• Title/Summary/Keyword: River design

Search Result 793, Processing Time 0.032 seconds

Environmentally Sound and Sustainable Dam Construction in Asia (Hantan River Dam in Korea)

  • Baek, Unil;Kim, Myunsun;Park, Younghwan;Noh, Seungkyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.134-147
    • /
    • 2004
  • Theses days, there are 3 prerequisites for dam building in Korea: First one is how to build the dam safe and stable from the technical points of view. Second one is how to design and construct the dam environmentally sound with the minimum change of the surrounding area of the dam site. Third one is how to activate the local economy of the surrounding area of the dam site in order to make the dam construction sustainable from the social and economical points of view. As far as technical aspects far dam building, there are hardly any problems in dam design and construction in our country. However, there are a little difficulty according to the location of the dam site. In order to fulfill the second option it is believed that a lot of effort should be made to accomplish the second task not only because that fairly large area shall be inundated with water after impounding but also because that ecological environments shall be changed due to change of water environment. Therefore, thoughtful investigation and assessment of the environmental features of the local regions have to be preceded before starting of the dam building. In order to overcome these difficulties Hantan river dam has been declared as an Eco-dam with 3 strategies and 9 activities plan at the design stage after sufficient consideration of the local identities of these region and coupled national plans for surrounding areas. Finally, Eco-tourism with the several coupled network-wise touristic courses, namely PERTH model, has been proposed after thorough analysis of the local identities by the Jahari window to make local economy being activated. Detailed descriptions for 3 strategies and 9 activities plan for declaration of Eco-dam and proposal of Eco-tourism with the network-wise touristic courses will be mentioned in the main content.

  • PDF

Numerical Analysis for Integrity Evaluation of River Bank (하천제방의 건전도 평가를 위한 수치해석적 연구)

  • Jung, Hyuksang;Byun, Yoseph;Chun, Byungsik;Choi, Bonghyuck;Kim, Jinman
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.11
    • /
    • pp.19-26
    • /
    • 2010
  • An influence factors for soundness evaluation of river levee include consisting embankment in case piping, permeability coefficient of ground, height of embankment, the width of crest, material characteristics of embankment and foundation ground, shape of embankment slope, an influence for penetration of rainfall or river water in case slope stability. In this study, it was operated a feasibility investigation of existing design result, stability evaluation for permeability coefficient use and permeability coefficient change of foundation ground to investigate an influence in line with permeability coefficient change for result of river levee penetration analysis. The evaluation results of influence factors, the permeability coefficient was used in design and it was evaluated influence in safety factor of piping. After the evaluation of influence factors, the permeability coefficient used in the design appears with the fact that differs in a design report about same soil.

Model test and numerical simulation on the bearing mechanism of tunnel-type anchorage

  • Li, Yujie;Luo, Rong;Zhang, Qihua;Xiao, Guoqiang;Zhou, Liming;Zhang, Yuting
    • Geomechanics and Engineering
    • /
    • v.12 no.1
    • /
    • pp.139-160
    • /
    • 2017
  • The bearing mechanism of tunnel-type anchorage (TTA) for suspension bridges is studied. Model tests are conducted using different shapes of plug bodies, which are circular column shape and circular truncated cone shape. The results show that the plug body of the latter shape possesses much larger bearing capacity, namely 4.48 times at elastic deformation stage and 4.54 times at failure stage compared to the former shape. Numerical simulation is then conducted to understand the mechanical and structural responses of plug body and surrounding rock mass. The mechanical parameters of the surrounding rock mass are firstly back-analyzed based on the monitoring data. The calculation laws of deformation and equivalent plastic strain show that the numerical simulation results are rational and provide subsequent mechanism analysis with an established basis. Afterwards, the bearing mechanism of TTA is studied. It is concluded that the plug body of circular truncated cone shape is able to take advantage of the material strength of the surrounding rock mass, which greatly enhances its bearing capacity. The ultimate bearing capacity of TTA, therefore, is concluded to be determined by the material strength of surrounding rock mass. Finally, recommendations for TTA design are proposed and discussed.

Pliot Building of the Management System for River Thematic Maps (하천주제도 관리시스템 시범구축)

  • Park, Jin-Hyeog;Lee, Geun-Sang;Koh, Deuk-Koo;Kim, Kye-Hyun;Kim, Seong-Joon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.2
    • /
    • pp.95-102
    • /
    • 2005
  • Currently, the government has been established GIS DB related to river as a part of the river map digitization projects such as RIMGIS and flood map. This study was aimed to demonstrate the generation of thematic maps related to river space and their management system, the one of the major river thematic maps proposed from the precedent study "Establishment of River Thematic Map Project" in an effort to maximize the utilization of river related database, the major product of the project for digitization of river maps. This study includes amending database model for building river thematic maps. Also, metadata were amended and built for efficient management and distribution of the river related data based on the national standard metadata proposed from "Establishing Standard Metadata" sponsored by National Geography Institute in 2003 for more effective management of river thematic maps. In addition, this study analyzed the method for utilizing existing data from RIMGIS and WAMIS as well as digital topographic maps to produce 25 river thematic maps in accordance of defined building procedure. Management system of the river thematic maps for Kyungan watershed has been generated for effective managing river thematic maps based on the design and pilot generation of river thematic maps, and metadata management function has been added into the management system.

