• Title/Summary/Keyword: Road intensity

Search Result 185, Processing Time 0.025 seconds

AUTOMATIC ROAD NETWORK EXTRACTION. USING LIDAR RANGE AND INTENSITY DATA

  • Kim, Moon-Gie;Cho, Woo-Sug
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.79-82
    • /
    • 2005
  • Recently the necessity of road data is still being increased in industrial society, so there are many repairing and new constructions of roads at many areas. According to the development of government, city and region, the update and acquisition of road data for GIS (Geographical Information System) is very necessary. In this study, the fusion method with range data(3D Ground Coordinate System Data) and Intensity data in stand alone LiDAR data is used for road extraction and then digital image processing method is applicable. Up to date Intensity data of LiDAR is being studied. This study shows the possibility method for road extraction using Intensity data. Intensity and Range data are acquired at the same time. Therefore LiDAR does not have problems of multi-sensor data fusion method. Also the advantage of intensity data is already geocoded, same scale of real world and can make ortho-photo. Lastly, analysis of quantitative and quality is showed with extracted road image which compare with I: 1,000 digital map.

  • PDF

A Study on Optimal Planning of Sustainable Rural Road Path based on Infrastructure for Green-Tourism and Public Service (그린투어리즘 및 공공서비스 기반의 지속가능한 농촌도로노선의 최적계획에 관한 연구)

  • Kim, Dae-Sik;Chung, Ha-Woo
    • Journal of Korean Society of Rural Planning
    • /
    • v.11 no.1 s.26
    • /
    • pp.1-8
    • /
    • 2005
  • The purpose of this study is to develop a simulation model of rural road path for infrastructure of green-tourism and public service in rural areas. This study makes an objective function for moving cost minimization considering car travel time according to road characteristics, which can route the optimal shortest road paths between the center places and all rear villages, based on GIS coverages of road-village network for connecting between center places and rural villages as input data of the model. In order to verify the model algorithm, a homogeneous hexagonal network, assuming distribution of villages with same population density and equal distance between neighborhood villages on a level plane area, was tested to simulate the optimal paths between the selected center nodes and the other rear nodes, so that the test showed reasonable shortest paths and road intensity defined in this study. The model was also applied to the actual rural area, Ucheon-myun, which is located on Hoengsung-gun, Kangwon-do, with 72 rural villages, a center village (Uhang, 1st center place) in the area, a county conte. (Hoengsung-eup, 2nd center place), and a city (Wonju, 3rd center place), as upper settlement system. The three kinds of conte. place, Uhang, Hoengsung-eup, and Wonju, were considered as center places of three scenarios to simulate the optimal shortest paths between the centers and rural villages, respectively. The simulation results on the road-village network with road information about pavement and width of road show that several spans having high intensity of road are more important that the others, while some road spans have low intensity of road.

Work analysis of route survey work on forest-road (임도 노선측량 작업의 작업분석)

  • Kweon, Hyeong-Keon;Lee, Joon-Woo;Choi, Sung-Min;Yeom, In-Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.40 no.3
    • /
    • pp.209-214
    • /
    • 2013
  • This study examined the work time, work posture, and work intensity for the actual measurement step in forest road the design work that was being carried out. The measurement of the forest road was being carried by a team of three workers and a team of four workers. The examination of work time found that the measurement of 1km took about 8 hours for the four-worker team and 12 hours for the three-worker team. The examination of work intensity found that the energy metabolic rates of the three-worker team were lower than four-worker team. Because their energy consumption per minute decreased as their work time and rest time increased. Furthermore, when appropriate rest time was applied according to work time, the energy metabolic rate decreased and the work intensity became lower. The four-worker team was more advantageous from the time and cost aspects of the forest road measurement work. Furthermore, as the rest time was very low compared to the work time, more efficient forest road measurement work would be possible if the work intensity was lowered by considering the rest time when calculating the standard work time.

