• 제목/요약/키워드: Road Construction

Search Result 2,079, Processing Time 0.034 seconds

Design on Slopes Revegetation and Tentative Instruction on Construction Work (비탈면 녹화 설계 및 시공 잠정 지침)

  • Jeon, Gi-Seong;Kim, Nam-Choon;Lee, Tae-Ock
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.1
    • /
    • pp.100-113
    • /
    • 2007
  • In Korea, there has been no revegetation applicable standard for slopes formed by road construction work up to now, so revegetation work has been done using mostly foreign varieties in the manner of early revegetation. However, foreign varieties have some shortcomings; for example, they tend to be dried to death after construction work. Besides, due to the rift in the supporting soil, these revegetated varieties are often displaced from the slopes. Thus, the Ministry of Construction & Transportation on July, 2005 established revegetation standard on the slopes suited for the natural eco-system of Korea and organized positively recommending directions for using self-sewn plants growing near the slopes in overall consideration of soil, weather, regional conditions. The locations specified in this direction are the slopes at the road construction jobsite like the expressway, highways, and local roads. In addition, the Ministry's standard and directions stipulated that damaged slopes's natural environment and eco-system due to various road construction work should be restored, and thus a feeling of stability and pleasantness should be provided to road users as well. Also, the Ministry tried to select seed plants and revegetation measures suited for surrounding environment to put the environment-friendly slope revegetation measures into practice through the test revegetation work in order to prevent illegal construction practices and to improve the quality of revegetation. According to the direction, revegetation districts aimed at the slopes are divided into three ones in consideration of weather environment, regional environment, and forest environment as follows : national territory's core ecological green-land based district centering on the Taebaek Mountains; coastal ecosystem district including islands off the coast; inland eco-system district. The combination of revegetation plants according to environment revegetation districts, should be executed by dividing into herb-oriented type, woody plant colony type, and bio-species versatility restoration type, and the selection of seeding plants should be done in the presence of a supervisor and through test construction results and technology counseling from a specialist in natural eco-system restoration and revegetation measure seed combination standard according to environment revegetation districts. This direction will be executed in the manner of monitoring until the yea 2008 and 2009 it will be finalized and enforced on December, 2009.

A Strategy for Developing New Road Projects (경관도로 등 신개념의 도로사업 개발에 관한 연구)

  • Kim, Eung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.115-127
    • /
    • 2007
  • Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.

  • PDF

Studies on the Design of Forest Road Network for Mechanized Yarding Operations (II) - Optimal road spacing and density - (기계화(機械化) 집재작업(集材作業)을 위한 노망정비(路網整備)에 관(關)한 연구(硏究)(II) - 적정임도간격(適正林道間隔) 및 임도밀도(林道密度) -)

  • Cha, Du Song;Cho, Koo Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.3
    • /
    • pp.299-310
    • /
    • 1994
  • This study was carried out to examine the optimal road spacing and road density to minimize the total harvesting cost(road construction cost plus yarding cost) for mechanized yarding system to roadside by one - and two-stage two-way in Forestry build-up region. Chunchon-kun, Kangwon-do. The estimated road construction costs were ranged from ten million won to sixty million won per km. The results have indicated that cable crane was appropriate for yarding machine by one-stage, two-way, and estimated optimal road spacing was 1,698m~4,192m, averaged 3,087m, and road density was 3.44m/ha~8.44m/ha, and averaged 5. 12m/ha. In hilly terrain, combination of medium yarder and Logging bogie was suited to yarding machine by two-stage, two-way, and calculated optimal road spacing was 1,483m~3,481m, averaged 2,589m, and road density was 4.05m/ha~9.46m/ha, averaged 5.90m/ha. In steep terrain, combination of medium yarder and jinsung winch was suited, and estimated optimal road spacing was 1,693m~3,982m, averaged 2,960m, and road density was 3.68m/ha~8.64m/ha, averaged 5.38m/ha.

