• Title/Summary/Keyword: Road Infrastructure

Search Result 533, Processing Time 0.032 seconds

Study of control technical of cross load at New traffic system (신교통시스템의 교차로 제어기술연구)

  • Lee, Soo-Hwan;Park, Jae-Young
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1175_1176
    • /
    • 2009
  • In comparison with different mass transportation systems, the streetcar is lower, both in speed and transportation capacity. However, it has the advantage of reducing the cost of construction, because it makes infrastructure simple, by using the road. It is proper in the city, where the population is few, to raise the efficiency of traffic. The convenience is high to passengers. On time accuracy and the commercial speed is influenced by operating condition. Generally that is organized into 21m degree in 6 quantity. All passengers in a streetcar are about 180 people. The maximum speed is 40~60km/h. When road traffic is considered, the speed can be reduced to 15km/h. To enhance the speed, the construction of a priority signaling system is necessary which is integrated with the road traffic operation information system. In order to develop a better Traffic Control System which is connected to a Traffic Control Center, a Priority Signaling System which incorporates Intersection Control Technics must be included.

  • PDF

A drive-by inspection system via vehicle moving force identification

  • OBrien, E.J.;McGetrick, P.J.;Gonzalez, A.
    • Smart Structures and Systems
    • /
    • v.13 no.5
    • /
    • pp.821-848
    • /
    • 2014
  • This paper presents a novel method to carry out monitoring of transport infrastructure such as pavements and bridges through the analysis of vehicle accelerations. An algorithm is developed for the identification of dynamic vehicle-bridge interaction forces using the vehicle response. Moving force identification theory is applied to a vehicle model in order to identify these dynamic forces between the vehicle and the road and/or bridge. A coupled half-car vehicle-bridge interaction model is used in theoretical simulations to test the effectiveness of the approach in identifying the forces. The potential of the method to identify the global bending stiffness of the bridge and to predict the pavement roughness is presented. The method is tested for a range of bridge spans using theoretical simulations and the influences of road roughness and signal noise on the accuracy of the results are investigated.

INFLUENCE OF OPERATION PATTERNS OF LIGHT-DUTY FREIGHT VEHICLES ON NOx POLLUTION AT LOCAL ROADSIDES

  • Saito, A.;Ueki, S.;Takada, Y.
    • International Journal of Automotive Technology
    • /
    • v.7 no.3
    • /
    • pp.269-276
    • /
    • 2006
  • Running tests on roads were conducted to clarify the influences of road infrastructure, traffic condition and vehicle's emission level to the amount of emission at local roadsides, and to reveal the operation patterns which can reduce the emission peaks. NOx emission peaks of two light duty freight diesel vehicles which have different emission levels were evaluated by using an on-board measurement system. Tests were carried out with various payload conditions and road conditions. As a result many NOx emission peaks were observed when the vehicles were starting or accelerating at intersections. The test vehicle which has higher emission level caused higher frequency and level of NOx emission peaks. Shifting up at lower engine speed in combination with lower acceleration brought out not only reduction of NOx emission peaks level but also of $CO_2$ mass emission.

A Study on the Improvement of Automatic Text Recognition of Road Signs Using Location-based Similarity Verification (위치기반 유사도 검증을 이용한 도로표지 안내지명 자동인식 개선방안 연구)

  • Chong, Kyusoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.18 no.6
    • /
    • pp.241-250
    • /
    • 2019
  • Road signs are guide facilities for road users, and the Ministry of Land, Infrastructure and Transport has established and operated a system to enhance the convenience of managing these road signs. The role of road signs will decrease in the future autonomous driving, but they will continue to be needed. For the accurate mechanical recognition of texts on road signs, automatic road sign recognition equipment has been developed and it has applied image-based text recognition technology. Yet there are many cases of misrecognition due to irregular specifications and external environmental factors such as manual manufacturing, illumination, light reflection, and rainfall. The purpose of this study is to derive location-based destination names for finding misrecognition errors that cannot be overcome by image analysis, and to improve the automatic recognition of road signs destination names by using Levenshtein similarity verification method based on phoneme separation.

A Study about efficient maintenance of large scale cut slope (대규모 절토사면의 효율적인 유지관리를 위한 연구)

  • Park, Jae-Young;Shin, Chang-Gun;Jung, Sang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1051-1056
    • /
    • 2009
  • Recently, there are many wide road in korea, so The Large scale cut slopes are increasing. Large scale cut slopes are better then small scale in case of construction and maintenance. General, Reinforced Slopes by Shotcrete are difficult to inspect because of stiff Slope and highly Working Area. So the Inspection Techniques are needed by the Non-contact and Non-destructive. On this Study, We are studying the method about efficient valuation and maintenance of Large scale Reinforced slopes by Shotcrete.

  • PDF

A Study Of Case On Prescription Of Spring Out Water In Cut Slope (절취사면 용출수의 효율적인 배제에 대한 사례연구)

  • Shin, Chang-Gun;Seo, Jeong-Yoo;Hong, Nam-Kyeong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1095-1099
    • /
    • 2009
  • In general, slope failures are occurred by the interaction among various factors(slope shape, hydraulic condition, and geologic condition, etc.). Hydraulic condition was a very important factor of a stability in cut slope and a dangerous of road passing. In this study, two cut-slope case on prescription of spring out water present. And this study data is used at practical affairs.