  • PDF

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Characteristics of Bed Profile Fluctuation According to Before & After Removal of the Sediment Protection Weir using HEC-6 model (HEC-6모형을 이용한 방사보 철거 전후에 따른 하상변동 특성)

  • Ahn, Seung-Seop;Lee, Soo-Sik;Choi, Yun-Young;Lee, Jeung-Seok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.1 no.3 s.3
    • /
    • pp.93-102
    • /
    • 2001
  • In this study, the characteristics of river bed profile fluctuation are become possible to be used effectively in future estimation of Taehwa river general development plan through analysis and examination according to the effects of sediment protection weir located in the area of the estuary of Taehwa river's main channel using HEC-6 model. The flow conditions needed in analysis of the characteristics of river bed profile fluctuation refer the conditions of flow which secures 95 days in a year, flood flow, and design flood examined in the estimation of Taehwa river maintenance basic plan. First, in analysis result of river bed variation range, there is no significant variation in upstream section from Samho-gyo while there are the more active erosion and sedimentation as the more flow in downstream from Samho-gyo. Next, from the result of the capacity of sediment transfer, it is analyzed that sediment transfer capacity in the area of estuary of Taehwa river has no significant difference in before and after removal of the sediment protection weir when design flood flows while it is estimated that the more flow, the bigger sediment transfer capacity. Therefore, it is thought that the installation of a suitable hydraulic structure at the lowest point of Dong-chun tributary joins from the downstream of Taehwa river can be a good device to reduce the accumulation of sediments at the lowest point of Taehwa river considering the reduction plan of sediment inflow caused by removal of the sediment protection weir.

  • PDF

Estimation of Superelevation in Mountainous River Bends (산지하천 만곡부의 편수위 산정)

  • Park, Sang Doeg;Lee, Seung Kyu;Shin, Seung Sook;Cho, Jaewoong
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.12
    • /
    • pp.1165-1176
    • /
    • 2014
  • In a river bend the water surface is inclined by the centrifugal force toward the transverse section. If channel slope and flow rate increase, the gradient is rising generally. There are lots of the flood damage at the bends of mountain river because the flood water levels have exceeded frequently the levee levels which are added a free board to the design flood water level. Therefore the superelevation should be considered in designing the mountainous river bend. In present study it was proposed to estimate the superelevation at the bend of mountain river and the superelevation coefficient defined from multiplying the sub-factors. The values of the influence factors for the superelevation coefficient were suggested from analyzing the superelevation measured at the bends in Yangyangnamdae river and the hydraulic experiments in gravel-bed channel with a $90^{\circ}$ bend. The applicability of these methods to estimate the superelevation at the bends in mountain river was verified by the superelevation measured at the bend in Naerin river.

Optimal Decision of River Width Work Using Analytic Hierarchy Process-Case Study of IP-Chon (AHP기법을 이용한 최적 계획하폭 선정-입천에의 적용 사례연구)

  • Lee, Jae-Mun;Lee, Sang-Il
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.12
    • /
    • pp.931-941
    • /
    • 2007
  • Traditionally, the decision of river width has aimed majorly at flood control and good river conveyance. And the river width has been decided by practitioner#s subjective and empirical opinion. Recently, however, there is a need for more objective and thus quantitative decision method for decision of river width considering not only economical aspect but also social or environmental aspect. This study adopts the analytic hierarchy process (AHP) to improve the objectiveness in the decision of river width. Criteria and a standardized process are presented for field application. Using the proposed method, one can prioritize various river width and make the optimal decision. We believe that the method can serve as a useful tool for river engineers in practice.

Wetland Utilization of the Cut River and Economic Analysis for Flood Control (폐천의 습지 이용과 치수경제성 분석)

  • Kim, Hung Soo;Lee, Sang Sik;Jeong, Sang Man;Park, Soo Yong
    • Journal of Wetlands Research
    • /
    • v.4 no.1
    • /
    • pp.43-50
    • /
    • 2002
  • The channel improvement plan has contributed to the flood damage reduction studies and the plan has mainly performed by the levee construction which creates the cut river. The cut river has mainly used as the agricultural and housing purposes. Recently, however, it is considered as a natural wetland for the purposes of a flood control and preservation of nature. So, this study compares the economical benefits according to the purposes of the cut river utilizations such as an agricultural, levee construction for flood damage reduction, and wetland. The study area is the downstream part of Kok-Neung stream which is a main tributary of Han river. The agricultural and levee construction benefits are estimated based on the 'Agricultural and Forestry Statistical Year' (2000) and the 'Standard for River Design' (2001). The benefit or value for the wetland utilization of the cut river is estimated by the enquete using questionnaire. As a results, for the case of which the cut river is used as an agricultural land, the present net benefit is estimated as 195.81 million won, for the levee construction, as 20853.00 million won and for the wetland, as 24692.89 million won. Therefore, the wetland is the best choice for the cut river utilization.

  • PDF

A Study on Flood Risk Analysis for A Small Stream in Urban Residential Area (도시 주거지역 내 소하천의 홍수 안정성에 관한 연구)

  • Kwak, Jae-Won;Ahn, Kyoung-Soo;Kyoung, Min-Soo;Kim, Hung-Soo
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.195-198
    • /
    • 2008
  • In this study we analyzed flood runoff and flood characteristics of an small urban river basin which is in an apartment complex in Yewol-Dong, Buchun-Si, Gyunggi-Do. A little discharge normally flows in the river, however this small river has a relatively high potential of flood damage risk in the flood season due to the high flood level and velocity. Therefore we used the GIS data, cross section data in the river, HEC-RAS model, etc. for investigating safety of a river against flood runoff and also we investigated the stability of hydraulic structures and ability of flood prevention in the river. As the result of investigation, we found that the river had the risk of flood damage occurrence due to the hydraulic structures constructed for various purposes in the river. So we should analyze backwater effect by the structures and consider the risk factors can be occurred by the flood runoff and velocity for more safe design of a small river basin in the residential area such as an apartment complex in the urban area.

  • PDF