  • PDF

A Development of the Operating Speed Estimation Model of Truck on Four-lane Rural Highway (지방부 일반국도 4차로의 화물차 주행속도 예측모형 개발)

  • Park, Min Ho;Lee, Geun Hee
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.173-182
    • /
    • 2014
  • PURPOSES : The purpose of the study is to a) explore the operating speed of trucks on rural highways affected by road geometry, and thereby b) develop a predictive model for the operating speed of trucks on rural highways. METHODS : Considering that most of the existing studies have focused on cars, the current study aimed to predict the operating speed of trucks by conducting linear regression analysis on the speed data of trucks operating on the linear-curved-linear portions of the road as a single set. RESULTS : The operating speed in the plane curve portion increased with the length of the curve, and decreased with a lower vertical grade and a smaller curve radius. In the straight plane portion, the operating speed increased with a larger curve radius(upstream), and decreased with an increase in the change of the vertical grade, depending on the length of the vertical curve. CONCLUSIONS : This study developed estimation models of truck for operational speed and evaluated the degree of safety for horizontal and vertical alignments simultaneous. In order to represent whole area of the rural highway, the models should be ew-analyzed with vast data related with road alignment factor in the near future.

Permeability Influence of Base Soil for Analysis of Road Landfill Stability (도로성토사면의 안정성 분석시 원지반 투수성의 영향)

  • Kim, Young-Muk;Kim, Chung-Ki;Kim, Man-Goo;Kim, Geon-Hae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.890-897
    • /
    • 2005
  • Stability of embankment is influenced on landfill condition, permeability, shear strength and soil engineering propensity and so on, and need examination in reply because is different according to change of soil property of foundation ground and permeability condition. Analyzed seepage behaviour by finite element method for embankment, and change permeability of base to analyze effect that permeability of ground water table formation before embankment and analyze seepage behaviour to typical embankment in this research. In the case of permeability of foundation ground is 10 more than landfill permeability, rise of groundwater table was changed slightly. Pore water pressure was decreased slowly in landfill after rainfall. The effect of permeability of foundation ground was effected in change of pore water pressure. For permeability of foundation ground is 10 more than landfill, stability of road landfill was small changed during rainfall. But in the case of permeability of base soil similar to landfill permeability, road landfill stability was large decreased during rainfall.

  • PDF

Study on Discharge Electrode Design applied for Road Tunnel (터널용 전기집진시스템 개발을 위한 방전극 설계)

  • Kim, Jong-Ryul;Weon, Jong-Oung;Jang, Chun-Man
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1238-1243
    • /
    • 2009
  • As Social Overhead Capital(SOC) has been expanded, the highway road construction has been accelerated and city road system has been more complicated. So, long road tunnels have been increased and traffic flow rate also has been raised. Accordingly, the exhausting gas of vehicle cars seriously deteriorates the tunnel inside air quality and driving view. In order to improve tunnel inside air quality, it is needed to introduce a compulsory ventilation system as well as natural ventilation mechanism. The former, that is, a special compulsory ventilation facility is very useful and helpful to prevent a tunnel of being contaminated by traffic in most case. In the case of obtaining clearer and longer driving view, the ventilation systems have to be considered in order to remove floating contaminants or exhaust gas from engines. In this paper, discharge electrode design technology will be discussed.

  • PDF

Proposing a BIM Activation Plan in Civil Projects by Investigating Guidelines in Procurement Processes - Proposing Contents of Guidelines to Support BIM Project in the Road Sector - (국내 발주지침 보완을 통한 토목분야 BIM 활성화 전략 제안 - 도로분야 BIM 프로젝트 지원을 위한 과업지시서 구성요소 제안 -)

  • Choi, Go-eun;Lee, Jaewook;Hong, Chang Hee;Moon, Hyeonsuk;Kim, Do Young
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.47-57
    • /
    • 2023
  • The purpose of this study is to propose a guideline to help the client and bidder operate the BIM project in the domestic road field. As BIM design is mandatory in the construction field, documents disclosed by the ordering agency must essentially include procedures and step-by-step requirements to support BIM. The purpose of this study is to propose the structure and components of the guidelines that practitioners need practically by utilizing the currently announced road field guidelines. The guidelines are analyzed based on the procurement documents that were pre-emptively shared overseas, and supplemented according to the domestic situation. Furthermore, the effectiveness of the revised guidelines is confirmed through expert consultation. This study aims to contribute to creating an environment in which construction practitioners who have no experience in BIM project can efficiently carry out BIM projects.

