• Title/Summary/Keyword: Road Construction

Search Result 2,064, Processing Time 0.025 seconds

A Study on Analysis of Issues in Developing a Basic Road Transport Database and Proposals for Enhancing Its Reliability and Data Sharing (with Focus on Databases Related to Road Transport Demand Estimation) (도로부문 교통기초자료 구축사업의 문제점 분석 및 개선방안 연구 (교통수요 예측 자료를 중심으로))

  • Lee, Sang-Hyeop;O, Chang-Seok
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.6
    • /
    • pp.55-67
    • /
    • 2009
  • In Korea, previously implemented road construction project caused a big budget waste due to overestimation of transport demand. There could be reasons for such inaccuracy of transport demand estimation, but the main reasons are: (1) low reliability of used basic road transport data and (2) inadequate sharing of data among agencies/departments. The National Transport Database and the Household Travel Database in Seoul Metropolitan Area, two representing basic road transport database, will be used to the establishment of a road construction plan that will be promoted afterwards. However, these materials have problems such as low reliability and inadequateness, too. Hence, focusing on transport demand estimation related databases, this paper will make proposals for enhancing their reliability and data sharing.

Analysis of Road Pavement Condition and Structural Improvement Plan (서울시 도로포장 상태에 대한 분석 및 구조적 개선방안)

  • Bae, Yoon-Shin;Shin, Kyoung-Yub
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.2
    • /
    • pp.119-137
    • /
    • 2012
  • In this study, the damages and condition of road pavement were analyzed using pavement management system (PMS) for the structural improvement. Problems of road pavement management were issued by in-depth interview with workers in charge of plant, construction and supervision. By surveying advanced road pavement management, the way how to improve road pavement management in Seoul was discussed. In conclusion, it is necessary to take measures against road heavy traffic and heavy rain in summer. It was found that the problem of early damages of road pavement due to uniform layout with analyzing life cycle cost (LCC). According to the results of survey, it was suggested to strength practical training and to control precisely the temperature of pavement in the process of production and construction.

Estimation of Greenhouse Gas Emission from Off-road Transportation (비도로 수송에 의한 온실 가스 배출량 추정)

  • Choi, Min ae;Kim, Jeong;Lee, Ho Jin;Jang, Young Kee
    • Journal of Climate Change Research
    • /
    • v.1 no.3
    • /
    • pp.211-217
    • /
    • 2010
  • Off-road transportation sector including construction equipment, ground support equipment in airport, cargo handling equipment and agroforestry machinery have not calculated as emission source classification in 1A3e2. In this study, the statistics of oil consumption for construction, aviation, shipping and agroforestry are separated for this sector by oil type. And the greenhouse gas emission by off-road transportation emission factor in 1996 & 2006 IPCC Guidelines are calculated and compared with each other. As a result, the nationwide $CO_2$ equivalent emission from off-road transportations by the emission factor of 1996 & 2006 IPCC Guidelines are calculated as 4,919 kton/yr and 5,530 kton/yr in 2007. The contribution ratio of off-road transportation emission by this study is estimated as 5.5% to the subtotal emission from on-road transport sector.

