• Title/Summary/Keyword: River Plan

Search Result 529, Processing Time 0.026 seconds

Incorporating Social & Economic Factors for the Pasture Project in Kum River (금강 참게목장화 사업의 사회-경제 통합모델링)

  • Jeon, Dae-Uk
    • Korean System Dynamics Review
    • /
    • v.12 no.1
    • /
    • pp.59-74
    • /
    • 2011
  • This article deals with an economic evalutation of the 'Pasture Project of Kum River', which is the farming plan of mitten crabs in a stream of it. An augmented model of social capital is based on the past ecological-economic system dynamics model and elaborated further with suggestions of social capital literature. During the modeling process a chain diagram of causal relations and its relevant mathematical equations are presented for simulating the project performance, and the simulation results are provided to contrast the dynamic behaviors of the former ecological-economic model with ones of the new model incorporating social capital. The results indicate that an increase in the economic benefit of the project could happen in case of considering the process of social capital accumulation around the case area, which can be regarded as a remarkable trial to approve the common confidence in the role of social capital to enhance an economic achievement.

  • PDF

Basic Investigation on the Water Resource Development of the Principal Riever Basins for All Weather Farming (전천후농업용수원 개발을 위한 중요하천 수계별 기본조사의 실시)

  • 임은진
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.9 no.2
    • /
    • pp.1291-1295
    • /
    • 1967
  • This paper is a brief description on the task of the basic investigation of the water resource development of the principal river basins in this country for all- weather farming. In order to show how the people in the nation can best be benefited by further development of the water resources of the basins, this paper includes a description of the in individual basin's resource, its needs and problems, and its present and future development of the water resources within the natural drainage basin of the rivers are listed and their over-all results are summarised in the investigation report and separately filled. It is hoped that the government should continue and expand its detailed investigations of potential projects within the each principal river basin to obtain adequate information by which the Union of Land improvement Association can formulate a comprehensive plan for use of all the water resources of the basin's and select and recommend projects for successive stages of development.

  • PDF

A Study on Development of Long-Term Runoff Model for Water Resources Planning and Management (수자원의 이용계획을 위한 장기유출모형의 개발에 관한 연구)

  • Cho, Hyeon-Kyeong
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.16 no.3
    • /
    • pp.61-68
    • /
    • 2013
  • Long-term runoff model can be used to establish the effective plan of water reources allocation and the determination of the storage capacity of reservoir. So this study aims at the development of monthly runoff model using artificial neural network technique. For this, it was selected multi-layer neural network(MLN) and radial basis function neural network(RFN) model. In this study, it was applied model to analysis monthly runoff process at the Wi stream basin in Nakdong river which is representative experimental river basin of IHP. For this, multi-layer neural network model tried to construct input 3, hidden 7, and output 1 for each number of layer. As the result of analysis of monthly runoff process using models connected with artificial neural network technique, it showed that these models were effective in the simulation of monthly runoff.

A Study on Estimation of Levee Safety Map for Determining the Priority of River Maintenance (하천 유지관리 우선순위 결정을 위한 제방안전도맵 산정방법 연구)

  • Yoon, Kwang Seok;Kim, Sooyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.17-25
    • /
    • 2017
  • Owing to recent climate change, the scale of rainfall tends to increase gradually and the risk of flooding has increased. Therefore, the importance of improving the levee management and disaster response is increasing. Levee management in Korea is carried out at the level of damage recovery after the occurrence of damage. Therefore, it is necessary to develop a technology for predicting and managing the levee safety with proactive river management. In this study, a method to estimate the safety against erosion and overflow was suggested. A map of levee safety that can be used as basic data is presented by displaying the levee safety on the map. The levee erosion safety was calculated as the ratio of the internal and external force for each shore type. The levee overflow safety was calculated as the ratio of the maximum conveyance and design flood. The maximum conveyance was a discharge when the level of the river was equal to the level of the levee crown. The levee safety was classified into 5 grades: very safe, safe, normal, dangerous, and very dangerous. As a research area from downstream of Nam River Dam to Nakdong River Junction, the levee safety against erosion and overflow was estimated for all levees and all cross-sections of the river. The levee safety was displayed on a map using GIS. Through the levee safety map as a result of this study, the levee safety can be observed intuitively. Using the levee safety map, a maintenance plan for a river can be easy to build. This levee safety map can be used to help determine the priority of investment for efficient budget used.

