In this paper, comparison of the observed and the predicted ground deformations due to the construction of road embankment with peck drain near the construction site was made. Measurement of the ground deformation at the gasoline stand due to the construction of road embankment was made and it was compared with the predicted deformation results of Finite Element Method analysis made with Elasto-plastic and Elastic visco-plastic models. A well agreement was obtained between the measured and predicted ground deformations.
부등침하로 인한 각변위는 구조물의 안정성과 사용성에 영향을 미치는 중요한 요소 중 하나이다. 실무에서는 현재 Bjerrum이 제안한 각변위기준이 널리 사용되고 있다. 하지만 현재 도로 성토 현장에서 적용하고 있는 계측시스템은 구조물의 각변위를 적합하게 나타내지 못하고 있다. 이와 같은 문제는 충분하지 못한 계측 수, 부정확한 계측기 설치, 계측된 자료의 해석에 있어 각변위 기본개념의 잘못된 이해 등과 관련이 된다. 본 연구에서 도로 성토 현장에서 얻어진 데이터의 분석을 통해 이와 같은 문제점을 규명하였다. 도로 성토 현장에서 적용할 수 있는 자동화된 상대변위 계측시스템이라는 개선된 계측시스템을 제안하였다.
In this study, a series of geotechnical centrifugal tests were conducted to investigate the effectiveness of settlement control of two types of rigid pile structure embankments (PRSE) in collapsible loess under high-speed railway embankments. The research results show that ground reinforcement is required to reduce the post-construction settlement and settlement rate of the embankments. The rigid pile structure embankments using rigid piles can substantially reduce the embankment settlement in the construction of embankments on collapsible loess, and the efficiency in settlement reduction is affected by the pile spacing. The pile-raft structure embankments (PRSE) have much stronger ability in terms of the effectiveness of settlement control, while the pile-geogrid structure embankments (PGSE) provides rapid construction as well as economic benefits. Rational range of pile spacing of PRSE and PGSE are suggested based on the requirements of various railways design speeds. Furthermore, the time effectiveness of negative skin friction of piles and the action of pile-cap setting are also investigated. The relevant measures for improving the bearing capacity and two parts of transition zone forms as positive control mean have been suggested.
직포 보강재는 연약지반 성토시 장비주행성, 지지력 및 활동안정성 개선 등을 목적으로 활발하게 적용되고 있다. 이 논문에서는 연약지반 위에 고강도의 직포를 2층 보강하여 철도제방을 성공적으로 구축한 사례를 소개하였다. 한계평형해석에 근거한 비탈면 활동안정분석결과 연약지반 위에 고강도의 직포를 2층 보강하고 흙쌓기를 수행하였을 때 제체의 활동에 대한 안전율은 0.91에서 1.14로 약 25%증가하고, 2개월 이상의 공기단축효과가 있는 것으로 나타났다. 따라서, 공기가 촉박하거나, 안전율이 다소 부족한 현장의 경우 고강도 직포보강에 의한 연약지반처리공법은 유용한 것으로 판단된다.
성토 시공시, 경제적인 시공을 위해 절 성토량의 균형은 중요하게 고려되어야 할 사항이다. 그러나 실제 완성기면까지 성토시 성토체 자체의 압축침하와 연약지반 성토시 발생하는 제체하부 원지반의 압밀침하, 암 버럭 사이의 간극 메움에 의한 침하와 강우와 유출시 발생하는 토량 손실에 의한 성토량의 부족분이 발생하고 있다. 성토량의 부족분에 대한 지침은 도로공사 시방서에 토량환산계수를 통해 설계하도록 되어 있지만 성토체 자체의 압축침하에 의한 부족분은 고려되고 있지 않다. 따라서 본 연구에서는 이세전(伊勢田)(1972)와 석정(石井)(1976)가 제안하고 있는 성토체의 제체압축침하량 산정기법을 적용하여 국내 여러 현장의 성토체를 대상으로 발생가능한 압축침하량을 산정하였다. 본 연구결과 성토고 및 성토재의 종류에 따라 성토고의 약 3~10%내외의 전침하량이 발생하는 것으로 나타났다. 그러므로 실제 설계시 성토재의 특성 및 성토고를 고려한 성토체의 즉시침하 및 크리프 침하를 반영한 설계가 필요할 것으로 판단된다.