A Study on the Test Bed Evaluation for the Ecological Restoration of Unused Road - Focused on the Experimental Construction Site in Young Dong Province of GyungBu Expressway(Seven years after construction.) - (폐도로 생태복원을 위한 시험시공지 평가 연구 - 경부선 영동군 황간지역 시험시공지에 대한 시공 후 7년 시점의 추적조사 -)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.5
    • /
    • pp.47-57
    • /
    • 2016
  • In the recent years, the incidence of abandoned concrete roads have been increasing rapidly due to road improvements and facilities route construction, these abandoned expressway and unused roads are scattered throughout the country but the management system is not clear, they does not be an effectively managed because there is no maintenance cost. In response to these social concern and expectation, the Korea Expressway Corporation that is management authority of the expressway is developing policy initiatives and various projects to restore the closed road to ecological for eco-friendly projects of the existing expressway. And as part of these projects, Hwanggan IC unmanaged abandoned concrete roads restoration project was done and it was conducting monitoring for ecological restoration that is not one-off but sustainable. After test construction over seven years at the time, test construction of four ways enforced but the boundaries have become blurred over time. And Pinus koraiensis, Callicarpa dichotoma and Sorbaria stellipilla var. typica planted in the site are dominating, else Amorpha fruticosa and Indigofera pseudotinctoria sowed are dominating. Invasive species is that Robinia pseudoacacia was growing in the colony. Over monitoring result time, the vegetation was taking root and the ecosystem was being restore. But the disturbance of vegetation happens due to planting of tree species that doesn't fit in the restoration area and advent of ecosystem Disturbing Species. The study will be providing a basic data that identify change of plant environment by monitoring of the site and soil environment during June to November 2016 and secure an objective evaluation data by analyzing the effects of ecological restoration for revegetation test bed evaluation for ecological restoration of expressway in ecological restoration construction in later.

Practical use of LiDAR data for Environment-friendly Road Design (친환경 도로 설계를 위한 항공레이저측량 데이터의 활용)

  • Lee, Hyun-Jik;Park, Eun-Gwan;Ru, Ji-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.3
    • /
    • pp.255-262
    • /
    • 2008
  • Value of natural environment and the importance of conservation are augmented gradually, and collision of environment conservation and development are caused in various construction industries. In this study, Presented practical use way to ecological road design using vegetation information and high precision 3-dimensional geo-spatial data for minimizing pollution. Also, analyzed freezing danger of road surface in winter and direct ray of light danger through simulation of completed road and surrounding environment. And presented road design support way through view analysis.

Macro-level Methodology for Estimating Carbon Emissions, Energy Use, and Cost by Road Type and Road Life Cycle (도로 종류와 도로생애주기별 탄소배출량, 에너지소모량 및 비용에 대한 거시적 분석방법)

  • Hu, Hyejung;Baek, Jongdae
    • International Journal of Highway Engineering
    • /
    • v.17 no.2
    • /
    • pp.143-150
    • /
    • 2015
  • PURPOSES : The authors set out to estimate the related carbon emissions, energy use, and costs of the national freeways and highways in Korea. To achieve this goal, a macro-level methodology for estimating those amounts by road type, road structure type, and road life cycle was developed. METHODS : The carbon emissions, energy use, and costs associated with roads vary according to the road type, road structure type, and road life cycle. Therefore, in this study, the road type, road structure type, and road life cycle were classified into two or three categories based on criteria determined by the authors. The unit amounts of carbon emissions and energy use per unit road length by classification were estimated using data gathered from actual road samples. The unit amounts of cost per unit road length by classification were acquired from the standard cost values provided in the 2013 road business manual. The total carbon emissions, energy use, and cost of the national freeways and highways were calculated by multiplying the road length by the corresponding unit amounts. RESULTS: The total carbon emissions, energy use, and costs associated with the national freeways and highways in Korea were estimated by applying the estimated unit amounts and the developed method. CONCLUSIONS: The developed method can be employed in the road planning and design stage when decision makers need to consider the impact of road construction from an environmental and economic point of view.

Practical 2-Arch Road Tunnel Design in Mountainous area (산악지형에서 효율적인 2-Arch 터널의 설계사례)