Characteristics of Road Runoff depending on the Rainfall Intensity (강우강도에 따른 노면유출수의 유출 특성)

  • Kim, Seog-Ku;Kim, Young-Im;Yun, Sang-Leen;Lee, Yong-Jae;Kim, Ree-Ho;Kim, Jong-Oh
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.5
    • /
    • pp.494-499
    • /
    • 2004
  • Growth in population and urbanization has progressively increased the loadings of pollutants from non-point sources as well as point sources. Therefore, it is necessary to manage both point and non-point sources contaminations for protecting water environment and improving water quality. This study investigated the characteristics of pollutant release over a wide range of rainfall intensities as a requisite to control road runoff that accounts for the largest portion of non-point source contamination in urban areas. Samples of runoff rainwater collected from real road surfaces were analyzed for physicochemical parameters such as pH, suspended solids, and heavy metals. A experimental model road ($30cm{\times}30cm$) was also used to evaluate wash-off properties of pollutants deposited on the surface as functions of time and rainfall intensity. Analysis of runoff samples on rain events showed that the pollutant wash-off patterns for heavy metal and suspended solids were similar. This implies that the particles in rainwater adsorb heavy metals. Experiments using the model road made of impervious asphalt demonstrate a strong first flush phenomenon. At high rainfall intensity, approximately 80% of total pollutants were released within 15 min. The pollutant wash-off rates rapidly increase from 9 mm/hr to 12 mm/hr of rainfall intensity and decrease over 12 mm/hr of rainfall intensity.

Analysis of Road Snow-removal Infrastructure using Road Snow-removal Historical Data (도로제설 이력자료 기반 제설 인프라 분석)

  • Kim, Jin Guk;Kim, Seoung Bum;Yang, Choong Heon
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.83-90
    • /
    • 2017
  • PURPOSES : In this study, systematic road snow-removal capabilities were estimated based on previous historical data for road-snowremoval works. The final results can be used to aid decision-making strategies for cost-effective snow-removal works by regional offices. METHODS : First, road snow-removal historical data from the road snow-removal management system (RSMS), operated by the Ministry of Land, Infrastructure and Transport, were employed to determine specific characteristics of the snow-removal capabilities by region. The actual owned amount and actual used amount of infrastructure were analyzed for the past three years. Second, the regional offices were classified using K-means clustering into groups "close" to one another. Actual used snow-removal infrastructure was determined from the number of snow-removal working days. Finally, the correlation between the de-icing materials used and infrastructure was analyzed. Significant differences were found among the amounts of used infrastructure depending on snowfall intensity for each regional office during the past three years. RESULTS:The results showed that the amount of snow-removal infrastructure used for low heavy-snowfall intensity did not appear to depend on the amount of heavy snowfall, and therefore, high variation is observed in each area. CONCLUSIONS:This implies that the final analysis results will be useful when making decisions on snow-removal works.

Experimental Study on Road-Subsidence Characteristics in Unsaturated Sandy Soils (불포화 사질토의 도로함몰 특성에 관한 실험적 연구)

  • Kweon, Gichul
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.19-25
    • /
    • 2018
  • PURPOSES : The purpose of this study is to identify the road-subsidence mechanism in unsaturated sandy soils. METHODS : A series of soil chamber tests were conducted under various conditions. RESULTS : The cavity-expansion characteristics in unsaturated sandy soils due to seepage were affected by the outlet size, seepage intensity, relative density, and fine content. CONCLUSIONS : In unsaturated sandy soils, the cavity-expansion speed was affected by the outlet size, relative density, seepage intensity, and clay content; however, the cavity-expansion shape was very similar. As the outlet size and seepage intensity increased, the cavity-expansion speed increased. As the relative density increased, the cavity-expansion speed increased because of a sudden decrease in shear strength, resulting from the increased saturation (reduction of matric suction). The cavity expanded faster with the increasing clay content, up to a certain threshold. It expanded at a slower rate once it passed the threshold. Finally, it reached a stable state where the cavity did not expand due to seepage.