  • PDF

Infrastructure Integration, Poverty, and Inequality in Developing Countries: A Case Study of BRI Transport in the Lao PDR

  • Vanxay Sayavong
    • East Asian Economic Review
    • /
    • v.26 no.4
    • /
    • pp.305-336
    • /
    • 2022
  • This study applied the macro-micro simulation model (i.e., what-if analysis) to investigate the impact of transport related to the Belt and Road Initiative (BRI) on poverty and income inequality in Laos. We selected Laos as a case study of a developing country. We used the standard GTAP model with the GTAP database (version 10) for the macrosimulation, whereas we used the household model with the latest Lao household data from 2019 for the microsimulation. Our findings revealed that the output of the Lao economy was anticipated to increase by up to 0.3%, while the poverty rate was anticipated to decline from 17.0% to 15.7%. However, there would be winners and losers in industries and groups of households in different areas. In particular, rich households with a comparative socioeconomic advantage, such as in education, engagement in nonfarm business, and infrastructure access, would mostly gain benefits; consequently, this would lead to higher inequality in Laos. Therefore, the inequality index (i.e., the Gini coefficient) would increase from 41.2 to 60.1. After a simulation of BRI transport, we also found that some nonpoor households, which are mainly associated with farm activities and lower educational levels, would fall into poverty.

Robust Obstacle Detection and Avoidance Algorithm for Infrastructure-Based Vehicle Communication Under Signal Interference (중계기를 통한 다중 차량 간 통신 상황에서 신호 간섭에 강한 장애물 감지 및 회피 알고리즘)

  • Choi, Byung Chan;Kwon, Hyuk Chan;Son, Jin Hee;Nam, Haewoon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.5
    • /
    • pp.574-580
    • /
    • 2016
  • In this paper, we will introduce the system that can control multiple vehicles on the road through Single Board Computers and V2I (Vehicle-To-Infrastructure). Also, we will propose the group evasive maneuver decision algorithm, which plays a critical role in deciding whether the vehicles in the system have to conduct evasive maneuvers to avoid obstacles on the road. In order to test this system, we have utilized Wi-Fi and TCP/IP for establishing the communication between multiple vehicles and the relay server, and observed their driving states on the road with obstacles. During the experiments, we have discovered that our original decision algorithm possesses high failure rate when there is frequency interference in ISM (Industrial Scientific Medical) band. In order to reduce this failure rate, we have implemented the data transition detector. This paper will focus on how the use of data transition detector can affect the reliability of the system under the frequency interference of ISM band. If this technology is improved and applied in the field, we will effectively deal with such dangerous situations as multiple collision accidents through vehicle-to-vehicle communication or vehicle-to-infrastructure communication. Furthermore, this can be applied to the autonomous driving technologies. This can be used as the reference data for the development of the similar system.

Valuation of highway O&M contract using real option (실물옵션을 활용한 고속 도로 유지관리 계약의 가치산정)

  • Park, Taeil;Shin, Eun-Young;Lee, Yoo-Sub
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5964-5970
    • /
    • 2013
  • The recent budget planning for highway infrastructure implied that the investments for Operation & Maintenance(O&M) became greater than that for new construction. This circumstance made many stakeholders pay attention to the O&M of road infrastructure and adopt other countries' policies and system for effective management. In other countries, most O&M for road infrastructure have been done by private entities using long-term contract and Korea is about to shift from one year contract to long-term contract. The most important parts for the expansion of the long-term O&M contract for road infrastructure are valuation of the O&M contract based on accurate prediction of O&M costs and instrument for proper risk sharing between contracting parties. Thus, this study provides a methodology to estimate a reasonable O&M contract price and a framework to share contract risk between contracting parties using real option. The analysis results showed that the contract price and ceiling and floor conditions for the 20 year-contract of 20 km-highway project were 45.7, 60 and 42.3 billion won, respectively.

Private Procurement for Constructions and Operation of Buman Road in Daegu (도시 인프라 시설을 위한 민자 유치 -대구시 범안로 민자도로의 운영 실태와 대책-)

  • Choi, Byung-Doo
    • Journal of the Korean association of regional geographers
    • /
    • v.13 no.6
    • /
    • pp.674-694
    • /
    • 2007
  • Recently private procurement projects for urban infrastructure have been emphasized and introduced by government(both central and local) as an important method to supplement public budget shortage and to improve creativity and efficiency in its construction and operation, and hence to promote regional development. But these private procurement projects seem to be implemented under the neoliberal condition of urban policy for private capital to extend its sphere of investment and to ensure its opportunity of profit. Such private procurement projects for urban infrastructure have been legislated and widely applied since 1994 in S. Korea, but in recent years they have triggered out a variety of serious problems. In results of this study on the private procurement for construction and operation of Burnan Road in Daegu, it can be pointed out, it has led serious problems such as overestimation of traffic volume in plan, over-appropriation of construction cost and appurtenant business, irYational operation and account of the operating firm, problem in refinancing and change in contents of practical agreement, and over-compensation of minimum operation revenue. Some measures that can be considered as alternatives to resolve those problems and to operate more rationally the Buman Road include those of increasing traffic revenues, of reducing supports of public financing, and withdrawal of (part or whole of) operational right from the private firm.

  • PDF