Road or Railway construction over soft ground is needed to be considered on secondary consolidation which will be caused differential settlement, lack of transport serviceability, higher maintenance cost. Especially for the railway construction in the second phase of Gyung-Bu or Ho-Nam high speed railway, concrete slab track has been adapted as a safe and cost effective geotechnical solution. In this case controlling the total settlement under the tolerance is essential. And pile supported geogrid reinforced construction method is suggested as a solution for the problem of the traditional method on soft soil treatments. Pile supported geogrid reinforced construction method consists of piles that are designed to transfer the load of the embankment through the compressible soil layer to a firm foundation. The load from the embankment must be effectively transferred to the piles to prevent punching of the piles through the embankment fill creating differential settlement at the surface of the embankment. The arrangement of the piles can create soil arching to carry the load of embankment to the piles. In order to minimize the number of piles geogrid reinforced pile supported construction method is being used on a regular basis. This method consists of one or more layers of geogrid reinforcement placed between the top of the piles and the bottom of the embankment. This paper presents several methods of pile supported geogrid reinforced construction and calculation results from the several methods and comparison of them.
The total embankment settlement consists of three stages: the initial settlement, the primary consolidation settlement, and the secondary consolidation settlement. The total embankment settlement is largely controlled by the primary consolidation settlement, which is usually computed with numerical models that implement Biot's theory of consolidation. The key parameter that affects the primary consolidation time is the coefficient of permeability. Due to the complex stress and strain states in the foundation soil under the embankment, to be able to predict the consolidation time more precisely, aside from porosity-dependency, the strain-dependency of the coefficient of permeability should be also taken into account in numerical analyses. In this paper, we propose a two-dimensional plane strain numerical model of embankment primary consolidation, which implements Biot's theory of consolidation with both porosity-dependent and strain-dependent coefficient of permeability. We perform several numerical simulations. First, we demonstrate the influence of the strain-dependent coefficient of permeability on the computed results. Next, we validate our numerical model by comparing computed results against in-situ measurements for two road embankments: one near the city of Saga, and the other near the city of Boston. Finally, we give our concluding remarks.
Field instrumentation has been important part of construction management in embankment on soft ground. Most of all, well organized plan, instrumentation, maintenance, analysis and feed-back to the construction procedure are the key to the successful construction. In this paper, We review problems of field instrumentation has been performed at road construction on soft ground. And then, several proposals to improve field instrumentation and management are suggested
Snow accumulation on the road frequently induces a big traffic problem in the cold snowy region. Accurate prediction on snow distribution is fundamental for solving drifting snow disasters on roads. The present study adopts the transient method to simulate the wind-induced snow distribution on embankment based on the mixture multiphase model and dynamic mesh technique. The simulation and field measurement are compared to confirm the applicability of the simulation. Furthermore, the process of snow accumulation is revealed. The effects of friction velocity and snow concentration on snow accumulation are analyzed to clarify its mechanism. The results show that the simulation agrees well with the field measurement in trends. Moreover, the snow accumulation on the embankment can be approximately divided into three stages with time, the snow firstly deposited on the windward side, then, accumulation occurs on the leeward side which induced by the wake vortex, finally, the snow distribution reaches an equilibrium state with the slope of approximately 7°. The friction velocity and duration have a significant influence on the snow accumulation, and the vortex scale directly affected the snow deposition range on the embankment leeward side.
지진시 불포화 도로성토의 붕괴는 지하수 및 강우의 침투에 기인한 함수비의 증가가 그 원인이 됨이 지적되어 왔다. 따라서, 이와 같은 지반재해의 방지를 위한 합리적 보강방안 및 적절한 설계기준의 정립을 위해 불포화 도로성토의 동적안정성 및 변형모드에 대한 함수비의 영향을 연구할 필요가 있다. 본 연구에서는 불포화 도로성토의 변형 및 파괴거동에 대한 함수비의 영향을 연구하기 위해 상이한 함수비를 갖는 도로성토 모형에 대하여 동적 원심모형실험을 진행하였다. 본 실험에서는 도로성토 모형에 대한 동적하중 부가시의 변위, 간극수압 및 가속도의 계측을 통해 최적함수비 부근 및 최적함수비보다 높은 함수비를 갖는 불포화 도로성토에 대한 동적 거동을 고찰하였다. 이와 함께, 화상해석에 의한 변위 및 변형율 분포의 분석을 통하여 최적함수비보다 높은 함수비를 갖는 불포화 도로성토의 변형모드를 구명하였다. 이로부터 사면 천단부의 침하는 천단부 아래에서의 체적압축에 기인하며, 구속압력이 작은 사면 선단부 및 사면 표면부 부근에서는 체적팽창을 동반한 큰 전단변형이 발생함을 확인하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.