This study was carried out to provide fundamental data for prospective forest-road project and forest-road network arrangement through appraising existing forest-road network with density, extension distance, maximum yarding distance and yarding area, position of forest-road line considered above foundation of two theories, one is "theory of optimal forest-road density" which has expense for yarding cost and constructing forest-road minimized, the other is "theory of optimal forest-road arrangement" which has investment effect maximized. The results are as follows. 1. In density and extension distance of the forest-road by site, it was showed up that density of existing forest-road is lower than that of calculated forest-road. So, it is thought that some additional forest-roads have to be constructed. 2. In the arrangement of the forest-road network by site, it was showed up that the arrangement of calculated forest-road is higher than that of existing forest-road arrangement for the forestry and yarding function. So, it is thought that the arrangement of forest-road network have to be considered to maximize the investment effect. 3. In "mean maximum distance for yarding" and "mean area which yarding can be done" by horizontal and inclined distance, the existing forest-road networks were different from those of calculated forest-road network. So, calculated forest-road network making investment effect maximize is more effective than existing forest-road network. Hence, in prospective forest-road project, it is needed that forest-road network having "area which yarding can be done" maximized through considering function for yarding have to be constructed.
The road sign is one of street furnitures functioning to guide directions for drivers. The road sign should be employed and designed to help drivers find their destinations easily and accurately. It is obvious that the road sign is one of the main components that enhance efficiency and safety of driving environments. The current way of guiding strategy at road signs in Korea is a system for mainly guiding 'points' although a new system guiding 'road names' and 'street numbers' with the introduction of new address system is now being introduced on urban areas. When the regional territory management offices and local governments try to employ current road sign systems, they are supposed to follow the sign regulations which contains standard project processes, selection methods of guiding points, character size and design, and location selection for each road sign. However, the current road sign regulations are very complex to understand and unclear for a person in charge to do tasks described above. Especially, selection process and criteria of guiding points are cumbersome and controversial. Furthermore, non sufficient ways of selecting guiding points considering road functions and geographic characteristics decrease the connectivity of guiding points. This study develops enhanced ways of increasing connectivity of successive guiding points through three case studies. Developed ways will help highway agencies and officials understand how to improve the connectivity of road signs.
After the Korean war, two major attempts were made to reconstruct Gwanghwamun Gate as an important part of Korea's lost cultural heritage. In December 2006, the Korean government replaced the concrete gate with a wooden one, yet traces of the attempts made in the 1960s to transform Gwanghwamun Gate and the main road remain to this day. At the time, the Third Republic of Korea, sought to legitimize itself in the name of modernity, and went on to modernize the architecture and urban landscape of Seoul. The location and design selected for the rebuilt Gwanghwamun illustrated the symbolic relationship between historic heritage and urban development. The reconstruction of the gate began as part of the Third Republic's project to restore the Central Administration Building and culminated in the transformation of the main road in front of the gate. By reconstructing the traditional gate using concrete, the military government intended to convey the message that we could inherit our proud tradition using modern materials, and that we should actively adopt the new technologies of the modern era. This study begins with the premise that the Gwanghwamun reconstruction project of 1968 represents the application of new technological thinking to Korea's architectural style, and has two objectives. The first is to summarize the reconstruction process and method using the records and drawings from the 1968 project, which was then under the leadership of architect Kang Bong-jin. The second is to analyze the characteristics of the architectural style and structure of the reconstructed Gwanghwamun so as to reinterpret the relationship between Korean tradition and modern technology.
Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.662-665
/
2008
This research attempts to develop 4D CAD function to support optimal road design by expanding the existing 4D CAD utilization system, which focused on construction phase, to the design phase. The functions such as earthwork simulation for selecting of road alignment, alternative route simulation and structure type simulation were suggested as functions to support road design. Through those virtual reality (VR) functions, visual confirmation of the condition of route and earthwork Is possible by the developed system, and an optimal alternative route can be selected by carrying out layout simulation of the alternative route. The functions presented in this research provide the decision making tools based virtual model for efficient support to road design.
