squirrel can be reduced when the eco-corridor is located at the area across coniferous tree near 4 lane west sea freeway with mountain-road-mountain. Fourth, the road-kill of Raccoon dog can be reduced when the eco-corridor is located at 4 lane mountain road or hilly road with the geological type having farm land-road-mountain(stream). Fifth, Korean hare's road-kill can be reduced when the eco-corridor is located at grass land across ridge line of mountain, because wild rabbit road kill was happened at 4 lane mountain road or 2 lane mountain road(mountain-road-mountain). Sixth, As for Siberian chipmunk, the eco-corridor might be located at the side slope of mountain road at 2 lane mountain road under the speed of 60km/h with mountain-road-mountain. Seventh, For Water deer, the eco-corridor might be located at 4 lane hilly road with mountain-road-farm land. As for Common otter, Amur hedgehog, Yellow-throated marten, Weasel, it is difficult to specify the proper site of eco-corridor due to the lack of data. Eco-corridors for carnivores might be well located at 4 lane hilly road or 2 lane hilly road with mountain-road-farm land, and the track for herbivores might be well located as a overhead bridge on mountain-road-mountain type across mountains. In order to position eco-corridors for wildlife properly, we have to research animal's behavior with ecological background, and to consider the local uniqueness and regularly collect the empirical road-kill data in long term 3 to 5 year, which can be the foundation for the more suitable place of wild life eco-corridors.

대심도 복층터널의 다목적 활용을 위한 입지선정 및 통수성능 평가 (A Study on site selection criteria and discharge capability evaluation for the multi-purpose use of a double-deck tunnel in a great depth)

  • 문훈기;길기오;송인철;이혜윤
    • 한국터널지하공간학회 논문집
    • /
    • 제18권3호
    • /
    • pp.283-290
    • /
    • 2016
  • 최근 도시지역의 홍수방지 및 지정체 반복구간의 교통문제 해결을 위해 다목적 대심도 복층터널의 건설이 요구되고 있다. 다목적 복층터널은 주기능인 도로기능 이외에 다목적 기능을 부여해 지하공간의 효율적인 활용을 위해 도입이 절실하다. 본 연구에서는 도심지 치수능력 증진과 도로터널의 기능을 동시에 고려하기 위한 입지선정 조건과 복층터널의 단면 구역별 처리가능한 유량에 대한 기초검토를 수행하였다. 터널의 용도별 입지선정 기준 검토를 통해 복층터널의 다목적 활용을 위한 입지선정 기준 방안을 제시하고 있다. 또한 대심도 복층터널의 다목적 활용성 검토를 위해 계획단면에 대한 홍수시 처리 가능 유량을 검토하였다. 본 연구로부터 복층터널의 입지선정은 다양한 분석을 통한 복합적인 고려가 필요함을 알 수 있다.

초기 데이터 분석 로드맵을 적용한 사례 연구 (The Study on Application of Data Gathering for the site and Statistical analysis process)

  • 최은향;이상복
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 2010년도 춘계학술대회
    • /
    • pp.226-234
    • /
    • 2010
  • In this thesis, we present process that remove mistake of data before statistical analysis. If field data which is not simple examination about validity of data, we cannot believe analyzed statistics information. As statistical analysis information is produced based on data to be input in statistical analysis process, the data to be input should be free of error. In this paper, we study the application of statistical analysis road map that can enhance application on site by organizing basic theory and approaching on initial data exploratory phase, essential step before conducting statistical analysis. Therefore, access to statistical analysis can be enhanced and reliability on result of analysis can be secured by conducting correct statistical analysis.

  • PDF

11,12세기 고려(高麗) 정궁(正宮)의 건물구성과 배치 (Building Composition and Site Layout of the Main Palace of the Koryo Dynasty in the 11th and 12th century)

  • 김동욱
    • 건축역사연구
    • /
    • 제6권3호
    • /
    • pp.23-44
    • /
    • 1997
  • There are two main halls in the Main Palace of the Koryo Dyansty in the 11th and 12th century. One, named Hoekyongjeon, was served only for special ceremony ; hundred Buddhist priests' sermons or receiption of Chinese emperor's letters. The other one, Kondukjeon, was used as ordinary throne hall. The ordinary throne hall was built when the palace was erected at the beginning era of the Koryo Danasty, while the special ceremony hall built after the reconstruction in the 11th century. The throne hall was located at northwest side of the special ceremony hall. Audience chamber and King's bedroom were located at west and northwest side of the throne hall. The basic layout of the Palace showed unsymmetrical shape. It seemed mainly effected by its undulating terraine. The acess road from main gate to the throne hall showed zigzag way, by following a stream penetrating the site obliquely, It could be said that the Main Palace of the Koryo Danasty achieved its originality on the aspect of unsymmetrical layout and zigzag acess road, which was not found in the former palaces.

  • PDF

GSIS를 이용한 교량관리체계(橋梁管理體系) 구축(構築) (The Construction of Bridges Management System Using GSIS)

  • 양인태;김동문;신계종
    • 산업기술연구
    • /
    • 제18권
    • /
    • pp.43-50
    • /
    • 1998
  • According to complexity and high level of society, the rapid and accurate information for landuse, environment and traffic etc., is required, but the information management by a drawing and a map is confronted with a complicated and sudden change of facilities such as bridge; electricities, city gases and networks. This paper is aim to build a bridge management system of road with GSIS. It operated personal computer will bring easy computing management system of bridge on road. To build this system, presented bridge management system and domestic method for bridge management of road are investigated, and also apply to bridge management system using GSIS for site and character of bridges. And with that, position and character apply to bridge management system using GSIS.

  • PDF