• Title/Summary/Keyword: River Plan

Search Result 529, Processing Time 0.024 seconds

Restoration Plan of Changwon and Nam Streams Based on the Results of Diagnostic Assessment (생태적 진단결과에 기초한 창원천과 남천의 복원계획)

  • An, Ji Hong;Lim, Chi Hong;Jung, Song Hie;Kim, A Reum;Woo, Dong Min;Lee, Chang Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.5
    • /
    • pp.511-524
    • /
    • 2017
  • This study was carried out for the purpose of creating a restoration plan to improve the ecological quality of the Changwon and Nam streams. Based upon the results of comprehensive diagnostic assessment, restoration priority was given to the upstream reach, where conservation status is relatively superior. Restoration level was usually determined to practice active restoration as conservation, and the states of both Changwon and Nam streams were not so good. Restoration plans, by reach, were classified into "upstream", "midstream", and "downstream" were suggested in both terms of horizontal section frame and vegetation-based on the result of diagnostic assessment and the reference information. "Upstream", "mid-stream" and the "downstream" of Changwon and Nam streams were classified into "small-gravel- mountainous", "small-sand-plain", and "small-clay-plain streams" respectively (based on scale, and substrate and slope of river bed). The spatial arrangement of vegetation was laid out in diagram form by reflecting micro-topography and the water level of the horizontal section of river. Information regarding species composition was recommended as dominant species, which appear frequently in three vegetation zones composed of herbaceous plants, shrubs and trees and sub-tree- dominated zones divided by reflecting disturbance regime, depending on position on the horizontal section of river. Moreover, there have been prepared not only plans to improve the terrestrial ecosystems around the streams but also plans to create ecological networks, which can serve to improve the ecologic quality of the whole regional environment by serving to connect streams and terrestrial ecosystems, a process probably necessary and definitely recommended to realize true (genuine) restoration. Plans for ecological parks and networks were prepared by mimicking the species composition of Alnus japanica community, Zelkova serrata community, Carpinus laxiflora community, Quercus aliena community, and Q. serrata community.

A Stochastic Dynamic Programming Model to Derive Monthly Operating Policy of a Multi-Reservoir System (댐 군 월별 운영 정책의 도출을 위한 추계적 동적 계획 모형)

  • Lim, Dong-Gyu;Kim, Jae-Hee;Kim, Sheung-Kown
    • Korean Management Science Review
    • /
    • v.29 no.1
    • /
    • pp.1-14
    • /
    • 2012
  • The goal of the multi-reservoir operation planning is to provide an optimal release plan that maximize the reservoir storage and hydropower generation while minimizing the spillages. However, the reservoir operation is difficult due to the uncertainty associated with inflows. In order to consider the uncertain inflows in the reservoir operating problem, we present a Stochastic Dynamic Programming (SDP) model based on the markov decision process (MDP). The objective of the model is to maximize the expected value of the system performance that is the weighted sum of all expected objective values. With the SDP model, multi-reservoir operating rule can be derived, and it also generates the steady state probabilities of reservoir storage and inflow as output. We applied the model to the Geum-river basin in Korea and could generate a multi-reservoir monthly operating plan that can consider the uncertainty of inflow.

A Study on the Improvement Scheme of the Total Water Pollution Load Management Plan (수질오염총량관리 계획수립의 개선방안에 관한 연구)

  • Kim, Young-Il;Yi, Sang-Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.977-981
    • /
    • 2006
  • In order to improve water quality in drinking water sources, Ministry of Environment (MOE) was implemented total water pollution load management (TWPLM) in all the major river basins. From the experience of the application of TWPLM, we could find some problems relating the target watershed, standard operating procedure (SOP) of establishment and implementation plan, water quality and flow rate, design flow, water quality model, margin of safety (MOS), and estimation of wasteload were found. The authors were reviewed ongoing TWPLM and presented the improvement schemes for a successful TWPLM. For the application of these suggestions, further detailed studies should be done to implement TWPLM in the future.