Lim, Chang Su;Hong, Kwang Woo;Kim, Eun Ja;Kwak, Jong Ho;Choi, Jin Ah
Journal of Korean Society of Rural Planning
/
v.18
no.4
/
pp.153-170
/
2012
In recent years, the central ministries and regional self are competitively developing program for creating a trail and theme path by the increase of the number of trekkers. Even though these projects are developed in rural areas, it has been pointed out that most of projects do not directly linked to the revitalization of rural villages and improvement of non-farm income because of the main road itself as a resource in rural area. Therefore, in this study, we try to connect the citizen and the agriculture and rural area through the development of the green road which is the experience road with rural resource. To achieve this, we investigated the status and characteristics of the 36 villages where are the village was promoted various major project of first step. In second step, we considered the distinct characteristics of the area with conference of expert and site investigation for the final selection of 15 villages. Through two rounds' expert group consulting with checking, related literatures review and similar case-projects benchmarking, a riverside green road which is linked long distance trail and adjacent to the riverside was developed 15 courses by 2-development types proposed.
Many local governments are reducing speed limits according to the "Safe Speed 5030" policy implemented by the government to reduce traffic accident deaths. In the urban road sections in many metropolitan cities where speed limit reduction is applied as a pilot project, the decrease effect of the traffic accident number and death count is shown; however, no study of the effect analysis on the road sections of medium and small cities (basic local government unit) is found. Therefore, this study investigated the travel speed, number of traffic accidents, and death count before and after the implementation of speed limit reduction, targeting some urban road sections in Pyeongtaek city and some provincial road sections in Icheon city among basic local governments, namely among medium and small cities in Seoul Metropolitan Area.
Lee, Hyun-Woo;Lee, Young-Joon;Park, Young Min;Lee, Jeongho;Yoon, Mikyung
Journal of Environmental Impact Assessment
/
v.13
no.6
/
pp.295-305
/
2004
After the Rio declaration on environment and development in 1992, developed countries are undertaking "environmentally sustainable transportation (EST)" projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents for the last six years. The EIA for railroad construction projects accounts for only 4.9% of total 918 project EIAs during 1998-2003, and the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water pollution, waste management, and noise, etc. We compared characteristics of environmental impacts of railroad construction with those of vehicle road construction, based on environmental and construction-planning indicators appeared in Environmental Impact Statements. Railroad construction usually requires longer tunnels and bridges for a given length than those for vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than 50% of those in vehicle road construction. To develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly recommended.
Kim, Tae-Hyung;Park, Tae-Young;Kim, Sung-Ryul;You, Sang-Ho;Kim, Kook-Han;Kim, Yun-Tae
Journal of the Korean Geotechnical Society
/
v.28
no.8
/
pp.89-99
/
2012
The expansion of a road on soft ground could induce an additional settlement to the existing road because of the consolidation characteristics of the soft soil layer subjected to additional load by an adjacent banking. In such case, the existing road could be faced with various problems during the stages of the construction and maintenance, such as deterioration of not only the surface smoothness yielding the decrease in automobile performance safety but also the structural stability of the embankment. These kinds of problems are expected to occur more freguently especially for the deep ground level with a fairly thick soft soil layer. Therefore, they should be examined and studied adequately during the design stage. As a reference case study, this paper deals with the project named Namhae Expressway of 2nd Branch with the soft soil layer with the thickness upto about 50m. After a lengthy review of the original design, an improved design is proposed.
The purpose of this study is to identify the characteristics of China's trade relationships with and dependency on the countries participating in the Belt and Road initiative and to present some implications. This study collected annual total imports, exports, and GDP data from the International Monetary Fund (IMF) on 198 countries and the National Bureau of Statistics of China (NBS) on 221 countries from 1995 to 2015. China's imports and exports have expanded considerably from the mid-1990s to the present, and China's dependence on imports and exports with the US and Japan has declined, while its dependence on the Middle East, South Africa, South America, and Southeast Asia has increased. China has a very high level of dependence on imports from and exports to the countries participating in the Belt and Road initiative, and as the Belt and Road project progresses, the mutual trade dependency between China and the other participating countries is expected to strengthen and expand.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.