• Title/Summary/Keyword: Road Geometry

Search Result 159, Processing Time 0.024 seconds

Design Criteria of Traffic Island Considering Pedestrian LOS (보행자 서비스 수준을 고려한 교통섬 설계기준 연구)

  • Park, Byung Ho;Beak, Tae Hun;Jung, Yong Il
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.5
    • /
    • pp.23-31
    • /
    • 2012
  • The objective of this study is to develop the design criteria of traffic island considering pedestrian level of service (LOS). In pursuing the above, this study gives particular emphasis to suggesting the minimum design space of traffic island in order to maintain pedestrian LOS C and D, and the critical pedestrian traffic volume that reflects the intersection geometry (2 lanes per direction) through the simulation analysis. The main results are as follows. First, the spaces of 160 traffic islands, which meet the pedestrian LOS C and D and reflects the pedestrian traffic volume by signal cycle, are drawn by using a commercial simulator VISSIM. The relevant spaces of traffic island in terms of both the pedestrian LOS and the pedestrian traffic volume are evaluated to range from $3.0m^2$ to $41m^2$. Second, the critical pedestrian traffic volume for the operation of traffic island is evaluated to be 1,000-1,300 person/hour at LOS C and 1,600-1,800 person/hour at LOS D, respectively, when a cycle of 120-150 seconds were applied to a intersection with two lanes per direction.

Pedestrian Accident Rate Models of Circular Intersection Near Schools (학교와 인접한 원형교차로의 보행자 사고율 모형)

  • SON, Seul Ki;LEE, Min Yeong;PARK, Byung Ho
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.4
    • /
    • pp.321-331
    • /
    • 2017
  • The objective of this study is to analyze the factors affecting the pedestrian accidents of roundabout near schools. To this end, this study has focus on the comparative analysis of pedestrian accidents across different school areas. The traffic accident data from 2007 to 2014 are collected from TAAS data set of Road Traffic Authority. To develop the pedestrian accident rate model, the linear regression model has been utilized in this study. 28 explanatory variables such as geometry and traffic volume factors are used. The main results are summarized as follows. First, the null hypotheses that the number of pedestrian accidents are the same are rejected. Second, 5 multiple linear regression accident models with higher statistical significance (adjusted $R^2$ of 0.651~0.788) have been developed. Third, while the common variables of 3 models (model I~III) related to school location are evaluated to be the pedestrian island, crosswalk, types of roundabout, elementary school and bus stop. Fourth, while the common variable of 3 models (model III~V) related to near school area or not is evaluated to be pedestrian island, type of roundabout, sidewalk, elementary school, speed hump, speed limit sign and number of entry lane. As a result, the installation of pedestrian islands and crosswalk might be expected to decrease the number of pedestrian accidents near schools.

Two-Dimensional Flood Inundation Analysis Resulting from Irrigation Reservoir Failure - Focused on the Real Case with the Minimal Data Set - (농업용 저수지 붕괴에 따른 2차원 홍수범람해석 -계측자료가 부족한 실제사례를 중심으로-)

  • Lee, Jae Young;Kim, Byunghyun;Park, Jun Hyung;Han, Kun Yeun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.231-243
    • /
    • 2016
  • This study presents the applicability of two-dimensional (2D) flood inundation model by applying to real irrigation reservoir failure with limited available data. The study area is Sandae Reservoir placed in Gyeongju and downstream area of it and the reservoir was failured by piping in 2013. The breach hydrograph was estimated from one-dimensional (1D) hydrodynamic model and the discharge was employed for upstream boundary of 2D flood inundation model. Topography of study area was generated by integrating digital contour map and satellite data, and Cartesian grids with 3m resolution to consider geometry of building, road and public stadium were used for 2D flood inundation analysis. The model validation was carried out by comparing predictions with field survey data including reservoir breach outflow, flood extent, flood height and arrival time, and identifying rational ranges with allowed error. In addition, the applicability of 2D model is examined using different simulation conditions involving grid size, building and roughness coefficient. This study is expected to contributed to analysis of irrigation reservoirs were at risk of a failure and setting up Emergency Action Plan (EAP) against irrigation reservoir failure.

