• 제목/요약/키워드: Road project

검색결과 533건 처리시간 0.026초

An Introductory Study of the Level-of-Service Evaluation Methodology of Urban Roads with Multimodal Considerations (다수단 Mode를 고려한 도시부 도로의 서비스수준 평가방법에 관한 기초연구)

  • Park, Jun Seok;Roh, Jeong Hyun
    • International Journal of Highway Engineering
    • /
    • 제17권2호
    • /
    • pp.123-134
    • /
    • 2015
  • PURPOSES : The key point of a multimodal LOS (level-of-service) evaluation system is that all of the modes are mutually associated to determine each mode's LOS. For example, the LOS of the bicycle mode is measured based on not only bicycle volumes, but also automobile volumes. However, the Korea Highway Capacity Manual (KHCM) still focuses on the automobile mode in evaluating the LOS of the roads. Additionally, the KHCM's LOS of the other modes, except for the automobile, is not consistent with actual road conditions. The KHCM, therefore, needs to develop and introduce a multimodal LOS system in order to evaluate the service conditions more accurately. METHODS: As a preliminary step to the introduction of multimodal LOS research, in this study the current problem of the KHCM's LOS system through a close review and comparison with other HCMs (highway capacity manuals) was identified. Secondly, a field survey and investigation of the urban streets to apply the HCM's multimodal LOS system was conducted. Finally, a comparison analysis of the results of the HCM and KHCM LOS was performed. RESULTS: In the study, it was found that the results of the LOS for the automobile mode did not show a significant difference between the HCM and KHCM. However, the LOS of the bicycle and pedestrian mode tended to be worse in the multimodal LOS system, which results from considering the effects of the automobile mode. Moreover, it was found that many cases have the potential to improve the overall LOS conditions, while reducing the automobile capacity. CONCLUSIONS: With the introduction of the multimodal LOS system, road diet and complete streets can be easily applied to ans actual road improvement project. Ultimately, the multimodal LOS system should be introduced into the KHCM, which can then be applied to traffic impact studies and other road improvement projects for more accurate evaluations.

A Study on Analysis of Issues in Developing a Basic Road Transport Database and Proposals for Enhancing Its Reliability and Data Sharing (with Focus on Databases Related to Road Transport Demand Estimation) (도로부문 교통기초자료 구축사업의 문제점 분석 및 개선방안 연구 (교통수요 예측 자료를 중심으로))

  • Lee, Sang-Hyeop;O, Chang-Seok
    • Journal of Korean Society of Transportation
    • /
    • 제27권6호
    • /
    • pp.55-67
    • /
    • 2009
  • In Korea, previously implemented road construction project caused a big budget waste due to overestimation of transport demand. There could be reasons for such inaccuracy of transport demand estimation, but the main reasons are: (1) low reliability of used basic road transport data and (2) inadequate sharing of data among agencies/departments. The National Transport Database and the Household Travel Database in Seoul Metropolitan Area, two representing basic road transport database, will be used to the establishment of a road construction plan that will be promoted afterwards. However, these materials have problems such as low reliability and inadequateness, too. Hence, focusing on transport demand estimation related databases, this paper will make proposals for enhancing their reliability and data sharing.

Extraction of Road Structure Elements for Developing IFC(Industry Foundation Classes) Model for Road (도로분야 IFC 확장을 위한 도로시설의 구성요소 도출)

  • Moon, Hyoun-Seok;Choi, Won-Sik;Kang, Leen-Seok;Nah, Hei-Sook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제15권2호
    • /
    • pp.1195-1203
    • /
    • 2014
  • Since IFC (Industry Foundation Classes) 4 is based on the representation of 3D elements for an architecture project, and does not define standardized shapes for civil projects such as roads, bridges, and tunnels etc, it has limitations in securing interoperability for exchanging a shape information model for the civil projects. Besides, since road facilities have a linear reference, which is modeled along the center alignment, it is difficult the designers to create a standardized 3D road model. The aim of this study is to configure structure elements and their attribute for a road in the perspective of 3D design for developing a shape information model for the road. To solve these issues, this study analyzes the design documents, which consist of a road design handbook, guide, specifications and standards, and then extract shape elements and their attributes of road structures. Such shape elements are defined as an entity item and we review a hierarchical structure of a road shape defined by a virtual road model. The detailed elements and their attributes can be utilized as a 3D shape information model for constructing BIM (Building Information Modeling) environment for Infrastructures. Besides, it is expected that the suggested items will be utilized as a base data for extending to IFC for a road subdividing the detailed shapes, types and attributes for road projects.