Study of Plans for a Residential Area for Displaced Villagers Considering Sustainability: A Case of Gyodong-village, Pocheon-si, Gyeonggi-do in Korea (지속가능성을 고려한 농촌마을 이주단지 조성계획 연구 -경기도 포천시 교동마을을 대상으로-)

  • Joo, Myoung-Gyu;Cho, Joong-Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.18 no.3
    • /
    • pp.175-186
    • /
    • 2012
  • This is a study of a residential area for displaced villagers planned for residents of Gyodo Village who must evacuate their hometown because of flooding due to the Hantan River Dam Project. The study aims to construct a plan for a new residential area for the villagers focusing on reflecting the existing characteristics of their former village and on ensuring sustainability for the new village. Departing from previous practice of focusing on merely physical aspects when planning, the current study is significant in that it presents a new planning process and method for a sustainability-focused plan. While the study has many limitations such as objectivity in the process of deriving the sustainability indicators and the appropriateness of the indicator questions, it is hoped that future studies on sustainability will serve to make up for these limitations and problems.

A Study on Practicalization Plan of Concrete Using Crushed Sand (부순모래의 실용화 방안에 관한 연구)

  • Lee, Y. H.
    • Journal of Korean Port Research
    • /
    • v.9 no.1
    • /
    • pp.65-72
    • /
    • 1995
  • This study is being done for the purpose to achieve a stable demand and supply of materials for long term. The author investigated condition of suitable mixer design method for concrete, an individual value and a character of dynamics as a supplement material by drying up the natural aggregate, and a possible practicalization plan to reduce defects to the minimum. As a result of this study, it can be acquired a good quality of concrete by the use of the natural sand (Nak Dong river sand) and the crushed sand with suitable mixing ratio. The fineness modulus (F.M) of mixing aggregate is $2.7\pm1$ at this time and this is good for workbility and plasticity of concrete.

  • PDF

Analysis of Nonpoint source Reduction at Andong Area Considering Changes in CN (CN의 변화에 따른 안동시 물순환 선도도시 조성계획의 비점오염부하 저감효과 분석)

  • Kwon, Heongak;Jung, Kangyoung;Kim, Shin;Shin, Sukho;Ahn, Jungmin;Kim, Gyeonghoon
    • Journal of Wetlands Research
    • /
    • v.18 no.4
    • /
    • pp.342-349
    • /
    • 2016
  • Andong belongs to the Nakdong River Basin, Nakdong River is flowing through the city, including Andong dam and Imha dam. The runoff due to provincial transfer and impervious area has been increasing by urbanization increases and nonpoint source loads. In this study, we evaluate the runoff and nonpoint pollution loads in accordance with the development targeted at selected urban water cycle leading to Andong city. Andong city leading to the water cycle plan to evaluate the directly runoff and BOD, T-N and T-P nonpoint pollutant loads using the CN into account the temporal and spatial changes. Evaluation, direct runoff per year is 10.41 % if the green roof and a water permeable pavement replacement, water cycle parks and streets compositions, City impermeable layer improvements to be business including four kinds of scenario is applied to both the development and the BOD non-point pollutant loads 20.56%, T-N 9.55% and T-P pollution and nonpoint loads was investigated to be reduced 14.29%. Four kinds of low lapse rate of the development scenario of the highest thing urban impervious surface was investigated by improving business development prior year annual direct runoff is 6.25 %, BOD nonpoint pollution loads are 11.84%, T-N nonpoint pollution loads are 4.46 % and T-P was investigated by reducing pollutant loads to be 10.20%.

Holistic Hierarchical Approach to Integrated Water Resources Management in the Tumen International River (두만강 국제하천 통합수자원 관리를 위한 포괄적·단계별 접근방안)

  • Kang, Boo-Sik;Lee, Gwang-Man
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.4 s.153
    • /
    • pp.323-332
    • /
    • 2005
  • The Tumen River basin is relatively small(${\approx}33,000km^2$), it has many potential conflicts between the riparian countries. Especially, until recently, it could have not drawn the socio-potitical attention from its central governments because of the geopolitical unique characteristics as edges of mainlands. since 1990's the various plans have been suggested for resolving the problems in this area as an international attention from, e.g UNDP, began to be given. However, the international cooperative structure has not been established in systematic way which has paramount importance. In the research, based on the problems identified in the previous paper, the necessities for independent unit, so called 'Tumen River Watershed Management Commission' were suggested for holistic and hierarchical resolution in accordance with integrated management and international river based on 'limited territory sovereignty' which is a general principle in international river management. For this purposes, hierarchical problem solving approach which consists of 3 phases were developed. They include major objectives and behavioral guidelines for achieving equity between riparian countries based on international cooperation and integrated watershed management as fundamental concept. In conclusion, rational plan for future water use, management and primary framework of Tumen River for international cooperation were composed and strategic approach for the North-East Asian community foundation was suggested.

