Case histories on design alternatives during excavation of underground LPG storage cavern and traffic tunnel using TSP survey (TSP 탐사를 이용한 지하유류저장공동 및 도로터널의 시공 중 설계변경 사례 고찰)

  • Cha Sung-Soo;Kim Se-Hoon;Yun Sang-Pil;Bae Jung-Sik;Lee Jin-Moo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.117-136
    • /
    • 1999
  • The geophysical survey at pre-investigation stage can hardly provide the detailed information on geological structure of site which has difficulty in access and thick overburden. The TSP (VSP applied in tunnel) survey at post-investigation stage can show the detailed geology ahead of tunnel and around cavern. The TSP survey was carried out at the Pyongtaek LPG storage cavern site during the cavern excavation and provided the location and orientation of the fault inferred below Namyangho. In order to confirm the result of TSP survey four boreholes were drilled in access tunnel. The fault was also detected by borehole survey and the location was coincided with the result of TSP survey. Depend on the result of TSP survey and core logging, the design such as cavern layout and length could have been changed. As another case history the TSP survey was performed at the Mumeuje road tunnel which has poor geological information due to thick overburden. The support design was also changed on the base of TSP survey.

  • PDF

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

The characteristics of capital city plan of the BianLieng palace, the Dongjing Walled Town (東京城), the Northern song Dynasty (북송 동경 변량성의 조영과 특징)

  • Dashu, Qin
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.3
    • /
    • pp.114-159
    • /
    • 2012
  • The Northern Song Dynasty Period (北宋時代) was a drastic transitional era in all aspect of Chinese society including the politico-economic system, ideology and cultural trait. These changes that began in the late Tang (唐) Dynasty Period accomplished in the Northern Song Dynasty. In this phase, the fundamental change influenced in all institutional area; and among them, the capital city planning and its associating building technology to pile stone walls shows one of the significant change of those time. Based on the geographical factor, confluences of many rivers, the Kaifeing (開封) area where the BianLieng palace had developed as a political and economical centre since the Tang Dynasty when the Grand Canal was constructed. According to archaeological researches, the central city structure of Dongjing Walled Town was begun to plan in the late Tang Dynasty and formed in Five Dynasties. The fundamental functional change of city completed in the Midnorthern Song Dynasty. In spite of the relatively late beginning of archaeological investigations to Kaifeng Walled Town and Dongjing Walled Town due to unfavourable natural environment, excavations inaugurated since 1981 have achieved the significant investigations including the actual measurement and excavation to the outer wall, the preliminary excavation to the inner city area, the investigation and excavation to the royal palace of Song and the survey to the royal palace of King Zho in the Ming (明) Dynasty. These surveys have provide important data to reconstruct the 변량 palace, and elucidate the characteristics of city plan in the Dongjing Walled Town and the institutional change of capital city plan of the Northern Song Dynasty. The basic layout of Dongjing Walled Town reflect the realisation of ideality of the late Chinese medieval capital city structure that establish the commercial and economic centre based on the intensification of emperor's power by means of the organisation of ethical institution and the development of commercial economy. Firstly, the central place of the Kaifeng area is encircled with triple walls. This emphasise the authority of emperor located on the summit in the hierarchical ethic system succeeding to the main capital city plan of the late phase of ancient China. Secondly, the location of Dongjing Walled Town was decided by the transport network and the commercial function and defence function. Thirdly, this site shows the change of city structure and landscape of the Northern Song Dynasty. The closed Fengri (坊里: block) system transferred the open Jiexiang (街巷: road) system. Fourthly, the capital city was characterised by the free market trade and the diversification of market place. Fifthly, a convenient transport network in the Bian River, a centre of the Grand Canals, enabled to construct the Kaifeng Walled Town. Therefore, the Northern Song Dynasty continuously accomplished the developed water system as concerning about the utilisation of waterways after the construction of city.