Forecasting of Probability of Accident by Analizing the Traffic Accident Data : Main Intersections on Arterial Roads in Busan (교통사고 데이터분석을 통한 교통사고 위험도 산정 : 부산시 주간선도로 주요교차로를 대상으로)

  • Jung, Kun Young;Bae, Sang Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.111-117
    • /
    • 2017
  • The purpose of forecasting the traffic accident is to reduce the traffic accident. Therefore, the goal of this study is to provide severity of the accident by Forecasting of Probability of Accident. In Korea, accident data are distributed to the public via internet that includes numbers of accident and fatality as well. And crude level of accident severity in accordance with weather information for metropolitan city level are available by weekly. However, It can not reflect personal needs at specific origin of the travel for a certain traveller. This study aims to consider 68 major intersections with precipitation data, and eventually introduces link based accident severity. In estimating the accident severity both dynamic data such as drivers' characteristics, driving conditions and static data such as geometry of road, intersection characteristics are considered. Also, we identifies accident severity according to the accident type - 'vehicle to vehicle,' 'vehicle to person.' Finally, the outcomes of this study suggests taylor-made accident severity information for a specific traveller for a certain route.

Development of Travel Time Functions Considering Intersection Delay (교차로 지체를 고려한 통행시간함수 개발)

  • Oh, Sang-Jin;Park, Sang-Hyuk;Park, Byung-Ho
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.4
    • /
    • pp.63-76
    • /
    • 2008
  • The goals of this study are to develop travel time functions based on intersection delay and to analyze the applicability of the functions to traffic assignment models. The study begins with the premise that the existing assignment models can not effectively account for intersection delay time. In pursuing the goals, this study gives particular attention to dividing the link travel time into link moving time and stopped time at node, making the models based on such variables as the travel speed, volume, geometry, and signal data of signalized intersections in Cheongju, and analyzing the applicability of these models to traffic assignment. There are several major findings. First, the study presents the revised percentage of lanes (considering type of intersection) instead of g/C for calculating intersection delay, which is analyzed to be significant in the paired t-test. Second, the assigned results of applying these models to the Cheongju network in EMME/2 are compared with the data observed from a test car survey in Cheongju. The analyses show that the BPR models do not consider the intersection delay, but the modified uniform delay model and modified Webster model are comparatively well fitted to the observed data. Finally, the assigned results of applying these models are statistically compared with the test car survey data in assigned volume, travel time, and average speed. The results show that the estimates from the divided travel time model are better fitted to observed data than those from the BPR model.

Evaluation of Tractive Performance of an Underwater Tracked Vehicle Based on Soil-track Interaction Theory (궤도-지반 상호작용 이론을 활용한 해저궤도차량의 구동성능 평가)

  • Baek, Sung-Ha;Shin, Gyu-Beom;Kwon, Osoon;Chung, Choong-Ki
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.2
    • /
    • pp.43-54
    • /
    • 2018
  • Underwater tracked vehicle is employed to perform underwater heavy works on saturated seafloor. When an underwater tracked vehicle travels on the seafloor, shearing action and ground settlement take place on the soil-track interface, which develops the soil thrust and soil resistance, respectively, and they restrict the tractive performance of an underwater tracked vehicle. Thus, unlike the paved road, underwater tracked vehicle performance does not solely rely on its engine thrust, but also on the soil-track interaction. This paper aimed at evaluating the tractive performance of an underwater tracked vehicle with respect to ground conditions (soil type, and relative density or consistency) and vehicle conditions (weight of vehicle, and geometry of track system), based on the soil-track interaction theory. The results showed that sandy ground and silty sandy ground generally provide sufficient tractions for an underwater tracked vehicle whereas tractive performance is very much restricted on clayey ground, especially for a heavy-weighted underwater tracked vehicle. Thus, it is concluded that an underwater tracked vehicle needs additional equipment to enhance the tractive performance on the clayey ground.

