• Title/Summary/Keyword: Road Construction

Search Result 2,064, Processing Time 0.034 seconds

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

  • Naik, M. Gopal;Radhika, V. Shiva Bala
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.26-31
    • /
    • 2015
  • Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.

Comparison between 2D FEM Analysis using Elastic (visco)-plastic model and In-situ Behavior (성토가 주변지반에 미치는 영향에 대한 해석적 검증과 실측치의 비교분석)

  • 황성춘;김승렬
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.02a
    • /
    • pp.79-92
    • /
    • 2000
  • In this paper, comparison of the observed and the predicted ground deformations due to the construction of road embankment with peck drain near the construction site was made. Measurement of the ground deformation at the gasoline stand due to the construction of road embankment was made and it was compared with the predicted deformation results of Finite Element Method analysis made with Elasto-plastic and Elastic visco-plastic models. A well agreement was obtained between the measured and predicted ground deformations.

  • PDF

Impact on Introduction of the Alien Plants by Road Development Projects (도로개발 사업이 외래식물 유입에 미치는 영향)

  • Chu, Yunsoo;Kim, Jung-Kwon;Lee, Hyohyemi
    • Ecology and Resilient Infrastructure
    • /
    • v.4 no.3
    • /
    • pp.156-168
    • /
    • 2017
  • Linear development such as road and railway construction is considered to be an important factor in the dipersion agent of alien species. The purpose of this study is to investigate the effect of road project implementation on the introduction of alien plants. We selected the roadworks that have been completed or completed by more than 70% of the projects in the Han River basin environment agency. The alien plant data were divided into five phases: pre-construction (P0) and construction (P25, P50, P75, P100) according to the annual process rate. As the construction progresses, the naturalization rate, the urbanization index and the tendency of the number of exotic plants increase. Especially, alien plants were introduced rapidly at the beginning of the construction period, and the introduced species continued to appear until the construction was completed. Therefore, it is necessary to minimize the introduction of ailen plants by concentrating management of embankment process and the vegetation restoration process at the beginning of roadworks.

THE OPPORTUNITIES AND CHALLENGES FOR CONTRACTUAL CONSIDERATION OF CONSTRUCTION-RELATED CARBON EMISSIONS FROM CIVIL INFRASTRUCTURE PROJECTS

  • Changbum Ahn;SangHyun Lee;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.653-658
    • /
    • 2011
  • Construction works of civil infrastructure projects generate a considerable amount of carbon emissions by utilizing a set of energy-intensive equipment and causing traffic congestion. However, the voluntary efforts of the contractor to mitigate these emissions are at an early stage. To address this issue, this paper explores the opportunities to take carbon emissions that would be caused from construction works into consideration in contracting methods and procedures. The opportunities for reducing carbon emissions from construction activities themselves are examined under the framework of Performance Contracting for Construction (PCfC), and carbon emissions from traffic congestion are attempted to be incorporated into the Road User Cost (RUC) calculation. This paper also identifies and discusses major challenges that must be confronted when considering the mitigation of these emissions in contracting methods and procedures.

  • PDF

Analysis of Individual Tree Change Using Aerial Photograph in Deforested area Before and After Road Construction (항공영상을 활용한 도로개발 전·후 산림 훼손지 개체목 분석)

  • Choi, Jae-Yong;Kim, Seoung-Yeal;Kim, Whee-Moon;Song, Won-Kyong;Lee, Ji-Young;Choi, Won-Tae;Moon, Guen-Soo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.65-73
    • /
    • 2018
  • Although the road construction in forest is increasing and there is a need for development ecological restoration on deforest area, no consideration has been given to individual trees in there. This study analyzed aerial photographs of deforest area before and after road construction for determining the degree of forest destruction by extracting individual trees. Study area was selected in the sites where are damaged by road construction in GongJu-si, YuSung-gu, and YeongDong-gun. The aerial photograph taken 1979 before construction is panchromatic image of 80cm in GSD (Ground Sample Distance) and other photograph taken 2016 after construction is multi-spectral image of 10cm in GSD. In order to minimize the difference of GSD, we conducted image re-sampling process for setting to same GSD for the two photographs. After that we carried out visual interpretation method for determining to change of individual tree. The result found that for GongJu-si of the number of individual tree was 1,014 in 1979 and 886 in 2016, which decreased by 128 (12.6%) and the average width of those decreased from 5.77m to 5.75m by 0.47%. In case of YoungDong-gun, the number of it was 761 in 1979 and 746 in 2016, which decreased by 2.0% and the average width of it decreased from 8.99mm to 8.90m by 1.1%. Lastly in case of YuSung-gu, the number of it was 1,578 in 1979 and 988 in 2016, which decreased by 37.4% and the average width of it decreased from 7.09m to 6.65m by 6.21%. these result imply that road construction causes destruction of forests. Since there are limitations such as errors due to researcher, it is necessary to construct a quantitative analysis method for the change of the deforest area. It is need to study the method of extracting individual tree in deforest area more accurately using high-resolution image of GSD 10cm or more as well. This study can be used as a basic data for the ecological restoration of the deforest area considering characteristics of individual tree such as height, diameter at breast height, and biomass.