Application of Simulation for Road Design Evaluation (도로설계 평가를 위한 3차원 시뮬레이션 적용)

  • Kim, Ga-Ya;Jung, Beam-Seok;Kim, Nam-Seok
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.2
    • /
    • pp.121-131
    • /
    • 2008
  • Two dimensional road design is connoting danger factor because different point between design standard and driver's reaction. Consequently two dimensional road design is difficult to recognize problem that happen beforehand when before construction. Therefore three dimensional road design that can grasp problem after completion is required. In this study, three dimensional road was designed to evaluate road that is designed. Road designed by Inroad that is road design program. DTM is created using digital map and elevation data. Three dimensional road was designed by integrated DTM of road and topography. Road design evaluation was performed in three dimension. Driving simulation and sight distance assessment were carried out to estimate stability of alignment. Shadow simulation was executed on icy road section for bad section of icy road surface. As a result of evaluation, this study could confirm shape of road after completion. And sight distance could be calculated and visually confirmed. Also, icy road sections were extracted through shadow simulation.

  • PDF

Abrasion-Resistant Road Markings for Improved Durability Lane to Wear Simulators Test (차선재료의 내구성 향상을 위한 내마모성 시험 적용 연구)

  • Lee, Chang-Geun;Park, Jin-Hwan;Oh, Heung-Un
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.75-82
    • /
    • 2011
  • There is the uncertain period of the construction in case of the products meeting the quality standard of KS M 6080, the quality is degraded because of the abrasive loss of the paint caused by vehicle tires as the traffic amount increases and of the loss and detachment of the glass beads providing the retroreflective function. The abrupt degradation of visibility causes the high frequency of traffic accidents at night and increases the traffic accident rate. Additional supplementary construction induces the direct material and construction costs. As the more cost induction effect than the direct cost, the traffic jam caused by the additional construction increases the indirect social costs such as time cost and vehicle cost. Hence, the study is concerned with performing the abrasion resistance test based on the EN 1436 standard to check and improve the quality of various road marking materials resulting in improving the durability of road marking materials. However, even though the difference in the durability lifetime of resins(binders) is bibliographically or theoretically clear, there was no difference in the durability lifetime (retroreflectivity aspect) of the road marking paint using these binders. The reason is that the bonding of beads was very insufficient or that the cross density caused by crack or freshness was low. Moreover, the measured wet retroreflectivity was distributed as the Rw3 or higher class in average on the basis of EN 1436 but was very insufficient on the basis of the minimum wet threshold retroreflectivity with 100mcd/($m^2{\cdot}lx$) managed overseas.

Tendency for Vegetation Recovery Years after Forest Road Construction (임도 개설 후 경과년수에 따른 식생 회복 경향)

  • Sung-Yeon Lee;Chung-Weon Yun
    • Journal of Korean Society of Forest Science
    • /
    • v.113 no.3
    • /
    • pp.327-338
    • /
    • 2024
  • Forest road construction can degrade the physical and biological environments of forest ecosystems. Although this degradation may be temporary, some research has shown the potential for the long-term recovery of the original ecosystem. This study investigated changes in communities' structures over time to understand the process of ecosystem change following road construction. Data were collected from 63 plots, each measuring 25m2, in Buyeo-gun, Chungcheongnam-do, including plots from roads constructed in 1998 (25 years elapsed), 2021 (two years elapsed), and 2022 (one year elapsed), using phytosociological methods. The results showed that the importance of the values of Pinus densiflora an d Quercus variabilis in the tree and subtree layers of the 25-year-old cut slopes were similar to those of the control plots, indicating the significant recovery of the original ecosystem's structure and function after 25 years. Species diversity analysis revealed the higher evenness and lower dominance of the cut slopes and road surfaces attributed to the high dominance of species such as Arundinella hirta and Miscanthus sinensis. The community similarity index and detrended correspondence analysis (DCA) indicated that the control plots, all the edge plots, and the 25-year-old cut slopes could be considered part of the same community. In conclusion, forest roads in place for 25 years appear to have been restored to the level of the original ecosystem. These findings can serve as valuable ecological data for understanding the vegetation recovery process at future forest road construction sites.