Analysis of the Influence of Road·Traffic Conditions and Weather on the Take-over of a Conditional Autonomous Vehicle (도로·교통 조건 및 기상 상황이 부분 자율주행자동차의 제어권전환에 미치는 영향 분석)

  • Park, Sungho;Yun, YongWon;Ko, Hangeom;Jeong, Harim;Yun, Ilsoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.6
    • /
    • pp.235-249
    • /
    • 2020
  • The Ministry of Land, Infrastructure and Transport established safety standards for Level 3 autonomous vehicles for the first time in the world in December 2019, and specified the safety standards for conditional autonomous driving systems. Accordingly, it is necessary to analyze the influence of various driving environments on take-over. In this study, using a driving simulator, we investigated how traffic conditions and weather conditions affect take-over time and stabilization time. The experimental procedure was conducted in the order of preliminary training, practice driving, and test driving, and the test driving was conducted by dividing into a traffic density and geometry experiment and a weather environment experiment. As a result of the experiment, it was analyzed that the traffic volume and weather environment did not affect the take-over time and take-over stabilization time, and only the curve radius affects take-over stabilization time.

The Operation Analysis of Signalized Intersections Using ICU Method (ICU 방법을 활용한 신호교차로 운영분석)

  • Kim, Young Chan;Jeon, Jae Hyeon;Jeong, Young Je;Kim, Eun Jeoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.41-48
    • /
    • 2009
  • The capacity analysis of signalized intersection usually includes a HCM method used at home and abroad and a ICU method this study presents. The HCM method focuses on operation analysis measuring an intersection's delay in terms of given traffic volume, signal operation, and intersection structure data. This method includes planning and design analysis, but these analyses are complex due to being possible through repetitive operation analysis. However the ICU method is a powerful tool for planning and design analysis, because these are possible through brief traffic volume and geometry structure data and consider minimum green time. In this study, the authors studied the ICU method and compared the HCM and ICU by analyzing traffic volume scenarios. Also to consider effectiveness for application of the ICU method, the authors applied the ICU to capacity analysis of intersections on urban arterial for setting major intersection and effect analysis for changing crosswalk type, the number of lane, lane use and operation form of left turn. The result of the analyses shows that the ICU method can measure correct capacity of intersection consist of a broad road in urban area, and is effective for planning and design analysis. This study is expected that traffic experts can grasp correct intersection's capacity and carry out a proper planning or improvement by applying the ICU method to planning and design analysis.

Mitigation of Insufficient Capacity Problems of Central Bus Stops by Controlling Effective Green Time (유효녹색시간 조정을 활용한 중앙버스정류장 용량 부족 완화 방안 연구)

  • Koo, Kyo Min;Lee, Jae Duk;Ahn, Se Young;Chang, Iljoon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.1
    • /
    • pp.35-50
    • /
    • 2022
  • After the introduction of the central bus lane system, bus traffic was prioritized. This resulted in improved trust from bus users. However, the low capacity at the central bus stop reduces traffic speed and punctuality. In addition, physical constraints are inevitable because the construction of central bus lanes and bus stops considers the city's road geometry. Therefore, this study attempted to optimize the effective green time of the traffic signal system at the entrance and exit of the central bus stop to remedy its insufficient operational capacity. The Transit Capacity and Quality of Service Manual and Korea Highway Capacity Manual were used as the analysis methodologies. The number of stop areas for central bus stops to be built was determined by excluding variable physical factors, and field survey data collected from nine randomly selected central bus stops currently installed in Seoul were used. A scenario analysis was conducted on the central bus stops with insufficient capacity by adjusting the effective green time, and the capacity of the central bus stop was set as the dependent variable. According to the results, 26.7 percent of the central bus stops with insufficient capacity can solve the problem of insufficient capacity. Therefore, the results of this study can be verified by improving the operation level, and it can be effective even if the number of central bus stops calculated by engineering is not guaranteed during the planning stage of the central bus stop. As the number of central bus stops is expected to increase further as the number of central bus stops increases, it is necessary to improve the number of central bus stops. Therefore, it is hoped that the results presented in this study will be used as basic data for the improvement plan at the operational level before introducing the physical improvement plan.