Thesis of Non-passing Distance in Road using Close-Range Photogrammetry (근거리사진측량을 이용한 도로에서의 정지시거 정립)

  • Choi, Seok-Keun;Lee, Seon-Gyu
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • 제25권5호
    • /
    • pp.407-414
    • /
    • 2007
  • Even Korea is big country of automobile, the occurrence of traffic accident is in last place in 29 OECD countries. If it is evaluated by assessment guide of investment over the development project of public-traffic facilities, it was shown that the direct economical loss was fairly great. In this study, in order to minimize the traffic accidents occurring at curve area of road, it was tried to establish the standard of non-passing distance. The close-range photogrammetry was used and three dimensional modeling was fulfilled. Currently, this paper was focused on presenting the standard of road design with analyzing the internal and external standard of non-passing distance.

Construction Strategy of Road Imagery Database for the Highway Management System (도로관리통합시스템을 위한 도로영상 데이터베이스 구축 방안)

  • Jeong Dong-Hoon;Sung Jung-Gon
    • Spatial Information Research
    • /
    • 제14권1호
    • /
    • pp.1-13
    • /
    • 2006
  • To understand road state more quickly and accurately, KICT(Korea Institute of Construction Technology) executing a project that acquire high resolution color CCD images of the whole national highway every 10m, and offer images to the HMS(Highway Management System). At this time, national highway images of the Kyeonggki-Do, Kangwon-Do and Chungcheong-Do province were linked to the HMS and being offered to user. In this paper, from acquisition using highway photologging vehicle to database construction, the whole image-related data processes are described such as match images with their positions one to one or rearrange data acquired by road line to by management office.

  • PDF

Formation of Don-am district and Adaptation of Hanok Area in Seoul (돈암지구 가구(街區)의 형성과 도시한옥의 적응)

  • Lee, Kyoung wook;Kim, Young Soo;Song, In Ho
    • Journal of architectural history
    • /
    • 제30권5호
    • /
    • pp.29-42
    • /
    • 2021
  • The Don-am district is a residential area that was supplied in 1936 as a land readjustment project(Tojiguhoekjeongri). The Don-am district was newly supplied with residential areas and urban hanoks were built in large numbers. The Don-am district was influenced by urban planning and legislation at that time. These affected in the layout and plan of urban hanok. Residential block in the Don-am district were developed sequentially from the late 1930s to the 1960s. Residential block were divided by modern construction company and sold by individual lots. The blocks supplied to the Don-am district made uniformly the corner out-off(Ga gak) for creating a vehicle-centered road. So urban hanoks located in the corner plot was transformed in response to the road. Residential blocks in Don-am district was divided into three to four rows. Therefore, alleys were created inside the block. Newly made alleys consist of a privately owned road(Sa-do), a public road(Gong-Do), and open space in the site. And the alleys were used as an entry space for sharing with neighboring. Urban hanoks of Don-am district have had changed and adapted to the formation of these alleys.

EXPLORING THE CHALLENGES TO USAGE OF BUILDING CONSTURCTION COST INDICES GHANA

  • Osei-Tutu, E;Adobor, C.D;Kissi, E.;Osei-Tutu, S.;Adjei-Kumi, T.
    • International conference on construction engineering and project management
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.313-320
    • /
    • 2017
  • Price fluctuation contract is imperative and of paramount essence in the construction industry as it provides adequate relief and cushioning for changes in the prices of input resources during construction. As a result, several methods have been devised to better help in arriving at fair recompense in the event of price chang es. However, stakeholders often appear not to be satisfied with the existing methods of fluctuation evaluation, ostensibly because of the challenges associated with them. The aim of this study was to identify the challenges to usage of building construction cost indices in Ghana. Data was gathered from contractors and quantity surveying firms. The study utilized survey questionnaire approach to elicit responses from the contractors and the consultants. Data gathered was analyzed scientifically, using the Relative Importance Index (RII) to rank the problems associated with the existing methods. The findings revealed the following among others; late release of data; inadequate recovery of costs; and work items of interest not included in the published indices as the main challenges of the existing methods. This study will provide useful lessons for policy makers and practitioners in decision making towards the usage and improvement of available indices.