Extraction of Road Structure Elements for Developing IFC(Industry Foundation Classes) Model for Road (도로분야 IFC 확장을 위한 도로시설의 구성요소 도출)

  • Moon, Hyoun-Seok;Choi, Won-Sik;Kang, Leen-Seok;Nah, Hei-Sook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1195-1203
    • /
    • 2014
  • Since IFC (Industry Foundation Classes) 4 is based on the representation of 3D elements for an architecture project, and does not define standardized shapes for civil projects such as roads, bridges, and tunnels etc, it has limitations in securing interoperability for exchanging a shape information model for the civil projects. Besides, since road facilities have a linear reference, which is modeled along the center alignment, it is difficult the designers to create a standardized 3D road model. The aim of this study is to configure structure elements and their attribute for a road in the perspective of 3D design for developing a shape information model for the road. To solve these issues, this study analyzes the design documents, which consist of a road design handbook, guide, specifications and standards, and then extract shape elements and their attributes of road structures. Such shape elements are defined as an entity item and we review a hierarchical structure of a road shape defined by a virtual road model. The detailed elements and their attributes can be utilized as a 3D shape information model for constructing BIM (Building Information Modeling) environment for Infrastructures. Besides, it is expected that the suggested items will be utilized as a base data for extending to IFC for a road subdividing the detailed shapes, types and attributes for road projects.

Development of Cutting Route Recognition Technology of a Double-Blade Road Cutter Using a Vision Sensor (비전센서를 활용한 양날 도로절단기의 절단경로 인식 기술 개발)

  • Myoung Kook Seo;Jin Wook Kown;Hwang Hun Jeong;Jung Ham Ju;Young Jin Kim
    • Journal of Drive and Control
    • /
    • v.20 no.1
    • /
    • pp.8-15
    • /
    • 2023
  • With the recent trend of intelligence and automation of construction work, a double-blade road cutter is being developed that automatically enables cutting along the cutting line marked on the road using a vision system. The road cutter can recognize the cutting line through the camera and correct the driving route in real-time, and it detects the load of the cutting blade in real-time to control the driving speed in case of overload to protect workers and cutting blades. In this study, a vision system mounted on a double-blade road cutter was developed. A cutting route recognition technology was developed to stably recognize cutting lines displayed on non-uniform road surfaces, and performance was verified in similar environments. In addition, a vision sensor protection module was developed to prevent foreign substances (dust, water, etc.) generated during cutting from being attached to the camera.

Evaluation of Onshore Wind Resource Potential According to the Road Proximity (도로인접성에 따른 육상 풍력자원 잠재량 평가)

  • Kim, Hyun-Goo;Hwang, Hyo-Jung;Kang, Yong-Heack;Yun, Chang-Yeol
    • New & Renewable Energy
    • /
    • v.9 no.4
    • /
    • pp.13-18
    • /
    • 2013
  • Wind turbines should generally be installed at a certain distance from a road to ensure passengers' safety. In Korea, there is no clear guidance as the Ministry of Environment first proposed a road setback distance of 400 m in the Onshore Wind Farm Siting Guidelines draft proposed in July 2012, and then modified it to 1.5 times the height of the wind turbine in October of the same year. This study analyzed the dynamic range of onshore wind resource potential according to how the road setback distance is set using the Korea Wind Atlas with 100m spatial resolution made by the Korea Institute of Energy Research, the transportation network of the Ministry of Construction and Transportation, and the forest road network of the Korea Forestry Service. Owing to the geographical characteristics of Korea, where mountainous terrain accounts for 70% of the total territory, the wind resource potential within 1 km from forest roads are estimated to be 14.3 GW, 14% of Korea's total wind resource potential. In addition, the construction distance of new road for transporting wind turbines from the existing road to a wind farm site is estimated as less than 2 km. Given the limited wind resource potential and geographical constraints, an assessment system that can maximize wind resource utilization and ensure road safety at the same time, and which takes into account the regional characteristics instead of applying the fixed road setback distance across-the-road, is required.

Improvement of Emissions from Diesel Engine according to the Korean Standard Test Cycle in the Construction Equipment (건설기계용 엔진의 국내 표준시험모드에 따른 배출가스 특성 및 개선)

  • Joo, Taeheun;Yu, Seunghun;Lee, Chang-Eon
    • Journal of the Korean Society of Combustion
    • /
    • v.19 no.4
    • /
    • pp.42-48
    • /
    • 2014
  • The emission standard of diesel engine on the construction equipment has been rapidly enhanced in advanced countries, because most of air pollutions was caused by construction equipment. So, all of the construction equipments will be tested for emission with standard measurement mode. But, the standard measurement mode of construction equipment is different for non-road and one for the road in korea. This study was conducted to measure emission characteristics of the construction equipment with changed standard measurement mode and to improvement the emissions experimentally.

Application of Markov Chains and Monte Carlo Simulations for Pavement Construction Engineering

  • Nega, Ainalem;Gedafa, Daba
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1043-1050
    • /
    • 2022
  • Markov chains and Monte Carlo Simulation were applied to account for the probabilistic nature of pavement deterioration over time using data collected in the field. The primary purpose of this study was to evaluate pavement network performance of Western Australia (WA) by applying the existing pavement management tools relevant to WA road construction networks. Two approaches were used to analyze the pavement networks: evaluating current pavement performance data to assess WA State Road networks and predicting the future states using past and current pavement data. The Markov chains process and Monte Carlo Simulation methods were used to predicting future conditions. The results indicated that Markov chains and Monte Carlo Simulation prediction models perform well compared to pavement performance data from the last four decades. The results also revealed the impact of design, traffic demand, and climate and construction standards on urban pavement performance. This study recommends an appropriate and effective pavement engineering management system for proper pavement design and analysis, preliminary planning, future pavement maintenance and rehabilitation, service life, and sustainable pavement construction functionality.

  • PDF