• Title/Summary/Keyword: Risk management system

Search Result 2,411, Processing Time 0.034 seconds

Improvement on Access Control of Hazard Zone in a Steel Manufacturing Industry (철강 제조업에서의 유해.위험구역 출입 관리 방안)

  • Seo, Seong-Hwa;Kim, Min;Weon, Jong-Il;Woo, Heung-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.3
    • /
    • pp.63-68
    • /
    • 2011
  • Access-control of hazard zone in a steel manufacturing industry is studied in terms of safety management. Based on the results of risk evaluation for hazard zone, three risk zones with low, middle and high level are categorized. These zones have different color door and locking shape depending on their risk levels. At the high level, red door and key-based locking system are employed to accessed-controled path. Furthermore, tagout, lockout, interlock system for emergency stop, warning and flashing are also introduced. New standardized procedure of access-control for various hazard zones, which could help to greatly contribute to the prevention of accidents in advance, is proposed considering the risk level and the condition of given hazard zones. The standardized procedure of access-management suggested in this study will take an effective role as one of safety guide lines for hazardous workshop of manufacturing industries.

A Risk Analysis Methodology for Information Systems Security Management (정보시스템 보안관리를 위한 위험분석 방법론)

  • 이문구
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.41 no.6
    • /
    • pp.13-22
    • /
    • 2004
  • This study proposes a risk analysis methodology for information system security management in which the complexity on the procedure that the existing risk analysis methodology is reduced to the least. The proposed risk analysis methodology is composed of 3 phases as follows: beforehand processing phase, counter measure setting phase, post processing phase. The basic risk analysis phase is a basic security management phase in which fixed items are checked when the information security system is not yet established or a means for the minimum security control is necessary for a short period of time. In the detailed risk analysis phase, elements of asset a vulnerability, and threat are analysed, and using a risk degree production table produced from these elements, the risk degree is classified into 13 cases. In regard to the risk, the 13 types of risk degree will execute physical, administrative, and technical measures through ways such as accepting, rejecting, reducing, and transferring. Also, an evaluation on a remaining risk of information system is performed through a penetration test, and security policy set up and post management phase is to be carried out.

Establishment of Risk Database and Development of Risk Classification System for NATM Tunnel (NATM 터널 공정리스크 데이터베이스 구축 및 리스크 분류체계 개발)

  • Kim, Hyunbee;Karunarathne, Batagalle Vinuri;Kim, ByungSoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.32-41
    • /
    • 2024
  • In the construction industry, not only safety accidents, but also various complex risks such as construction delays, cost increases, and environmental pollution occur, and management technologies are needed to solve them. Among them, process risk management, which directly affects the project, lacks related information compared to its importance. This study tried to develop a MATM tunnel process risk classification system to solve the difficulty of risk information retrieval due to the use of different classification systems for each project. Risk collection used existing literature review and experience mining techniques, and DB construction utilized the concept of natural language processing. For the structure of the classification system, the existing WBS structure was adopted in consideration of compatibility of data, and an RBS linked to the work species of the WBS was established. As a result of the research, a risk classification system was completed that easily identifies risks by work type and intuitively reveals risk characteristics and risk factors linked to risks. As a result of verifying the usability of the established classification system, it was found that the classification system was effective as risks and risk factors for each work type were easily identified by user input of keywords. Through this study, it is expected to contribute to preventing an increase in cost and construction period by identifying risks according to work types in advance when planning and designing NATM tunnels and establishing countermeasures suitable for those factors.

Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects (건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구)

  • Eung Ho Park;Sudong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

A Framework Design of an Active Supply Chain Risk Management System from the Perspective of Shippers (화주 중심의 능동적인 공급망 위험관리 시스템의 프레임워크 설계)

  • Song, Byung-Jun;Ahn, Hye-Jeong;Rhee, Jong-Tae;Lee, Jong-Yun
    • The KIPS Transactions:PartA
    • /
    • v.18A no.4
    • /
    • pp.151-158
    • /
    • 2011
  • For the purpose of cost saving and sales promotion, various industry companies have introduced logistics management techniques in their field. However, enterprises faced to damages because proper products can not be provided to customers in basic logistics 3S1L(speedy, safely, surely, and low) principles for environments changing rapidly and inflexible business processes. So, we need the ability in coping with risk to handle this phenomenon. In particular, the shipper of key decisions of supply chain risk management requires continuous exchange and collection of logistics information in the third-party logistics. However the current SCRMS(Supply Chain Risk Management System) is not sufficient to cover the shipper's various needs and to recognize and respond to emergency situations. Therefore, this paper proposes an active SCRMS framework through the reconsideration about the previous research on SCRM and rearrangement of risk factors for coping with those problems. in addition, it verifies an efficiency through a stability comparison with the current system.