  • PDF

A study for recycling plan of excavated soil and filter cake of slurry shield TBM for road construction (도로공사 이수식 쉴드 TBM 굴착토 및 필터케이크 재활용방안 연구)

  • Nam, Sung-min;Park, Seo-young;Ahn, Byung-cheol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제24권6호
    • /
    • pp.599-615
    • /
    • 2022
  • In order to excavate underground tunnel most safely such as Han river, the slurry shield TBM method is applied to cope with face of high water pressure for many metro projects. In downtown subway project most of excavated soil is discharged externally whereas in road construction excavated soil is used as filling materials so it becomes important factor for success of the project. After excavated soil, weathered rock and soft rock are discharged with bentonite through discharge pipe to slurry treatment plant then those soils are separated in separation plant according to those size. Fine grained soil has been discarded together with filter cake but it is not toxic and can be mixed with coarse aggregate in proper ratio so this study is performed to find use of qualified filling material to meet quality standard. Therefore, in this study, legal standards and quality standards for the utilization of excavated soil of the slurry shield TBM method were examined and test was conducted to derive recycling way for filter cake and aggregate. And a plan for using it as a filling material for road construction was derived. Because bentonite is a clay composed of montmorillonite, and the excavated soil in the tunnel is also non-toxic, disposal of this material can waste social cost so it is expected to be helpful in the underground space development project that carries out the TBM project by recycling it as a valuable resource.

Development of an Strategic Model for the Selection of a National IT R&D Strategic Project (국가 IT R&D 전략과제 선정 모형개발)

  • Ryu, Dong-Hyun;Park, Jeong-Yong;Lee, Woo-Jin
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • 제15권3호
    • /
    • pp.501-509
    • /
    • 2011
  • In this paper, we offer a new strategic Portfolio Model for national IT R&D project selection in Korea. A risk and return (R-R) Portfolio Model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R Portfolio Model to solve the non-strategy and subjectivity problems of the existing national R&D project selection Model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technology level Survey (TLS) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic Portfolio project and balancing the allocation of resources effectively and objectively.

The Evaluation of Forest-road Network Considering Optimum Forest-road Arrangement and Yarding Function (최적임도배치(最適林道配置) 및 집재기능(集材機能)을 고려(考慮)한 임도배치망(林道配置網) 평가(評價))

  • Park, Sang Jun;Bae, Sang Tae
    • Current Research on Agriculture and Life Sciences
    • /
    • 제19권
    • /
    • pp.45-54
    • /
    • 2001
  • This study was carried out to provide fundamental data for prospective forest-road project and forest-road network arrangement through appraising existing forest-road network with density, extension distance, maximum yarding distance and yarding area, position of forest-road line considered above foundation of two theories, one is "theory of optimal forest-road density" which has expense for yarding cost and constructing forest-road minimized, the other is "theory of optimal forest-road arrangement" which has investment effect maximized. The results are as follows. 1. In density and extension distance of the forest-road by site, it was showed up that density of existing forest-road is lower than that of calculated forest-road. So, it is thought that some additional forest-roads have to be constructed. 2. In the arrangement of the forest-road network by site, it was showed up that the arrangement of calculated forest-road is higher than that of existing forest-road arrangement for the forestry and yarding function. So, it is thought that the arrangement of forest-road network have to be considered to maximize the investment effect. 3. In "mean maximum distance for yarding" and "mean area which yarding can be done" by horizontal and inclined distance, the existing forest-road networks were different from those of calculated forest-road network. So, calculated forest-road network making investment effect maximize is more effective than existing forest-road network. Hence, in prospective forest-road project, it is needed that forest-road network having "area which yarding can be done" maximized through considering function for yarding have to be constructed.

  • PDF