International conference on construction engineering and project management
/
2009.05a
/
pp.1201-1208
/
2009
A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.
Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.3D
/
pp.371-381
/
2008
The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.
Journal of the Computational Structural Engineering Institute of Korea
/
v.36
no.3
/
pp.147-154
/
2023
In the case of river facilities, the management of this information differs depending on national and regional rivers, therefore, there is no integrated management in place. There is concern about the loss of facility information owing to the insufficient accumulation of information during their design and construction stages. Additionally, as a result, the utilization level of facility information during the maintenance and operation stages is insufficient. To ensure effective maintenance and operation of river facilities, it is necessary to secure data consistency and increase efficiency by organizing facility information according to a standardized classification system. This study proposes a strategy for implementing the BIM standard classification system in the river sector, considering facility characteristics. The goal is to introduce a BIM information model for 3D-based river facilities, and enable efficient maintenance and operation conversion.
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.119-123
/
2010
Causes of the levee collapse are directly or indirectly associated with geotechnical engineering as well as hydraulics. In this paper, literature survey and analysis were conducted to present the alternatives in geotechnical engineering issues for rational levee design. The alternatives include the reasonable river-bed soil utilization and precautions of numerical analysis and slope stability analysis, disruption type and improvement method of drainage facility.
This study was performed to evaluate the environmental qualities of the revetment construction methods and the river-facility materials using Life-Cycle-Assessment(LCA) for the nature-friendly design of close-to-nature river, The investigation results on the environmental qualities of energy and materials used to the close-to-nature river plan showed that the environmental impacts per unit weight increased in the order of gasoline > diesel > cement > wood. The environmental impacts per unit area of revetment construction method exhibited that the environmental loadings increased in the order of gabion > revetment > cribwork. In addition, it was observed that the environmental impact was reduced by improving the materials of zinc-galvanized wire. The model basin investigated in this study was the $0.3km^2$ area of river improvement works in Kyung stream, which is a tributary to the Seomjin river and the second regional stream. The research was conducted based on the 30years by life expectancy of artificial facilities. For the comparisons of revetment techniques with respect to the environmental qualities, the method resulted in the highest environmental loadings. The method using ready-mixed concrete ranked second in the environmental loadings of revetment techniques. The present results of this study are expected to play a beneficial role in the nature-friendly design of close-to-nature river by quantitatively identifying the environmental quality of total procedures (i.e., combination of techniques, selection of river-facility materials, maintenance of river-facility) applied to close-to-nature river plan.
Kim, Sung-Joon;Jin, Ming-Ji;Jeon, Yong-Tae;Shin, Seon-Mi;Choe, Yong-Seung;Won, Chan-Hee
Journal of Environmental Impact Assessment
/
v.21
no.1
/
pp.93-104
/
2012
In this research LCA methodology was adapted and analyzed in quantifying estimation of estuarine environment. The analysed objects of estuarine environment were construction methods, facility, and input material into water, and estuarine ecosystem. In this research the function of LCA of estuarine environment was river with the view of controling water, utilizing water, and hydrophilic function. According to the result of research, environmental damage indicator of facility was decreased 346 Pt from 453 Pt at pre-maintenance to 107 pt at post-maintenance. Among raw and subsidiary materials, remicon, stone-netting bag, and pebbles were showing heavy environmental load in the order. Evironmental impact of input material into water system was analyzed from 1,827 Pt environmental load before construction to 1,080 Pt of post-maintenance, and damage indicator was improved at 747 Pt. Water quality was improved from 1,827 Pt (before construction) to 1,080 Pt(after construction), and ecosystem was improved after maintenance. Environmental indicator in ecosystem was analyzed 427 Pt(before construction) to 348 Pt(after construction), and damage indicator of Sumnjingang riverine system was improved as much as 79 Pt. In the conclusion, estuarine environmental monitoring through LCA in the area of facility, input material into water and ecosystem showed that close-to-nature stream was 1,172 Pt better than artificial stream in environmental aspects.
Kim, Tae-Kyoung;Rhee, Kyoung-Hoon;Sun, Byoung-Jin;Choi, Cheong-Ho
Journal of Environmental Impact Assessment
/
v.16
no.3
/
pp.187-194
/
2007
It started road constructions around river in 1990s. These maintenances concentrate on city river. Because river lives no living things and men don't come near there. But in spite of these river environment go to rack, river maintenances still keep on using preexistence method since 1990s. Only a part of city river environment maintenances consider environmental ability of passive river, river maintenance of a purpose of flood control still don't consider in the concrete. Because propulsion device that consider environment ability of passive river and possible application techniques don't complete. In accordance, A natural river maintenance needs absolutly a series of river projects. Because a natural river maintenance prevents a damage of environment ability. This study is to assume the flood really happened and to carry out the flood damage simulation needed in overflow simulation about the inundated zone. Also, This study examine unstable part about the hydraulic characteristic as velocities, stream power, shear, hydraulic depth, flow area in basin. And this study applied the HEC-RAS(river analysis system) model to predict flood overflow in youngsan river basin. Project flood is used the return period 100 year and inputed data that was calculated in intensity figures of illumination.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.11a
/
pp.104-105
/
2018
The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.12
/
pp.140-149
/
2017
Recently, it has become necessary to consider climate change when managing multi-purpose river functions. However, in terms of domestic rivers, the management of national and local rivers is separated and the river information cannot be integratedly handled. Especially, it is not sufficient to collect and update information by recycling reports for design and construction. In addition, the basic information of the rivers is dependent on the GIS-based RIMGIS system, but the reliability of the information is deteriorating due to the construction of spatial information using the river basement planning results. The purpose of this study is to investigate the current status of the information system with regard to the maintenance and operation of the river facilities. Through the verification of actual cases, the optimal solution was suggested from the point of view of practical information. As a result, we constructed an information system for the reliable maintenance of river facilities and examined the integrated information management plan. The results of this study can be used to improve the existing information and technical and institutional procedures for the integrated maintenance and operation of river facilities. It will be helpful to introduce the BIM as well as solve to the information gap with other fields through the establishment of an information framework to improve the information construction of river areas.
The Chosun Dynasty established and implemented measures to prevent Japanese invasion into the southern coast. To this end, the number of naval vessels and the number of ships were increased, and a shipyard(船所) was constructed to protect the safety of the vessels. The shipyard is a port facility where military vessels are anchored and repaired, as well as public facilities that are needed for military training on public and land, as well as facilities for storing supplies and equipment needed for ships on land and defense at the port entrance. Despite being such an important facility for national defense, Shipyard has not been noticed. Studies have shown that the position of shipyard is divided into the riverside type and the riverbank type, which is due to the topographical features of Korea. The repair cycle of naval vessels, the carrying out of Yeonhun(prevent the water from decaying the part of the ship, a raw tree was burned to smoke) and the place of sea training also affected the construction of the Gul River(掘江). The space structure of shipyard is divided into port entry facilities for monitoring and controlling at the entrance to the harbor, border facilities for folding and repairing military vessels, and land facilities for holding land exercises and administrative work of military vessels and military equipment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.