Prediction of Water-Quality Enhancement Effects of Gates Operation in the West-Nakdong River Using RMA2/RMA4 Models (RMA2/RMA4 모형을 이용한 서낙동간 수문연계운영의 수질개선 효과 예측)

  • Lee, Keum-Chan;Yoon, Young-Sam;Lee, Nam-Joo
    • Journal of Environmental Science International
    • /
    • v.18 no.9
    • /
    • pp.971-981
    • /
    • 2009
  • An objective of this study is as follows: 1) performing sensitivity analysis and parameter estimation of RMA2 and RMA4 models for the West-Nakdong River, 2) drawing up alternatives of gates-operation for water-quality enhancement, and 3) quantitative evaluation of methodology of 'flow-restoration by gates-operation' among 'Comprehensive Plan Improving Water-Quality in the West-Nakdong River(WNR)' with the target water-quality(BOD at Nakbon-N point: below 4.3 mg/L). The parameters for the RMA2 (depth-averaged two-dimensional flow model) and RMA4 (depth-averaged two-dimensional water-quality model) were determined by sensitivity analysis. Result of parameter estimation for RMA2 and RMA4 models is $1,000\;Pa{\cdot}s$ of the eddy viscosity, 20 of the Peclet number, 0.025 of the Manning coefficient, and $1.0\;m^2/s$ of the diffusion coefficient. We have evaluated the effects of water-quality enhancement of the selected alternatives by numerical simulation technique with the models under the steady-state flow condition and the time-variant transport condition. Because of no-resuspension from river bottom and considering BOD as conservative matter, these simulation results slightly differ from real phenomena. In the case of $50\;m^3/s$ of Daejeo-gate inflow, two-dimensional flow pn results result represents that small velocity occurs in the Pyungkang Stream and no flow in the Maekdo River. In the WNR, there occurs the most rapid flow near timhae-bridge. In the WNR, changes of water-quality for the four selected simulation cases(6, 10, 30, $50\;m^3/s$ of the Daejeo-gate inflow) were predicted. Since the Daejeo-Gate and the Noksan-Gate can be opened up to 7 days, it would be found that sustainable inflow of $30\;m^3/s$ at the Daejeo-gate makes BOD in the WNR to be under the target of water-quality.

Application of Slope-area Discharge Estimation Method using Continuously Observed Water Level Data in a Gravel Bed River -Case Study of the Dal Cheon River- (자갈하천에서 연속적인 수위 자료를 이용한 경사면적법 유량 산정 -달천 사례연구-)

  • Lee, Chan-Joo;Kim, Ji-Sung;Kim, Chi-Young;Kim, Dong-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.5
    • /
    • pp.503-515
    • /
    • 2008
  • In this study we calculate discharge by slope-area method using continuously observed water level data and analyse the results. This study is performed in the Dalcheon river reach of 960 m length including riffles and a pool, which is located downstream of the Goesan Dam. Three values of roughness coefficient are applied to discharge calculation, which are established using bed material size analysis. Another roughness coefficient value obtained from the river improvement plan is also used. Calculated discharges by slope-area method are compared with dam discharges. Relative difference from dam discharges appears to be largely affected by roughness values and a value of 0.042 or more seems most suitable for the entire study reach. Smaller roughness value is suitable to the reach which has gentler water surface slope than mean channel slope of the entire study reach, while a larger value to steeper reach. In case roughness value is set considering overall slope of the channel, it is desirable to select the entire calculation reach including both gentler and steeper sub-reaches. Since relative difference becomes nearly constant at over 500 cms, in case that verification of applied roughness is conducted with other directly measured discharge, accuracy of measurement by slope-area method for larger discharge may be improved.