A Study on the Application of River Surveying by Airborne LiDAR (항공라이다의 하천측량 적용 방안 연구)

  • Choi, Byoung Gil;Na, Young Woo;Choo, Ki Hwan;Lee, Jung Il
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.2
    • /
    • pp.25-32
    • /
    • 2014
  • The river plan executes the role for prevention of disaster and protection of environment, and requires the surveying results with high accuracies for managing river, dam, reservoir which will be the major infrastructures. The purpose of this study is for comparing and analyzing the results of river surveying which is used widely for disaster management and construction industry support. The results are gathered by using LiDAR which is being used in Korea recently and by using Total station. Study area is chosen at upper area of Bukhan River which is located at Gangwon-do. Total 2 cross-sections of the two methods are extracted from the study area. The standard deviation of land part is about 0.017m which shows little difference between two methods, but the Airborne LiDAR results cannot survey the heights of the points accurately at the singular points with vertical structure and water body part. To overcome the problems through this study, there should be ways to survey the bottom river through transmission of water level within the same margin scope as land part and to survey detailed facilities used by laser exactly through continuous research and experiment. When implementation stage comes, this study expect that this document will be utilized variously for making decision in the area of planning and drawing of business and engineering not just for river regarding the major area or the area that people cannot access.

Automatic Extraction of River Levee Slope Using MMS Point Cloud Data (MMS 포인트 클라우드를 활용한 하천제방 경사도 자동 추출에 관한 연구)

  • Kim, Cheolhwan;Lee, Jisang;Choi, Wonjun;Kim, Wondae;Sohn, Hong-Gyoo
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.5_3
    • /
    • pp.1425-1434
    • /
    • 2021
  • Continuous and periodic data acquisition must be preceded to maintain and manage the river facilities effectively. Adapting the existing general facilities methods, which include river surveying methods such as terrestrial laser scanners, total stations, and Global Navigation Satellite System (GNSS), has limitation in terms of its costs, manpower, and times to acquire spatial information since the river facilities are distributed across the wide and long area. On the other hand, the Mobile Mapping System (MMS) has comparative advantage in acquiring the data of river facilities since it constructs three-dimensional spatial information while moving. By using the MMS, 184,646,009 points could be attained for Anyang stream with a length of 4 kilometers only in 20 minutes. Levee points were divided at intervals of 10 meters so that about 378 levee cross sections were generated. In addition, the waterside maximum and average slope could be automatically calculated by separating slope plane form levee point cloud, and the accuracy of RMSE was confirmed by comparing with manually calculated slope. The reference slope was calculated manually by plotting point cloud of levee slope plane and selecting two points that use location information when calculating the slope. Also, as a result of comparing the water side slope with slope standard in basic river plan for Anyang stream, it is confirmed that inspecting the river facilities with the MMS point cloud is highly recommended than the existing river survey.

A Study on the Variation of Water Quality and the Evaluation of Target Water Quality Using LDC in Major Tributaries of Nakdong River Basin (낙동강수계 주요 지류의 수질특성변화 및 LDC를 이용한 목표수질 평가에 관한 연구)

  • Lee, Sangsoo;Kang, Junmo;Park, Hyerim;Kang, Jeonghun;Kim, Shin;Kim, Jin-pil;Kim, Gyeonghoon
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.6
    • /
    • pp.521-534
    • /
    • 2020
  • In this study, the variation of water quality was analyzed for six sites in major tributaries of the Nakdong River Basin. Standard-FDC (Flow Duration Curve) was developed using PM (Percentile Method), one of the statistical FDC estimation methods. The LDC (Load Duration Curve) was obtained using the developed FDC. The current method and the LDC evaluation method were compared and analyzed to evaluate the achievement of TWQ (Target Water Quality). Regarding the monthly flow rate variation, the five sites showed the distribution of the lowest flow rate between May and June, indicating a high probability of dry weathering of the streams. The variation of water quality confirmed the vulnerable timing of flow rate in each site, and it is therefore deemed necessary to plan to reduce T-P and TOC. A comparison and evaluation of TWQ showed that there was a difference between the TWQ values achieved by the two techniques. In addition, the margin ratio to the 50% excess ratio can be found in the LDC evaluation. The results of the LDC evaluation by section and by month showed whether or not the water quality was exceeded by flow conditions, along with the vulnerable sections and timing. Accordingly, it is judged that this method can be used for water quality management in TMDLs (Total Maximum Daily Loads).