An Alternative Strategy on Minor Rural Road Improvement Project (농어촌도로 정비사업의 정책적 전개방향)

  • Choi, Soo-Myung;Choi, Dong-Jin
    • Journal of Korean Society of Rural Planning
    • /
    • v.8 no.2 s.16
    • /
    • pp.42-49
    • /
    • 2002
  • Since legislation of Rural Minor Road Improvement Act 1990, a quarter of its total length had been paved now. However, over 80% of arterial road length(national+provincial roads) had been paved, so, road improvement policy should be focussed on the local road(county+rural minor roads) from now. Generally, in the greater part of coastal plain and island areas, arterial road intensity(total road length/total catchment area) is relatively low, but local road intensity is relatively high. So, in terms of balanced development, much more efforts for rural minor road improvement should be concentrated in coastal plain and islands areas. In Chonnam Province, the maximum differentials of minor rural road improvement ratio was over 20%(the lowest; 14.1% in Goheung, the highest; 35.6% in Goksung) in 1999, but the improvement budget have been allocated in proportion to unpaved road length of each county by the provincial government. However, the differentials should not be fairly narrowed in the near future if the present budget allocation policy be maintained. To solve this problem, target differentials of rural minor road improvement between regions should be set up for each planning year and road improvement budget be allocated according to this policy change.

A study of the Hydraulic & Hydrologic Causes on the Road Drainage Poor Site (노면배수 취약구간의 수리.수문 원인 분석)

  • Lee, Man-Seok;Lee, Kyung-Ha;Kang, Min-Soo;Kim, Heung-Rae
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.133-138
    • /
    • 2011
  • This study aims to compare hydraulic & hydrologic design characteristics by examining generated on weak points for road drainage poor sites. More appropriated methodology of rainfall-intensity calculated is to consider minutely rainfall-intensity decision method for road drainage basins. To use non-uniform flow analysis methodology for road surface drainage facilities inlet spacing decision methods is better than present experience inlet spacing decision equations.

Road marking classification method based on intensity of 2D Laser Scanner (신호세기를 이용한 2차원 레이저 스캐너 기반 노면표시 분류 기법)

  • Park, Seong-Hyeon;Choi, Jeong-hee;Park, Yong-Wan
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.11 no.5
    • /
    • pp.313-323
    • /
    • 2016
  • With the development of autonomous vehicle, there has been active research on advanced driver assistance system for road marking detection using vision sensor and 3D Laser scanner. However, vision sensor has the weak points that detection is difficult in situations involving severe illumination variance, such as at night, inside a tunnel or in a shaded area; and that processing time is long because of a large amount of data from both vision sensor and 3D Laser scanner. Accordingly, this paper proposes a road marking detection and classification method using single 2D Laser scanner. This method road marking detection and classification based on accumulation distance data and intensity data acquired through 2D Laser scanner. Experiments using a real autonomous vehicle in a real environment showed that calculation time decreased in comparison with 3D Laser scanner-based method, thus demonstrating the possibility of road marking type classification using single 2D Laser scanner.

Provincial Road in National Highway Traffic Volume Variation According to Rainfall Intensity (강우 강도에 따른 일반국도 지방부 도로의 교통량 변동 특성)

  • Kim, Tae-Woon;Oh, Ju-Sam
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.3
    • /
    • pp.406-414
    • /
    • 2015
  • Existing relative researches for traffic were studied under favorable weather or excluding impact of weather. This study present traffic volume variation according to rainfall intensity in national highway provincial road and rainfall-factor. Continuous traffic count section match AWS after selecting to analyze provincial road 256 section. Weekdays ADT(Average Daily Traffic) and rainfall-factor are influenced by rainfall a little because of business travel. But non-weekdays ADT and rainfall-factor are influenced much more than weekdays because of leisure travel. Estimated AADT(Annual Average Daily Traffic) by adjusting rainfall-factor is lower MAPE than non-adjusting rainfall factor. So, rainfall have to be considered when estimating AADT. ADT decrease according to rainfall intensity, continuous studies considered rainfall intensity are needed when road design and operation.