  • Jeong, Kyeong-Han;Lee, Joo-Gong;Han, Sung-Su;Hwang, Yong-Sub;Kim, Ji-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.601-612
    • /
    • 2005
  • In mountainous area, Two parallel tunnels have been usually recognized as a road tunnel which has benefits in aspects of cost and stability. However, Design and construction of 2-Arch road tunnel are growing recently due to environmental destruction, compensation of land and difficulty of route separation. As studies are mainly undergoing on only guaranteeing stability and developing a waterproofing-drainage system to avoid water leakage through comprehension for characteristics of 2-arch tunnel behaviors, there is a tendency to evaluate quantity of support by empirical method with a tunnel which has a complicated cross-section and lack of construction ability. In this study, therefore, we made a plan of tunnel cross-section which had shown good construction ability and developed the waterproofing-drainage system which is able to solve the water leakage problem fundamentally by analyzing precedented 2-arch tunnels and investigating their sites in and out of nation. We also determined fixed quantity of support by a large-scale model test and numerical analysis. We want to contribute to 2-arch tunnel design hereafter introducing design procedure and method applied here.

  • PDF

A study on the enlargement of 2-lane road tunnel under construction (시공중인 2차로 도로터널의 확장 방안에 대한 연구)

  • Choi, Hae-Jun;Kim, Dae-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.33-50
    • /
    • 2011
  • Recently interest in enlargement of existing tunnel located in downtown or mountain area have been considerably increased along with requirements and discussion on the road-widening. Therefore, it is necessary to study the construction method and stability of tunnel to enlarge the existing tunnel in design. In this study, the design concept on the alignment, excavation method, reinforcement to enlarge the existing tunnel is described on the basis of the enlargement of 2-lane road tunnel under construction. This paper suggests a proper design method for the enlargement of an existing tunnel in useful practice.

Settlement behavior and controlling effectiveness of two types of rigid pile structure embankments in high-speed railways

  • Wang, Changdan;Zhou, Shunhua;Wang, Binglong;Guo, Peijun;Su, Hui
    • Geomechanics and Engineering
    • /
    • v.11 no.6
    • /
    • pp.847-865
    • /
    • 2016
  • In this study, a series of geotechnical centrifugal tests were conducted to investigate the effectiveness of settlement control of two types of rigid pile structure embankments (PRSE) in collapsible loess under high-speed railway embankments. The research results show that ground reinforcement is required to reduce the post-construction settlement and settlement rate of the embankments. The rigid pile structure embankments using rigid piles can substantially reduce the embankment settlement in the construction of embankments on collapsible loess, and the efficiency in settlement reduction is affected by the pile spacing. The pile-raft structure embankments (PRSE) have much stronger ability in terms of the effectiveness of settlement control, while the pile-geogrid structure embankments (PGSE) provides rapid construction as well as economic benefits. Rational range of pile spacing of PRSE and PGSE are suggested based on the requirements of various railways design speeds. Furthermore, the time effectiveness of negative skin friction of piles and the action of pile-cap setting are also investigated. The relevant measures for improving the bearing capacity and two parts of transition zone forms as positive control mean have been suggested.

Accuracy Analysis of Satellite Imagery in Road Construction Site Using UAV (도로 토목 공사 현장에서 UAV를 활용한 위성 영상 지도의 정확도 분석)

  • Shin, Seung-Min;Ban, Chang-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.753-762
    • /
    • 2021
  • Google provides mapping services using satellite imagery, this is widely used for the study. Since about 20 years ago, research and business using drones have been expanding. Pix4D is widely used to create 3D information models using drones. This study compared the distance error by comparing the result of the road construction site with the DSM data of Google Earth and Pix4 D. Through this, we tried to understand the reliability of the result of distance measurement in Google Earth. A DTM result of 3.08 cm/pixel was obtained as a result of matching with 49666 key points for each image. The length and altitude of Pix4D and Google Earth were measured and compared using the obtained PCD. As a result, the average error of the distance based on the data of Pix4D was measured to be 0.68 m, confirming that the error was relatively small. As a result of measuring the altitude of Google Earth and Pix4D and comparing them, it was confirmed that the maximum error was 83.214m, which was measured using satellite images, but the error was quite large and there was inaccuracy. Through this, it was confirmed that there are difficulties in analyzing and acquiring data at road construction sites using Google Earth, and the result was obtained that point cloud data using drones is necessary.