Perceptual Differences between IS Project Service Providers and Customers on Information System Project Risk Factors: a Koran case (정보시스템 프로젝트의 위험요인에 대한 현업인력과 서비스제공인력과의 인식도 차이)

  • Lee, Seog-Jun;Cho, Suk-Jin;Park, Jung-Sun;Hahm, Yu-Keun;Kim, Yong-Jae
    • Journal of Information Technology Applications and Management
    • /
    • v.14 no.3
    • /
    • pp.79-94
    • /
    • 2007
  • Cases of botched information systems implementation have been surfaced due to poor IS project management and control. One major source of such failures is the perceptual difference between the participants of IS projects who should define potential risk factors well before considered IS projects are launched. Based on risk factors cited from prior works, this paper empirically examines the risk factors associated with IS service project management to analyze perceptual differences between the IS service providers and customers in Korea. Data analyses found significant differences in the area of scheduling/resource, technological newness, communications, and sponsorship/ownership while statistically significant differences were observed in eleven individual factors out of forty six risk factors. Risk factors are also ordered in terms of perceived importance to highlight the critical differences.

  • PDF

Semi-quantitative Risk Assessment using Bow-tie Method for the Establishment of Safety Management System of Hydrogen Fuel Storage Facility in a Combined Cycle Power Plant (복합화력발전소 내 수소연료 저장설비의 안전관리 체계 구축을 위한 Bow-tie 기법을 활용한 반정량적 위험성 평가)

  • Hee Kyung Park;Si Woo Jung;Yoo Jeong Choi;Min Chul Lee
    • Journal of the Korean Society of Safety
    • /
    • v.39 no.2
    • /
    • pp.75-86
    • /
    • 2024
  • Hydrogen has been selected as one of the key technologies for reducing CO2 emissions to achieve carbon neutrality by 2050. However, hydrogen safety issues should be fully guaranteed before the commercial and widespread utilization of hydrogen. Here, a bow-tie risk assessment is conducted for the hydrogen fuel supply system in a gas turbine power plant, which can be a mass consumption application of hydrogen. The bow-tie program is utilized for a qualitative risk assessment, allowing the analysis of the causes and consequences according to the stages of accidents. This study proposed an advanced bow-tie method, which includes the barrier criticality matrix and visualized maps of quantitative risk reduction. It is based on evaluating the importance of numerous barriers for the extent of their impact. In addition, it emphasizes the prioritization and concentrated management of high-importance barriers. The radar chart of a bow tie allows the visual comparison of risk levels before/after the application of barriers (safety measures). The risk reduction methods are semi-quantitatively analyzed utilizing the criticality matrix and radar chart, and risk factors from multiple aspects are derived. For establishing a secure hydrogen fuel storage system, the improvements suggested by the bow-tie risk assessment results, such as 'Ergonomic equipment design to prevent human error' and 'Emergency shutdown system,' will enhance the safety level. It attempts to contribute to the development and enhancement of an efficient safety management system by suggesting a method of calculating the importance of barriers based on the bow-tie risk assessment.

Cost Risk Analysis for Preparing Budgets of Information Security using Fuzzy AHP (정보보안 예산 수립에서 퍼지 AHP의 적용을 통한 위험 비용 분석)

  • Ryu, Si-Wook;Her, Duk-Gyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.119-126
    • /
    • 2012
  • Recently, the breakdown of online banking servers and the leakage of customer information give rise to much concern about the security of information systems in financial and banking companies in Korea. The enforcement of security for information system becomes much more important issue than earlier. However, the security reinforcement of information system is restricted by a budget. In addition, the activities' cost to secure information system from threatening are under uncertain circumstances and should be established by a human decision maker who is basically uncertain and vague. Thus, making the budget for information system is exposed to any extent of the risk for these reasons. First, we introduce brief fuzzy set theory and fuzzy AHP (Analytic Hierarchy Process) methodology. Then, the cost elements that comprise yearly budget are presented and the priorities among the cost elements are calculated by fuzzy AHP. The cost elements that are exposed to risk are evaluated from the both perspectives of the risk impact and risk occurrence possibility which are expressed as linguistic terms. To get information on the risk profiles-pessimistic, most likely, and optimistic-for each cost element, the evaluation is accomplished and the result is presented. At last, the budget ranges-minimum, mode, maximum-for each cost element are estimated with the consideration of the risk profiles.

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

Development of Efficient Risk Analysis and Productivity Improvement System in Interface Communication Environment (인터페이스 통신 기반 개발 환경에서의 효율적인 위험도 분석 및 생산성 향상 시스템 개발)

  • Song, TaeIll;Hong, ChoongSeon;Kim, KyeongSu;Choi, HongSuk;Jeong, WonSik;Won, JongSeop
    • KIISE Transactions on Computing Practices
    • /
    • v.22 no.12
    • /
    • pp.632-645
    • /
    • 2016
  • The enterprise environment, various interface systems are utilized for business processes and for exchange of messages. In the interface communication environment, as business complexity increases, the interface system is connected with numerous systems. With increasing number of linked systems, there is a proportional increase in the workforce, leading to a rise in numerous risks (inconsistency of information, non-compliance with standards, etc.). To solve the problem, we propose a system for managing and centralizing information of the message based interface system. The proposed system enables information integration management, message information distribution, standard code generation, risk management and risk evasion. Using the proposed system, the in development environment user can prevent inconsistent information, analyze risk, avoid risk, distribute information automatically and create a standard code. Ultimately, there is an increase in user productivity and it is possible to evade the risks involved.