Measures to improve the DEM using SAR images in the river corridor (합성개구레이더 영상을 이용한 하천내 DEM 개선 방안)

  • Kim, Joo-Hun;Noh, Hui-Seong
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.11
    • /
    • pp.913-922
    • /
    • 2022
  • The purpose of this research is to propose the measurement of improving DEM by using the water surface range of SAR image analysis for river corridors and to suggest the construction of satellite-based 3D river spatial information of inaccessible regions such as North Korea. For this research, it has been progressed from the accessible area, watershed of Namgang river, the branch of Nakdonggang river. The satellite image was collected from SAR satellite image data for a year in 2021 which was provided by ESA from Sentinel-1A/B data and extracted from the seasonal water surface area. Ground gauge water level was collected from hourly intervals data by WAMIS. The DEM was improved by analysis of the river altitude of water surface area change by the combination of the ground water level of minimum to maximum water surface area data extracted from SAR image analysis. After the improvement of DEM, the altitude of the river varied that it is defined to comprise more natural form of river DEM than the existing DEM. The correction validation of improvement DEM was necessary in field survey elevation data; however, the correction validation was not progressed due to the absence of the data. Although, the purpose of this research is to provide the improvement of DEM by using the analyzed water surface by existing DEM data and SAR image analysis. After the progression of additional correction validation research, we would plan to examine the application in other places and to progress the additional methodological research to apply in inaccessible and unmeasured area including the North Korea.

Building technical and institutional capacities towards new river maintenance (새로운 하천 유지관리를 위한 기술적·제도적 역량 강화 방안)

  • Lee, Sangeun;Park, Jin-Won;Rhee, Dong Sop;Lee, Du Han;Kim, Dong Hyun;Lee, Seung Oh
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.11
    • /
    • pp.849-862
    • /
    • 2021
  • Laws, administrative rules, and task manuals have been revised to build a modern river maintenance system in Korea for the last decade. And various researches and technology developments have been carried out to resolve related issues. However, the recent enactment of the new Act and the catastrophe of flood damage in 2020 have accelerated more emphasis on the reorganization and reinforcement of the river maintenance system in terms of political and social aspects. In this study, we suggested promising directions for strengthening the technical and institutional competencies of river maintenance with respect to policy, R&D, planning, and technology. The open discussion was held with the participation of industry, academia, research institutes, and government officials, and all participants conducted the related survey to collect their opinions effectively. These results are expected to be used as a reference to secure the justification for integration of government organizations, planning of R&D, the introduction of new river maintenance, and related technology development when reestablishing and reinforcing the river management system in the future.

Analysis of the Effectiveness of Nature-based Solutions for River Flood Level Reduction (하천 홍수위 저감을 위한 자연기반해법의 적용효과 분석)

  • Hoyong Lee;Minseok Kim;Junhyeong Lee;Taewoo Lee;Hung Soo Kim;Soojun Kim
    • Journal of Wetlands Research
    • /
    • v.25 no.4
    • /
    • pp.379-385
    • /
    • 2023
  • EDue to climate change and urbanization, the localized heavy rainfall frequently exceeded a design storm rainfall and flood damage has occurred in South Korea. The concept of addressing sustainable river management and environmental and social issues through Nature-based Solutions (NbS) is gaining attention as it seeks to resolve these issues through ecosystem services. Therefore, in this study, the flood reduction effect by river management using NbS was quantitatively analyzed for the Hwang River, which is directly downstream of Hapcheon Dam, South Korea. Floodplain excavation and dyke relocation, which are methods of the NbS, were applied to the flood risk area of the Hwang River. As a result of analyzing the flood level of the river through the unsteady flow analysis of HEC-RAS, we obtained flood level reduction by 8 cm at the confluence of the Nakdong River. The results of this study can be expected to be sufficiently utilized as a basis for use as a management plan through NbS rather than the river management with grey infrastructure.